Monthly work summary of engineering quality

Unconsciously, we know in hindsight that the hard work is over. Looking back on the work in this period, we must have made great achievements. Let's sum it up and write it down in the work summary. Then the question is coming, how to write a work summary? The following is the monthly work summary of 202 1 project quality for your reference and hope to help friends in need.

Monthly Work Summary of Project Quality 1 According to the spirit of the relevant documents in the notices of the Ministry of Construction (Jian Jian [20XX]2 17) and the Provincial Department of Construction (Min Jian [20XX]37 and Nan Jian [20XX]5 1 7), our bureau combines the special rectification and supervision of construction project quality and safety, and adapts measures to local conditions.

First, leaders attach importance to it and have clear responsibilities.

In order to highlight the key points and effectively carry out this activity, our bureau set up a leading group for the "Quality Month" activity, formulated a concise and clear implementation plan for the activity, and at the same time publicized and mobilized at the regular meeting on quality and safety, unified thinking and raised awareness to ensure that the "Quality Month" activity achieved the expected results.

Second, create an atmosphere and publicize it widely.

10 year10.8, at the regular meeting of quality and safety, organize all responsible parties to study the relevant documents of "Quality Month" activities seriously, and carefully understand its spirit and content, requiring all construction enterprises to formulate specific activity plans, and supervising enterprises to supervise their concrete implementation. * * * More than 200 basic publicity materials on engineering quality were distributed, more than 65,438 banners were hung and more than 0/00 posters were posted, mainly involving the slogan of "Quality Month" and knowledge of engineering quality and safety. , which has created a "quality month" atmosphere and received good publicity results.

Third, crack down on the storm.

This "Quality Month" activity is carried out in combination with the specific situation of our city and the supervision of the special rectification of the quality and safety of construction projects. First, actively carry out on-site special inspection of self-mixed concrete and prohibit the use of clay bricks; Second, publicize and implement the spirit of the documentNo. [20XX]4 1 of Nanping South Construction Management Co., Ltd. "Notice on Forwarding the Implementation Opinions of the Provincial Construction Department on Deepening the Special Renovation of Building Safety Production and Eliminating the Backward Equipment and Technology Restricting the Use of Bamboo Scaffolds, Trusses and Manual Digging Piles". On April/0/day of 20xx, the use of manual digging piles was strictly restricted. So far, this project has been basically completed. The pile length is also limited to 1 5m, 20XX April 101,and bamboo scaffolding and tic-tac-toe frames are prohibited. This work is the third in terms of "quality". According to the contents of special rectification and supervision of quality and safety, special inspections on construction quality and temporary power consumption were organized, and 20 notices of hidden dangers were issued. Now the basic rectification is in place, and the rectification rate is 96%.

Although the "Quality Month" activity has ended, we should take the "Quality Month" as an opportunity to carry out the activities of creating excellence in depth and work hard to promote the engineering quality of our city to a new level.

Summary of monthly work on project quality 2 In order to further implement various quality laws, regulations and technical standards, deepen the quality awareness of all staff, strive to improve the quality management level, and conscientiously implement the spirit of the notice of the relevant documents of the Shanghai Pudong New Area Construction and Transportation Committee on carrying out quality month activities, the No.7 plot project (D3-2) of Shanghai Security Housing Linsan Base, in combination with the actual situation of the project department, actively cooperated with the "Quality Month" activities according to local conditions, and strived to push the project quality level to a new level.

I. Contents of activities

1. During the "Quality Month", banners and slogans will be hung to strengthen quality management, quality control and publicize the importance of quality, so that the theme of "Quality Month" will be deeply rooted in people's hearts.

2. Organize all departments of the project department to conduct joint inspection on the site construction quality, put forward solutions to the quality problems and common faults existing in the site, and strengthen the rectification of these problems to ensure that the engineering quality defects are eliminated in the bud.

3, organize relevant technical personnel and construction personnel to discuss quality common fault control scheme and preventive measures at the construction site, do a good job of disclosure of quality common fault scheme and preventive measures, and control the existing quality hidden dangers in advance from the source;

4, strengthen the training of workers, including construction technology, technology and related new employees' technical quality training.

Second, the effectiveness of "Quality Month"

1, and the quality management system is more perfect.

