Who has the quotation sheet for the installation fee of cooling tower?
100 refrigerated cooling tower: what is the material of the equipment? 1, steel structure; 2, steel frame glass fiber reinforced plastic shell; 3. Hyperbolic concrete structure; 4. Lower concrete and upper ventilation tower structure. The cost of various construction techniques is different. If it is finished equipment, the installation cost mainly includes the use cost of lifting machinery, which is about 3000-10000; The labor cost is less than 5000. Scheme 1 equipment name and specifications, unit price of energy consumption (ten thousand yuan), remarks, chiller q cold 123 1kW electric 242kW 2 190.00 joint venture carrier oil water heater q hot 1050kW electric 6. 15kW oil 92. H 2 38.00 "Southern Boiler" chilled water pump 250m3/h 32m electricity 30k H 34m electricity 18.5kW 2 4. 18 Winter machine room area 216m23.76 Equipment cost 2.567 million yuan, installation cost 5 1.34 Power capacity increase cost 340. Cold and hot water machine q cold 1 163kW Q hot 976.7kW electricity 8.3kW oil 88. 1kg/h 2 260.00 domestic "Liang Shuang" chilled water machine 250m3/h 38m electricity 37kW 2 4.56 cooling water pump 400m3/h 39m electricity 55kW 2 5.80 cooling tower medium temperature. Kloc-0/5kW 2 27 double-effect lithium bromide absorption refrigerator Q-cooled 1 162.8kW electricity 5.75kW steam1.51t/H 2180.00 Domestic "Liang Shuang" oil-fired boiler Q-heated/Kloc. H 2 55.00 "Southern Boiler" chilled water pump 250m3/h 38m electricity 37kW 2 4.56 cooling water pump 350m3/h 36m electricity 45kW 2 5.30 cooling tower medium temperature 350t/h electricity 1 kw 223.00 hot water pump 120m3/ H 34m electricity/kloc. 8.5kW 2 4. 18 Machine Room Project 4kW Q Heat 264kW Electricity 1 14kW Electricity 9 1.2 kW 8 440.00 Joint venture Carrier cold and hot water pump 65m3/ H 32m Electricity 1 1 .0kw8 6.24 The equipment cost of the computer room is 4.462 million yuan, the installation cost is 53.54 yuan, and the capacity increase cost is 55.00 yuan. In summer: 100 kW in winter: 729, the quotation should be combined with the actual situation, and our company often does it.