Progress in the construction of Dachucheng

Since the construction of "Dachucheng", 73 urban public facilities have been started, with a project cost of 4.68 billion yuan and a cumulative investment of 3.337 billion yuan. 73 urban infrastructure projects have been completed (excluding projects in Langya District, Nanqiao District and Economic and Technological Development Zone).

As an urban flood control project, the total length of Xipi Honggou Project is 10.68km, and the area for intercepting incoming water from flash floods is 1 1.56 km2, accounting for 75.6% of the flash flood area. The population, property and GDP within the scope of protection account for about 70% of the whole urban area. At present, the flood discharge ditches have all been connected and have normal flood control capacity. The first phase of Liu Qing sewage treatment project has been put into trial operation. About 20,000 tons of urban sewage originally flowing into Liuqinghe will enter the municipal Liu Qing Sewage Treatment Plant for treatment, and the previously dirty Liuqinghe will be cleaned up soon. Liu Qing Sewage Treatment Plant is located in Xuming Village, Hongmiao Village, Liu Qing Office, Langya District. The approved construction scale of the project is 654.38+10,000 m3/day, and the first-phase construction scale is 50,000 m3/day. After operation, the treated urban sewage will reach the first-class B standard of Pollutant Discharge Standard for Urban Sewage Treatment Plants.

Chuzhou Municipal Solid Waste Sanitary Landfill is located in a natural ravine in Dongtianying Village, Qiao Lei Village, Yangzi Office, Langya District, covering an area of 4 10 mu. The leachate treatment station of No.2 Project has been commissioned this year, and all indicators of treated water samples have reached the first-class discharge standard.

Liu Qing Park and Lianxin Lake Park have been built. Beihu Park is under construction. The inner city river reconstruction project (from Sheung Shui Pass to XiaShui Pass) is undergoing land acquisition compensation. The second bus parking lot project has been basically completed, which has basically solved the bus parking problem that has plagued Chuncheng for many years, and at the same time realized the unified bus dispatching in the city. Chucheng originally had a bus parking lot, which could only accommodate 1 10 buses. At present, there are 2 10 buses in Chucheng, and about 100 buses are parked on the roadside. The second bus parking lot is located in Chuzhou Economic and Technological Development Zone, which can meet the requirements of 170 standard bus parking, maintenance, refueling, production, dispatching and management. As one of the three major districts in the central city of Chuzhou, Chengnan New District is the administrative, commercial, cultural and sports center of Chuzhou. After less than a year of construction, the road to the north of Longpan Avenue has been completed, and some roads to the south of Longpan Avenue, such as administrative center, Chuzhou Middle School, experimental primary school, Longpan Community, Tongleyuan resettlement house, have been completed. Longpanhe Park, Sports Center, Second People's Hospital and New District Road have all started.

The roads in Chengnan New District adopt a "grid" structure, which is divided into three grades: urban main roads, urban secondary roads and urban branch roads. Chengnan Avenue is about 8 kilometers long and 60 meters wide. It is an important axis for the construction of the south new district and the only way for Chuzhou to connect with the new Beijing-Shanghai-high-speed railway station. It is also the political, economic, cultural and transportation center of the future city. According to the design of urban main roads and expressways, the design speed is 60 kilometers per hour, and the expressway is 2 1 meter. There are also green belts, slow lanes and sidewalks. Using asphalt concrete pavement, it has been completed and opened to traffic. Since the construction of Dachucheng, 32 resettlement housing projects have been started, with a construction area of 3,657,800 square meters, with a planned total investment of 8,346 million yuan and a completed investment of 3,768 million yuan. There are 20 resettlement housing projects under construction, with a total construction area of 2,860,700 square meters, with a planned total investment of 705 1 billion yuan, and the completed investment of 20 1 year is 654,388+382 million yuan, with a cumulative investment of 2,478 million yuan, accounting for 35 1% of the plan. In 2009, 98% of 5 resettlement sites, 39% of 12 resettlement site and 0.8% of 3 resettlement sites were completed. Last week, the weekly progress of 20 resettlement housing projects was not behind. Among them, the Longpan community expansion project, the second phase of entrepreneurship in the Central Plains, and Liu Qing family resettlement sites have made rapid progress. Military optical cable migration in Yangzi road residential area; Planning permits for Xijian Road, Tianchang West Road, Xijian Garden Phase II and Chuangye Nanyuan Phase II; Review of fire protection schemes for some resettlement houses; The expansion of Longpan residential area and the problem of rainwater outlet in the second phase of Tongleyuan East District have affected the construction of resettlement houses.

