Brief introduction of Guodian Changyuan Jingzhou Thermal Power Plant

Guodian Changyuan Jingmen Thermal Power Plant is located in the eastern industrial zone of Jingmen City. Founded in 1976, it belongs to China Guodian Corporation. It was built in three stages. Two 65438+ 100 MW units in Phase I were officially shut down in May 2008 and all of them were dismantled. Two 220,000 kW units in Phase II have been shut down for standby since the second half of 201/kloc-0, and the shutdown procedure has been started. In the third phase, two sets of 600,000 kilowatts are Guodian Changyuan Jingmen Power Generation Co., Ltd., which are jointly funded by China Guodian Corporation (3.85%), Guodian Changyuan Power Co., Ltd. (95.05%) and Jingmen Urban Construction Investment Company (1.1%) * * and are the main generator sets at present. The factory has 1645 employees and more than 800 retirees.