What is the standard for reducing the project cost in expressway in 2022?

5- 10. According to the information released by the comparison of price limits, the downward standard of project cost in expressway in 2022 is normal within the range of 5- 10, and the specific conditions such as the difficulty of consulting services are downward within the standards specified in the attached table, but the downward range shall not exceed 20%.