Langya Mountain tourist area is planned to be 240 square kilometers. At present, the construction of Langya Mountain tourist resort has started, and the ancient Langya Mountain road has been comprehensively rectified. The comprehensive renovation project of Langya Mountain Ancient Road starts from the gate of Langya Mountain Scenic Area in the west and ends at the copper mine turntable in the east, with a total length of 935 meters. The first phase of the project transformed the original roads, landscape greening and street lamps, and was successfully completed on April 30, 2009; The second phase of the project is the parking lot construction of Langya Ancient Road, which was completed at the end of April 2009. The completed parking lot covers an area of 12000 square meters, and there are 1 10 parking spaces. The third phase of the project is the construction of the pedestrian street in Langya Mountain Scenic Area, which is used for tourists' leisure, entertainment and shopping. The project started in June 2009 and is scheduled to be completed by the end of 2009. On June 6, 2009, the Management Committee of Langya Mountain Scenic Area and the Management Committee of Langya Mountain National Forest Park in Chuzhou City were established and unveiled. Langya Mountain Management Committee is a public institution directly under the municipal government, with a main hall level. Entrusted by the municipal government, responsible for the protection, management, utilization and construction of Langya Mountain Scenic Area.

1. Prepare detailed planning of Zuiwengting Scenic Area, Wei Long Scenic Area and Fengle Pavilion Scenic Area;

2. Comprehensive renovation of Fengle Pavilion scenic spot and Zuiwengting core scenic spot;

3. Construction of Wei Long International Tourism Center and Fenghuang Lake Eco-tourism Business District in Langya Mountain Tourist Area:

4. Actively promote the Jurassic theme park project;

5. Start the construction of the widening extension of Lanshan Road. As a group of "Dachucheng" 13 1, Nanqiao New District, while giving full play to its geographical position and resource advantages, insists on selecting the right direction and positioning accurately, takes "six highs" as the core and breakthrough, keeps up with the pace of the times, and strives to build a new city with distinctive characteristics on a blank sheet of paper. First, planning leads to a high starting point. Open bidding at home and abroad, invite well-known experts and introduce advanced concepts to ensure that the planning and design of Nanqiao New District, market town and new countryside are in place in one step.

Second, construction projects reflect high grade. In accordance with the requirements of "macro-bold, micro-elaborate" and "reflecting ingenuity, highlighting characteristics and creating fine works", we will strive to create a number of bright spot projects and fine works that fully reflect modern atmosphere and regional characteristics.

The third is to broaden financing and reflect high intensity. Introduce market competition mechanism and diversified investors, and establish a diversified investment and financing system combining financial input, resource integration and market-oriented operation. Successfully raised 260 million yuan in the first half of the year; The second phase of state-owned assets transfer is about to be completed, and the total assets of state-owned operating companies will increase to 870 million yuan.

Fourth, land replacement reflects high standards. All the basic farmland in the urban planning area has been sold, and some key construction areas have been adjusted to reserve land for construction, and the construction land replacement and linkage work has been actively carried out. This year, six batches of replacement projects have been reported to the provincial office for reclamation acceptance, and four batches of projects linked to increase or decrease have been approved by the provincial level.

Fifth, the demolition and resettlement reflects high speed. In the first half of the year, 58 teams composed of district units and township cadres completed the demolition task of nearly 300,000 square meters with high quality and high speed, and the resettlement houses under construction reached 670,000 square meters.

Sixth, the innovation mechanism reflects high efficiency. Innovate the talent guarantee mechanism, fully implement the innovation mechanism of new district construction, market town transformation and key project engineering headquarters, and establish the leadership lead responsibility system and supervision coordination promotion system in 35 key project areas to ensure the efficient operation of all work. The greening and upgrading project of Chucheng started in March 2009, with a total investment of 654.38+0.2 billion yuan. The whole project includes Langya Road, Liu Qing Road, Huayuan Road, Yuxin Road, Wei Zi South Road, People's Square, Beiguan Turntable, etc. 12 greening project and subsequent projects. All projects will be completed before the end of 2009, with an additional green area of about 450,000 square meters.

After the completion of the Xijian Road expansion, widening and reconstruction project, it is an important road integrating traffic, landscape, fire protection and other functions. The project started in August 2009 and is scheduled to be completed in June 10. The main lane of Fengyang Road Reconstruction Project is 2 1 m, the green belt is 3m, the slow lane is 6m, and the sidewalk is 5m. Construction started in March 2009 and was completed and opened to traffic at the end of September. The comprehensive improvement project of Nanhu Lake was launched in an all-round way. The first phase of dredging, slope protection and surrounding lighting, greening and beautification have all ended; In the second phase of landscape renovation in Song Cheng, the demolition has all ended and the landscape construction is under way; The third phase of the stadium was moved and submerged, and the fourth phase was connected with the fishing center. The preliminary investigation and relocation mobilization are in progress.