Through the "Quality Month" activity for nearly a month, our project department further improved the quality management system, set up a quality management team headed by the project manager, and implemented the quality policy of total staff management. Further clarify the responsibility of quality management, refine the content of quality management, and increase the rewards and punishments of quality management!

2, the goal of quality management is more clear.

The theme of this "Quality Month" activity is "Abide by Quality Integrity and Build High-quality Projects", so the key of this activity lies in the implementation of "Quality Integrity". At present, the difficulty of construction site management is that the quality of on-site construction personnel is generally low, so ensuring that construction personnel "abide by quality integrity" is the key to ensure project quality. Through the development of this activity, our project department further clarified that the most important thing in engineering quality management is to strengthen the cultivation of quality integrity awareness of construction personnel.

3. The quality awareness of construction personnel has been significantly improved.

During the launch of this quality month, our project department actively responded to the call of the document "Notice on Launching the Quality Month of Pudong New Area Construction Project in 20xx", and for the purpose of improving the quality awareness of construction workers, seriously trained and educated the on-site construction workers, and strived to create a good atmosphere of "strengthening quality management awareness" at the construction site. The subjective initiative of quality management consciousness of construction personnel is improved.

Third, the prospect of future quality work

The "Quality Month" of 20xx is coming to an end, but doing a good job in quality is the eternal theme of the enterprise and a key point of the project quality of the project department. As the management work of the Project Department of Plot No.7 (D3-2) of Shanghai Security Housing Linsan Base, the quality work has a long way to go. Through the launch of this "Quality Month" activity, our project department has made some improvements in some aspects, but at the same time, it also exposed the shortcomings in quality and safety. I believe this activity is just the beginning, and all the staff in the project department

We will continue to strive for survival by quality and development by quality, and defend the image of No.7 plot project department of Shanghai affordable housing Linsan base and Heilongjiang Construction Engineering Group Co., Ltd. in their efforts to abide by quality integrity and ensure high-quality engineering construction!

Monthly work summary of engineering quality 3 Quality is the foundation of enterprise survival. What does the school live on? By training qualified students. With the expansion of enrollment and teachers in recent years, teaching quality has become an urgent problem for schools. With the attention of school leaders and department leaders, this quality month has achieved outstanding results.

First, active publicity and careful planning.

Department leaders regard teaching quality month as the core work in the near future, and convey the spirit of the school and the department about teaching quality month activities to each teacher in the department general meeting and teaching and research activities, so that everyone can have a deeper understanding of the significance of teaching quality month activities. A systematic work plan has been formulated, and specific arrangements have been made for each teaching and research section, requiring each teaching and research section to formulate relevant plans for quality month activities. Promote teaching quality month activities purposefully and step by step.

Second, the teaching and research section has taken a series of concrete measures to enrich the teaching quality month.

1, to further clarify the teaching requirements. Each teaching and research section organizes all teachers to study teaching management documents seriously, which further strengthens the quality consciousness. In addition to requiring all teachers to carry out teaching work in strict accordance with teachers' work norms, they must achieve "eight conscientiousness", and also require all teachers to strictly master classroom discipline, and require each teacher to adhere to the roll call system and deduct their usual grades for those who are absent without reason. The attendance rate of students can be linked to their final grades. Thus, the classroom discipline is serious, the classroom attendance rate is improved, and the classroom teaching order is guaranteed.

2, widely carry out mutual lectures and exchange of experience. Department leaders give lectures extensively in strict accordance with school regulations. All teaching and research sections are also required to carry out lectures and experience exchange activities. Please make a good record of the class. The teaching and research section organized special lectures and held teaching and research section meetings. At the meeting, teachers exchanged and summarized some common problems, and discussed teaching methods, teaching means and teaching effect, mainly discussing three aspects: first, how to improve students' interest in learning; Secondly, in view of the requirements of training engineering application-oriented talents in higher vocational colleges, teachers cultivate students' practical work ability by giving more practical engineering examples; Third, strengthen the interactive atmosphere in class and improve students' learning enthusiasm. Suggestions on how to improve teaching methods and teaching quality for young teachers are put forward.

3. Vigorously carry out thematic teaching and research activities. Through special teaching and research activities, a number of course contents suitable for revising the teaching plan were determined through discussion. The teaching and research activities on the theme of "How to write lesson plans" were carried out, which greatly improved the lesson preparation level of teachers and laid the foundation for improving teaching quality.

