1. Before starting the burner, clean up the carbon deposit on the furnace bridge, clean up the carbon deposit on the bottom of the furnace, add granular fuel, close the material box cover and open the material isolation valve.
2, open the use of equipment power supply, check whether the circuit, water pipes are normal, check whether the cooling pool is full of water. Open the cooling water inlet and outlet valves of the internal combustion engine and confirm that the interlayer cooling water of the high-temperature combustion chamber has been filled.