What qualifications do photovoltaic power generation companies need?

Abstract: With the rapid development of photovoltaic power generation industry, many people also want to enter the photovoltaic industry. However, starting a photovoltaic power generation company is not that simple. There are many things to be prepared, so what qualifications do photovoltaic power generation companies need? How to register a photovoltaic power generation company? Enterprises must have a power business license to invest in photovoltaic power plants. Let's learn more about the registration of photovoltaic power generation companies. 1. What qualifications does a photovoltaic power generation company need?

To invest in photovoltaic power plants, enterprises must have the qualification of photovoltaic power generation, including the Power Business License, in which "solar energy, wind energy, biomass energy, ocean energy, geothermal energy and other new energy power generation projects with installed capacity below 6MW (excluding); Power generation business can be exempted from power business license.

Issuing Authority: The former State Electricity Regulatory Commission has been merged into the National Energy Administration.

Grading: regardless of grade.

The application period of photovoltaic projects (especially ground photovoltaic power plants) can be roughly divided into four stages: preliminary preparation stage, implementation stage and commissioning stage. Among them, the production and operation stage is mainly led by the owner, and the first three stages need to hire a "professional third-party organization".

1, early

The preliminary work includes: project planning, project proposal (pre-feasibility study), feasibility study and project evaluation. At the same time, some supporting work such as environmental assessment and soil and water conservation should be done.

1) engineering consulting qualification certificate

With the change from "examination and approval system" to "filing system", local governments are not strict with the qualification requirements of third-party institutions that have completed the preliminary work, but as responsible enterprises, they still need to find third-party institutions with "engineering consulting qualification certificates" to carry out it.

Issuing Authority: National Development and Reform Commission

Classification: Grade A, Grade B and Grade C. ..

2) Engineering survey certificate

Issuing Authority: Ministry of Housing and Urban-Rural Development

Classification: Grade A, Grade B and Grade C. ..

3) Qualification certificate for environmental impact assessment of construction project

Issued by: Ministry of Environmental Protection

Classification: Grade A, Grade B and Grade C. ..

4) Qualification certificate of safety evaluation institution

Issuing Authority: state administration of work safety.

Classification: Grade A, Grade B and Grade C. ..

5) Qualification certificate of water and soil conservation scheme preparation

Issued by: China Soil and Water Conservation Association.

Classification: Grade A, Grade B and Grade C. ..

6) energy-saving assessment institutions for the record.

Issuing Authority: Relevant administrative departments of each province.

Classification: Grade A, Grade B and Grade C. ..

2. Preparation stage and implementation stage

The preliminary work includes: construction drawing design and project bidding.

The work in the implementation stage includes: equipment procurement, engineering construction and equipment installation.

1) qualification certificate of engineering bidding agency

According to national regulations, general photovoltaic projects need bidding.

If it is conducted in the form of EPC, the general contractor will be invited, and then the general contractor will be responsible for the specific equipment and construction bidding; If the owner does it himself, he needs to bid separately for equipment and construction. But in either case, you need to find a bidding agency.

Issuing Authority: Ministry of Housing and Urban-Rural Development

Classification: Grade A, Grade B and Grade C. ..

2) Construction enterprise qualification certificate

Issuing Authority: Ministry of Housing and Urban-Rural Development

Grading: Level 1, Level 2 and Level 3.

3) Engineering design qualification certificate

The construction drawing design is related to the rationality and reliability of the project scheme, which directly determines the investment of the project. An experienced and responsible design company will save a lot of investment for the owners by choosing an optimized design scheme.

Issuing Authority: Ministry of Housing and Urban-Rural Development

Classification: Grade A, Grade B and Grade C. ..

4) Permit for undertaking (repairing and testing) of power facilities

Issuing authority: Local Supervision Bureau of National Energy Administration.

Grading: Level 1, Level 2, Level 3, Level 4 and Level 5.

To sum up, each certificate has a major, usually electric power, new energy, solar energy, or a comprehensive major. Qualifications cannot be used across disciplines, and certificates are graded. Different grades of projects have different scales. The certificate qualification is valid and should be used within the validity period.

Second, how to register a photovoltaic power generation company

1, steps to register an enterprise

The process of registering a company includes the following steps:

(1) enterprise name approval; (2) sending materials online; (3) apply for a license; (4) The company engraves the official seal; (five) the bank opened in basic deposit account; (6) Registration with the tax authorities; (7) tax receipts; (8) Entrepreneurship.

2. Registered enterprise information

The materials required to register a company include: (1) enterprise name; (two) the identity certificate of the investor; (3) The business scope of the company; (4) The business address of the enterprise.

3, registered enterprises must spend

At present, the cost of registering a company is very affordable, the government cost is zero, and the agency cost can also be zero. As long as the registered enterprise pays the engraving fee, the administration will also give the company an official seal. So friends don't have to change their decision to register a company because of the cost.

4. Time required to register a company

At present, registered enterprises are very fast and can be completed in about 2 working days. But if you are not familiar with the process of registering a company, it is easy to waste time. So I suggest you find an agency to improve the efficiency of registered enterprises.