Brief introduction of Huaibei Linhuan Industrial Park

According to the planning data of China Merchants Network Park, Linhuan Coal Chemical Industry Park in Huaibei, Anhui Province is located in the south of Suixi County, about 50 kilometers away from Huaibei City. On the main urban spatial development axis of the spatial layout structure of "one city, three towns and three axes" formed in this city, it is adjacent to Jingtai Expressway in the east, connected to Huozhou Expressway and Sixu Expressway under construction in the north, and there are 202, 203 and 305 provincial highways to the outside. Lu Qing coal mine railway special line passes through the south of the park, Fujia line and Qingfu line meet in the park, and are connected with Beijing-Shanghai line and Longhai line. There are Hui River and Guo River around, and the construction of water transport terminals such as Linhuan, han cun and Nanping has been started, which can go directly to Shanghai via Huaihe River and Hongze Lake.

The total investment of completed projects in the park is 7 billion yuan, of which the total investment of coking phase I project is 2 billion yuan. The design capacity of the first phase project is 2.2 million tons of coke and 200,000 tons of methanol. At present, the project has been completed and accepted, and four coke ovens have been in normal production. The total investment of the expansion project of Linhuan Coal Preparation Plant is 763 million yuan. The first and second production lines of the expansion project of Linhuan Coal Preparation Plant have reached the designed production capacity, and the third production line has been debugged, with the production capacity reaching12.5 million tons/year. The first phase of Linhuan Coal Slurry Coal Gangue Power Plant has a total investment of 3 billion yuan and a designed installed capacity of 4×300MW, which will be built in two phases. The first phase of the project has entered commercial operation, with an annual power generation of about 3 billion kWh. The water purification project of Linhuan Industrial Park has a total investment of 260 million yuan, which will be built in two phases to meet the industrial water demand of other projects such as coal coking and electrification. The first phase of the project has a processing capacity of 80,000 m3/d, which has been put into production and has water supply capacity. The second phase of the project has a processing capacity of 200,000 m3/d, which is synchronized with the second phase of the industrial park. The total investment of the pipeline water conveyance project is 780 million yuan, with a total length of 89 kilometers and a designed water conveyance capacity of 76.3 million cubic meters per year. The whole project has been completed and has water supply conditions; Xinyu Coal Gangue Brick Factory: The total design scale is 240 million pieces, which will be built in two phases, with the first phase construction scale of 65.438+0.2 billion pieces and the second phase construction scale of 65.438+0.2 billion pieces. The total investment of the project is 80.58 million yuan, including 7,465,438+800,000 yuan raised by the unit and 6.4 million yuan in the central budget.