A brief history of Maanshan iron and steel co., ltd.

The full name of the company is Maanshan Iron & Steel Co., Ltd., which is a joint stock limited company reorganized and established on the basis of the state-owned enterprise Maanshan Iron & Steel Co., Ltd. ("Maanshan Iron & Steel", now renamed Maanshan Iron & Steel (Group) Holding Co., Ltd.). 1February, 953, Maanshan Iron Mine was established, and Maanshan Iron and Steel Co., Ltd. resumed production in an all-round way. On August 1958+0 1 day, Maanshan Iron and Steel Company was formally established. On September 20th, 1958, 1959, 65438+1October 29th, President Mao Zedong visited Masteel twice.

1964 On July 29th, China's first integral wheel with a diameter of 840mm was born in Maanshan Iron and Steel Co., Ltd., ending the long-term dependence on imports of wheels and rims in China. On May 28th, 1987, the high-speed wire rod mill with an annual output of 400,000 tons in Masteel was officially completed and put into operation, which is the first high-speed wire rod mill with international advanced level in China.

1 99265438+February1,the second steelmaking plant of Masteel realized full continuous casting. 1September 2, 993, Maanshan Iron and Steel Group Co., Ltd. and Maanshan Iron and Steel Co., Ltd., one of the first nine standardized joint-stock pilot enterprises in China,

1On April 26th, 994, Masteel's 2500m3 blast furnace system was completed and put into operation. 1994 may 13, the state foreign economic and trade commission approved Maanshan iron and steel co., ltd. as a sino-foreign joint venture. 1On August 7th, 994, a new type of rim processing line with an investment of 654.38+600 million yuan was officially put into production.

1On July 4th, 1998, Masteel rolled the first domestic H-beam, and the first H-beam production line with an annual output of 600,000 tons was built in Masteel.

1September 20, 1998, Maanshan Iron and Steel Co., Ltd. was successfully transformed into a group company, and Masteel Corporation 200 1 12 18 broke ground on the hot-rolled plate production line of Masteel. In August 2002, Masteel's cold-rolled sheet project officially started construction.

On March 8, 2003, the high-speed wire rod production line of No.2 Steel was successfully put into production. June 65438+1October 65438+June 2003, No.2 2500 m3 blast furnace of Maanshan Iron and Steel Co., Ltd. was completed and put into operation, which marked that the annual pig iron production capacity of Maanshan Iron and Steel Co., Ltd. jumped to a new level of 8 million tons. On June 65438+1October 65438+August, 2003, the first coil was successfully rolled on the hot-rolled plate production line, ending the history of non-hot-rolled coil production in Anhui Province.

On February 28, 2004, the first cold-rolled coil was rolled off the production line of cold-rolled sheet, and the cold-rolled sheet project was put into production smoothly. On March 20, 2004, the first roll of galvanized sheet was successfully rolled off the production line of hot dip galvanizing.