The project started construction on September 28th, 2002. In June 2003, the electrolytic aluminum production capacity reached 50,000 tons/year in 5438+065438+ 10. The continuous construction of 50,000 tons/year electrolytic aluminum and the supporting anode projects of 64,000 tons/year have been completed one after another. The company has 400 employees, including junior or above titles 138, including 23 senior technicians. After the production capacity of 654.38+ 10,000 tons is fully formed, the total number of employees will be controlled at around 800, and efforts will be made to maintain the national leading position in employee efficiency of aluminum plants of the same scale.
Relying on the coal-fired power aluminum project of Datun Coal-fired Power (Group) Company, Pei County has planned and built the Jiangsu aluminum processing industrial park, strengthened industrial investment, and made a major breakthrough, including 6.5438 million tons of high-precision aluminum strip from Datun Energy in Shanghai, 36,000 tons of high-precision aluminum foil from Fengyuan Aluminum in Jiangsu, 50,000 tons of aluminum profiles from Huachang Aluminum Factory in Guangdong, and an annual output of 654.38 from Huafeng in Jiangsu. The construction of this project has promoted the optimization and upgrading of Pei County's economic structure and industrial structure, and accelerated the pace.