3. Link the teaching quality month with the construction of excellent courses. Actively participate in the construction of excellent courses of sensor and detection technology and machine tool electrical control. Through the construction of top-quality courses, we can promote professional construction and improve teachers' teaching level.

4. Link the teaching quality month with scientific research. Through the development of the project of "Teaching Reform of Talents Training Objectives and Talents Specifications for Mechatronics Specialty in Higher Vocational Colleges" by Sichuan Provincial Education Department, the training objectives of electromechanical talents in our school are defined, and on this basis, combined with the dual-certificate system, the teaching plan of Grade 06 is completed to meet the needs of self-taught undergraduate students.

Through this "Teaching Quality Month" activity, the teachers' teaching quality concept in our department has been obviously enhanced, the teaching level has been improved to some extent, and a lot of basic work has been done for curriculum construction and specialty construction, and the goal of "Teaching Quality Month" has been basically achieved.

Monthly work summary of engineering quality 4 In order to fully grasp the engineering quality of each project department of the company, correctly guide the construction personnel to standardize the construction, further improve the quality management of the construction process and improve the quality level of the projects undertaken by the company. According to the company's quality management plan, the company's quality department will inspect the quality of the projects under construction in the National Quality Month.

First, check the situation.

This time, the bureau inspected the 75-level east-west project of Honghuo Group 18 relocation and resettlement sites; 3# and 4# workshops and 6# scientific research office complex building project of Zhejiang Sanhe Bioengineering Co., Ltd.; Airport commercial construction project; River Village Shilipai Residential Community (115 #-118 #); South Farmers' Market Project in Hecun Town; Commercial and residential building project of Central Plains Royal Garden in Hecun; With an annual output of 7 million rolls of PVC-7 project, the wall coating production line project under construction, 4 main projects and 3 plastering projects have not been measured; After summary evaluation, there are 3 qualified projects, and the qualified rate of unit project number is 100%. Three rectification notices were issued, including rectification opinions 10.

1, master control project: the number of master control projects in the main project * * * was 6, and 6 were qualified, with the qualification rate of 100%.

2. General projects: the number of general projects in the main project is * * 18, qualified18, qualified rate is 100%, allowable deviation is * *120 measured point, and qualified point is1/kloc-.

3. Inspection of quality assurance data: basically meets the requirements.

Second, the good aspects and main problems of each project

1, Commercial and Residential Building Project of Zhongyuan Royal Garden in Hecun

Project manager: Zhou Shuilin's inspection location: Column 4 of Building 9-1 1#

There is a problem:

(1) local shear wall reinforcement deviation;

(2) Some walls and pipelines are not implemented according to 100, which is a common quality problem of residential buildings in Quzhou;

(3) There is no reinforced concrete lintel for some bricks with a hole greater than 300MM;

(4) The straight part of some masonry is not provided with Rachel reinforcement, and the diagonal masonry exists at the bottom of the frame beam at the same time, and the diagonal masonry angle does not meet the requirements;

⑤ Some columns are not disconnected at the concrete flanging.

2. South Farmers' Market Project in Hecun Town

Project Manager: Xia Jingliang Inspection Location: Fourth Floor

There is a problem:

① Some column joints are uneven;

(2) There is water seepage on the roof;

(3) Some Rachel bars do not meet the requirements.

3. Terminal project

Project Manager: Ming Tingjin Inspection Location: Second Floor

(1) The welding slag of some column rebar joints is not clean;

(2) Some cast-in-place slabs are trampled and do not meet the requirements.

Third, the next quality control measures

1. In view of the above problems, each project must seriously rectify the quality problems raised in the inspection and report the rectification receipt to the quality department of the company in time.

2. Intensify the inspection of the projects under construction, urge the projects to be constructed in strict accordance with the drawings and construction specifications, and ensure the project quality.

3. Each project department is required to seriously implement the relevant provisions of document No.3 of Jiang Jianjian (20xx) and document No.3 of Jiang Jianjian (20xx) 10, carry out the construction in strict accordance with the specifications and the relevant requirements of Quzhou and Jiangshan, resolutely curb all kinds of behaviors or quality accidents affecting the project quality, reduce common quality problems, eliminate quality hidden dangers, and establish a long-term management mechanism for the project quality.