Work Summary of Economic and Technological Development Zone 1 I. Work Development
1, industrial project. In the first half of the year, the investment was 3.5 billion yuan. Start-up group high-precision aluminum strip production line project, civil engineering started in an all-round way, ordering imported equipment; Venture Group's annual output of 6.5438+400,000 tons of high-grade industrial aluminum profile project, some main equipment installation; Qi Xing Group's high-strength aviation aluminum expansion project, civil construction, some equipment ordering; Innovation Group has an annual output of 654.38+10,000 tons of light alloy materials for rail transit. The procedures of project establishment, environmental assessment and energy rating have been completed, and the fence construction and site preparation have been completed. Innovation group's high-end precision automobile aluminum alloy rim project, all equipment installed, a production line trial production; Hamamoto thermal power plant project, install No.2 and No.3 boilers and order No.4 boilers; The pre-baked anode project of Innovation Group is going through the formalities of project establishment and environmental assessment, and the preliminary design has been basically completed. Tianyang Carbon Company expanded the prebaked anode project, the infrastructure was basically completed, and some equipment was installed; Fire fighting equipment engineering, infrastructure completion and equipment installation of Ping An Fire Fighting Company.
2. Tertiary production projects. In the first half of the year, the investment was 58 million yuan. Two standard warehouses of Dayun Logistics Center have been built and put into operation, and the road on the east side of the logistics center is under construction. The declaration of bonded logistics center is progressing smoothly. Especially since the beginning of this year, with the vigorous promotion of the county party committee and county government, the municipal government and the customs have attached great importance to it and set up a leading group for the joint office of declaration work, which has effectively promoted the development of declaration work in depth. In addition, the operation of logistics companies is progressing smoothly. The company has signed a cargo storage agreement with Swiss Glencore Co., Ltd., the largest buyer of raw materials in the world, and 30,000 tons of alumina powder has been put into storage in the early stage. In addition, the international textile city project has been partially completed, and the building materials and furniture wholesale market is attracting investment; Main body construction of the third phase project of the residential area; Indoor and outdoor installation construction of the second phase of the square project.
Since the beginning of this year, we have seized the important opportunity of upgrading the development zone to the national level, participated in the investment project fair of key economic development zones, the association of institutions in China and other activities, vigorously publicized and promoted the development zone, and improved its visibility. Focusing on the three industrial chains of home textiles and clothing, new materials, food and medicine, we will increase the industrial chain extension and industrial supporting investment, and introduce the Capital Group's high-precision aluminum strip production line project with an investment of 6.28 billion yuan, the Innovation Group's light alloy material project with an annual output of 654.38+07 billion yuan, and the high-precision aluminum foil project of science and technology companies with an annual output of 654.38+07 billion yuan. Actively encourage enterprises to go public for financing. China Hongqiao was listed on the Hong Kong Stock Exchange, raising HK$ 6.372 billion, which was the largest IPO of the Hong Kong Stock Exchange during the year. Up to now, there are 8 listed companies at home and abroad in the region. In addition, the development zone also introduced 654.38+0.3 billion yuan of funds from outside the county to meet the needs of its own construction, and completed the task of attracting investment arranged by the county party Committee and the county government ahead of schedule.
The infrastructure construction has achieved remarkable results. In the first half of the year, the investment in infrastructure construction was 24.8 million yuan. The first is the greening and beautification project. Five greening and beautification projects were implemented on the main roads in this area, and 300,000 saplings were planted. The second is the road construction project. Completed the repair project of the road surface covering more than 4,900 meters in Huixian No.1 Road and the pit and groove in the north outer ring. The third is the drainage and sewage pipe network project. Omni-directional rain and sewage pipe network laying project is 2500m. The fourth is to carry out land acquisition and demolition work in a down-to-earth manner. Land requisition for green belt project 170 mu; The demolition work is also progressing smoothly.
Attach importance to education investment. The preparatory work for the third primary school in the development zone is progressing smoothly. The main body of the teaching building has been completed, and indoor and outdoor installation construction is under way. In the second half of the year, the preparatory work for freshmen is being carried out in an intense and orderly manner to ensure the smooth enrollment of freshmen. Other social undertakings, production safety and other management work have been carried out in a solid manner and new achievements have been made.
Second, the main problems and shortcomings
1, the pace of transformation and restructuring of industrial enterprises in the region needs to be further accelerated and strengthened; The pressure to complete the task of energy conservation and emission reduction is still great.
2. The development space is seriously insufficient, and many large and good projects with high scientific and technological content and good development prospects cannot be developed;
3. The weak independent innovation ability of enterprises in the area restricts the improvement of the quality level of economic development in the development zone;
4. The management system and mechanism of the Development Zone need to be further rationalized.
Summary of Economic and Technological Development Zone Work We can achieve such achievements in the first half of 20xx without the correct leadership of the town party committee and government and the support of the industrial and commercial tax authorities. We also have a solid foundation, that is, a team with excellent politics, professional skills, excellent style, courage to fight hard and good at fighting hard. At the beginning of the year, we unified employees' work clothes, visited brother units that are often in the forefront of the industry, compared their working methods and systems, revised the working system according to our own situation, reiterated labor discipline, and first set out to change the mental outlook of the team. Secondly, employees are required to actively learn theoretical knowledge to improve the overall quality of the team; Take "all for investors" as the purpose, and correct the service attitude. These measures have played a very good role in practical work. Our achievements from June to June 2008 are a good proof of these measures.
