Introduction of Chongzun Expressway?

Chongzun Expressway is the section from Chongxi River to Zunyi of G75 Blue Ocean Expressway, with a total length of 1 17.88 km, starting from Chongxi River at the junction of Chongqing and Guizhou, passing through Songkan, Xinzhan and Tongzi, and ending at Zhongzhuang, Honghuagang District, Zunyi City. Zhong Da Consulting consulted all kinds of building websites to obtain information about Chongzun Expressway:

brief introduction

The demonstration of Zunchong Expressway started from 199 1, and construction started on 1 in July 2002, and it was completed and opened to traffic on February 26, 2005. Since then, China Southwest Expressway has been opened to traffic, connecting Chongqing, Guizhou, Guangxi and Guangdong.

Starting point: Zhongzhuangpu, Honghuagang District, Zunyi City

End point: Chongxi River at the junction of Chongqing and Guizhou

Full length:117.88km.

Southwest sea passage is an important part of the "five vertical and seven horizontal" national trunk network planned and constructed in China. This high-grade highway artery starts from Chongqing in the north and ends in Zhanjiang, Guangdong in the south. It runs through Chongqing, Guizhou, Guangxi, Guangdong Province, cities and districts, and passes through important cities such as Chongqing, Zunyi, Guiyang, Nanning, Beihai and Zhanjiang, with a total length of 1, 3 1.4 km. It is the main channel from the southwest of China to the south China coast.

General situation of investment and construction

Chongzun Highway is the "throat" project and the last key section of the southwest sea passage. It starts from Zhongzhuangpu, Honghuagang District, Zunyi City and ends at Chongxi River at the junction of Guizhou and Chongqing. Full-length117.88km, two-way four-lane, full-line bridge and tunnel connection, huge investment. The ratio of bridge to tunnel is high and the construction is difficult, which has set a record in the history of highway construction in China. * * * 84 extra-large bridges, bridges and medium bridges with a length of 22.2 kilometers; There are 0/7 tunnels/kloc-with a length of 18.7km, and the total length of bridges and tunnels is 40.9 km, accounting for 35% of the total length of the line. The total investment of the project is 6.9 billion yuan, of which 200 million dollars is borrowed from the Asian Development Bank.

Liangfengya Tunnel is the key control project of Chongzun Expressway, and the left and right tunnels are 4085 meters long respectively. The project is located in the canyon area between Sichuan Basin and North Guizhou Plateau, and the tunnel passes through karst, underground river, fault fracture zone and gas section, so the construction is very difficult.

Socioeconomic significance

The opening of Zunchong Expressway marks the official completion of China's first high-grade and fast southwest sea passage (Yuzhan Expressway).

Yuzhan Expressway passes through Zunyi, Guiyang, Duyun, Nanning, Qinzhou, Beihai, Zhanjiang and other important cities, connecting industry, agriculture, tourism and transportation along the expressway into a whole market, forming a development pattern with complementary advantages, thus promoting the rapid economic development of Chongqing, Guizhou, Guangxi and Guangdong in the western development, and its influence radiates throughout the southwest region. This large passage is the nearest and fastest sea passage in southwest China at present, and it is also an important logistics passage connecting northwest and southwest China with South China.

Experts pointed out that with the deepening of the western development strategy, the start of the China-ASEAN Free Trade Area process, the signing of closer economic and trade relations between the mainland and Hong Kong, and the initial construction of the Pan-Pearl River Delta economic circle, the economic and trade ties between southwest China and the Pearl River Delta have become closer. Southwest Economic Circle, South China Economic Circle and Indo-China Peninsula Economic Circle will open up the flow of people, logistics and capital, and form a win-win pattern in the process of regional economic integration. After the completion of the southwest sea passage, its regional competitiveness will be greatly enhanced.

The above is the introduction of Zhong Da Consulting of CBI to Chongzun Expressway. For more information about expressways, please pay attention to the architectural knowledge column of Zhong Da Consulting.

For more exclusive information about the construction industry, please pay attention to the micro-signal of the construction network in real time.

For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.