Shuangyouguo Resettlement House Company in Jiayu Town, Xingyang City won the bid.
Announcement of public bidding for the first phase design, geological survey and supervision project of Shuanglouguo in Jiayu Town, Xingyang City (twice in the first bid section and the second bid section) I. Bidding conditions The first phase design, geological survey and supervision project of Shuanglouguo in Jiayu Town, Xingyang City (twice in the first bid section and the second bid section) has been passed. The project uses state-owned funds, and the tenderer is Zhengzhou Zhongxing Real Estate Co., Ltd. The project has met the bidding conditions and is now open for bidding. Two. Project overview and bidding scope 2. 1 project name: design, geological exploration and supervision project of Shuanglouguo Phase I, Jiayu Town, Xingyang City (bid 1 and bid 2 twice); 2.2 ProjectNo.: Xing [202 1]00422.3 Project construction site: Jiayu Town, Xingyang City; 2.4 Total investment: about 1, 9 1.3 million yuan; 2.5 Duration: The design duration of the first bid section is 30 calendar days; The survey service period of Bid Section II is 30 calendar days; 2.6 Quality requirements: meet the requirements of current national industry norms and technical standards; 2.7 Construction scale and content: The project plans to build four residential buildings in shanty towns, supporting the construction of commercial housing, road works, greening projects and public service houses. The construction land area is about 52,502.63 square meters, with a total construction area of about 80,000 square meters. It is planned to resettle 204 households with 8 1 1 villagers. 2.8 Bid division: This project is divided into two bid sections. The first bid section: to undertake all the construction drawing design and corresponding follow-up services within the construction content of this project, including scheme design, preliminary design, architecture, structure, water supply and drainage, heating and ventilation, electricity, civil air defense and fire protection, with an investment of about 6,543,800 yuan; The second bid section: to undertake the initial survey, detailed survey, on-site service and other follow-up services in the construction stage within the scope of this project, with an investment of about 473,000 yuan; 2.9 Bidding scope: all contents within the bidding documents.