First, development depends on services.
We decompose the management of the settled enterprises into layers and implement them to people. The company implements a full-time manager system and pays close attention to household management. At the beginning of the year, all departments of the company went to relevant enterprises for investigation, interviews and discussion, obtained first-hand information, carefully analyzed the changes of tax sources and the overall situation of tax revenue, and made plans and arrangements in advance, and scientifically negotiated, communicated and arranged with the tax authorities according to the tax sources mastered by the investigation, thus achieving a good start in the first quarter. At the same time, every employee is also required to contact and visit the enterprises in charge from time to time, grasp the dynamic situation, timely summarize the enterprises with sudden decline or sharp increase in tax revenue, timely inform the annual inspection of industry and commerce and tax revenue, timely communicate with various information such as enterprise settlement and tax source introduction, and firmly grasp the initiative. This year, a reward and punishment assessment system linked to work performance has been introduced, which rewards employees who have made a difference in attracting investment, rewards employees who have overfulfilled the agency bookkeeping task, and punishes employees who have failed to complete the task. Clear responsibilities are defined, employees' enthusiasm is improved, and rewards and punishments are given simultaneously, rewarding the excellent and punishing the poor, so that all employees are under pressure and motivated to act. Services have improved, enterprises are satisfied, taxes have increased, and our development zone has grown.
Second, the existing problems
Looking back on 20XX, the total tax revenue was close to 65.438+0.7 billion yuan, an increase of 654.38+0.6% over 2006. However, corporate income tax has increased by nearly 54%. The main reason for such a large increase is that since 2007, the previously approved corporate income tax rate has increased, especially for trading enterprises, from the original 0.5% to 654.38+0.26%. In 2007, the enterprise income tax increased by19.47 million yuan compared with 2006, a large part of which was brought by this adjustment. From June 2008, the approved enterprise income tax will be levied at different levels. For example, the corporate income tax rate of trading enterprises is calculated as 1.75%. In June, the enterprise income tax rate of trading enterprises was lowered again, from the original monthly declaration to quarterly declaration, to 1%, and it was uniformly collected from June 2008. For example, an enterprise has paid income tax 1.75% from June to June, but according to the current tax rate 1%, it only needs to pay 57 14.29 yuan, and the excess will be deducted as an advance payment when the enterprise pays income tax after that year.
This adjustment will have a great impact on the income of enterprise income tax in 2008, which may greatly reduce the income of enterprise income tax in 2008 and have a great impact on the jurisdiction of our development zone. From June to June, 2008, the enterprise income tax was RMB 314600, which was under the jurisdiction of our development zone18940. In 2007, the total enterprise income tax was 55.8 million yuan, and the area under the jurisdiction of our development zone was 39.93 million yuan. Some tax paying enterprises pay enterprise income tax according to the audit. This adjustment has no impact on these enterprises. Most of the branches of these enterprises are in the steel market (under the jurisdiction of commercial investment companies) and production enterprises in industrial zones (under the jurisdiction of industrial companies). Most of the companies under the jurisdiction of our development zone are trading enterprises distributed in various regions of the city, which is the main target of this tax rate reduction. Compared with 2007, the enterprise income tax under the jurisdiction of our development zone will be greatly reduced, and the amount is likely to be above10 million.
Summary of Economic and Technological Development Zone ××× Economic and Technological Development Zone Management Committee Office, under the correct leadership of the county party committee and government, with the strong support of relevant departments, took the economic tasks assigned by the county party committee and government at the beginning of the year as the goal, combined with the actual situation of the development zone, carried out all-round work and successfully completed all tasks assigned at the beginning of the year. The following is a summary of the work in the past year:
First, the basic work has been further improved.
1, development zone. The three parks are managed separately. At the beginning of the year, in order to make the development zone develop better and faster, the county party committee and government mobilized all their strength and enthusiasm, and entrusted the management of the wine garden in the development zone to Balihan Town Government, while Sefia Park was entrusted to Xizi Town Government for coordinated management. Park Office is responsible for Zhongjing Park, and macro-management and coordination of wine garden and Safiya Park. This decision eased the pressure on the park office, mobilized the enthusiasm of the two town governments, and increased the management and investment of the park.
2. Through one year's practice, the decentralization of the management rights of the two parks has aroused the enthusiasm of many parties and is conducive to promoting the rapid development of the development zone. Infrastructure has been further strengthened. In terms of infrastructure, the Park Office coordinates the Forestry Bureau and other relevant departments to afforest Zhongjing Park. More than 300 landscape trees/kloc-0 were planted. Invest 5,000 yuan to set up a garbage dump, with designated garbage dumps. The problem of littering in the park has been solved. According to the arrangement of the county party committee and the county government, the administrative committee office of the Development Zone has acquired 500 mu of land for Dalian Huaru, and has completed all the land acquisition procedures, which has expanded the development space for the development of the park.
