Development experience of Macao electric power co., ltd

1984, Guangdong province built two 1 10 kv lines from Zhuhai to connect with Macao power system, which provided electricity and improved the quality and reliability of power supply in Macao. From 1906, the company signed a regular franchise contract with the Macao government, and signed it for another 25 years at 1985. As the name implies, this is the only enterprise authorized by the government to operate electricity, and electricity monopoly is the characteristic of Macao. The Macao government has gradually changed from the largest shareholder to the smallest shareholder (7.7%), and Sino-French and Sino-Portuguese investment companies each hold 45%.

The power supply in Macau began at 1906. During the 60 years from 1906 to 1972, the power industry in Macau was managed by the head office established in Hong Kong, and was changed to "Macau Power Company Limited" at 1972. 1978, Australia Electric began to build the Luhuandao Power Plant at the southernmost Luhuandao. In the first phase, two coal-fired condensing generator sets were installed, with 20,000 kilowatts and * * * 40,000 kilowatts respectively. 198 1 year, with the support of Macao authorities, the company improved the power generation and transmission system and gradually became formal economically and technically. Therefore, two generator sets can't meet the increasing demand. 198 1, on the one hand, it signed a compensation trade power supply contract with Guangdong electric power company, with an investment of HK$ 200 million (interest-free loan), and the power transmission and transformation projects of 220kV Jiangmen to Zhuhai and1/0kV Zhuhai to Macau were undertaken by Guangdong Electric Power Department. On the other hand, in order to meet the urgent need of emergency power station construction, Macau Power Station was built in Macau Peninsula on 1983, and four medium-speed four-stroke diesel generator sets with a capacity of 32,000 kilowatts were installed. By June 1984, Guangdong Electric Power Company began to supply power to Macao, and Macao Power Grid began to become a part of China Southern Power Grid, which improved the reliability and flexibility of power supply in Macao. So far, Australia Power has owned three major power sources: Luhuan Power Plant, Macau Power Plant and Guangdong Power Supply, and the power supply situation has greatly improved.

1985 Macao authorities signed a 25-year franchise contract with Macao Electric Power Co., Ltd. 1987 Macao authorities transferred shares of Macao Electric Power, with the authorities holding 7.7%, the Sino-French investment company and the Sino-Portuguese investment company holding 45% respectively, and local investors only accounting for 2.3%. After the reform, the Australian Power Company devoted itself to the development of local power, and determined the direction of developing low-speed diesel generator sets, mainly expanding the Luhuan Power Plant. 1987 and 1988, Luhuan Power Plant completed and put into operation two 24,000 kW low-speed diesel generator sets. 199 1 and 1992, Luhuan Power Plant completed and put into operation two 36,000 kw low-speed diesel generator sets. 1995 and 1996, two 50,000 kw units were completed and put into operation. Almost every 3-4 years, two units are put into production, and the capacity of each unit is increasing every time. At present, the total installed capacity of Luhuan Power Plant has reached 260,000 kilowatts, which is the main power plant of Australia Power.

In order to solve the problem of domestic and industrial waste, the Macao authorities decided to build three waste incineration plants in March, 1987, 1 12000 kw generator sets, with 30% of the plant power consumption and the rest sold to Australian power companies. 1992 April ~ 1 1 month to complete the first phase project, 1992 1/month to complete the second phase project,19921month.

After the reorganization, with good service quality and appropriate investment strategy, with the continuous growth of power supply in this area, all aspects of the work of Australian power companies have entered the right track. From 1989 to 1998, the total capacity of power generation equipment increased from183,000 kilowatts to 352,000 kilowatts, an increase of 92.3% in nine years; The maximum load of power grid increased from176,000 kilowatts to 335,000 kilowatts, an increase of 90.3%; The power generation increased from 70 1 10,000 kwh to144.5 million kwh, an increase of106.1%; Electricity sales increased from 676 million kWh to151500 million kWh, an increase of 124 1%. The electric power industry has developed steadily.