3. The guarantee company began to operate normally. At the end of last year, with the strong support of the county government, the government invested 5 million yuan to set up a development zone guarantee company. The establishment of the guarantee company has solved practical difficulties for speeding up the development of the development zone and solving the shortage of funds for small and medium-sized enterprises. It laid a foundation for the development of the development zone and the development of enterprises.
4. According to the requirements of the National Development and Reform Commission and the Autonomous Region Development and Reform Commission, each development zone is not allowed to have multiple parks in one area. According to the requirements, the Park Office has re-planned, expanded the original land of Zhongjing Park from 180 hectares to 230 hectares, re-surveyed the coordinate points, made a planning map, and reported it to the Development and Reform Commission of the autonomous region for approval in mid-June.
Second, the project construction is progressing smoothly, and all enterprises entering the park are put into production.
In the project construction in xx years, the dispatching of the original enterprises was intensified. At present, the enterprises settled in the park have been fully put into production. Zhongjingyuan Oriental Wanqi has successfully produced 6,500 heads with an output value of 28 million yuan. Tianyu group has signed an agreement with Vic company in the United States, and the land use problem has been solved. Vegetable production in Ruian has started, and Tang Dasheng Pharmaceutical Co., Ltd. has completed infrastructure construction and started processing Chinese herbal medicines. Chifeng Fule Veterinary Medicine Co., Ltd. started planning and design, and started construction next spring. Sefia's 50,000-ton cooked food processing project has started construction, with an investment of 30 million yuan, including the construction of cold storage, slaughtering line, cooked food processing workshop and the purchase of equipment. The duck farm expansion project has been completed 18 factory building construction; The bio-fertilizer project has completed the construction investment of180,000 yuan; Information project completed19.28 million yuan, including central computer room, equipment purchase, network platform, etc. Sanquan Biotechnology Co., Ltd. in Wine Industry Park has completed the first phase investment of 4 million yuan and put it into trial production; The investment of activated carbon project is 3 million yuan, and the civil construction is progressing smoothly at present.
Third, increase the intensity of attracting investment, accelerate the pace of attracting investment, and better achieve various economic indicators.
According to the industrial projects determined by the county in xx years at the beginning of the year, there are 0/5 development zones/kloc, with a total capital of 240 million yuan and a task of attracting investment of 22 million yuan. So far, the project investment has reached 80 million yuan. Among them, there are 4 continuation projects, 4 expansion projects 1 and 6 new projects.
(1) Take active measures and formulate effective measures to attract investment in all directions. In xx, the office of the Development Zone Management Committee took the opportunity of "Project Speed-up Year", and the infrastructure of Zhongjing Industrial Park and xx Wine Garden was completed in the first phase, which met the needs of enterprises entering the park, so we took XX as a key year for attracting investment. First, do a good job in the construction of continuous construction projects of settled enterprises and increase new investment; The second is to introduce new projects, relying on the good facilities and preferential policies of the park to attract funds from inside and outside the county to enter the development zone to run enterprises. To this end, we mainly take the following measures and methods:
1. A leading group for attracting investment, headed by the director of the office of the Administrative Committee, was set up, and the Investment Promotion Section was specifically responsible for attracting investment, which was conducted in all directions and in various forms.
2. Continue to improve the infrastructure of the park and create favorable conditions for enterprises to enter the park. The project of Dalian Huaru Group acquired 500 mu of land, which ensured the smooth implementation of the project construction.
3. Continue to optimize the investment environment and provide all-round services for enterprises entering the park. Coordinate with relevant departments to handle various licenses for enterprises in the park, and actively serve enterprises in the park in strict accordance with Several Provisions on Preferential Policies for Investment Promotion in XX Economic and Technological Development Zone. The Development Zone implements "fully enclosed management", and the inspection and charges of relevant departments are implemented according to the documents issued by the XX Municipal People's Government. Coordinate the tax authorities to implement greater preferential treatment for enterprises entering the park, so that the tax revenue inside and outside the park is different, and attract enterprises to enter the park and set up factories with foreign investment through policies.
4. Vigorously publicize and create an investment atmosphere. Publicize the good infrastructure conditions and preferential policies of the development zone through various news media, publicize the development zone through visits to foreign development zones and other opportunities, and issue the Investment Guide of the Development Zone to publicize the development zone.
In short, publicity should be done through various forms and means to create a good atmosphere for attracting investment.
Take various forms and channels to attract investment, go out, please come in and seek comprehensive cooperation. In the first half of the year, we invited merchants to visit the development zone by going abroad and using various visits and conferences to attract investment, network investment, business investment and enterprise investment. At present, some have signed an agreement, and some have reached an agreement of intent.