The total investment of completed projects in the park is 7 billion yuan, of which the total investment of coking phase I project is 2 billion yuan. The design capacity of the first phase project is 2.2 million tons of coke and 200,000 tons of methanol. At present, the project has been completed and accepted, and four coke ovens have been in normal production. The total investment of the expansion project of Linhuan Coal Preparation Plant is 763 million yuan. The first and second production lines of the expansion project of Linhuan Coal Preparation Plant have reached the designed production capacity, and the third production line has been debugged, with the production capacity reaching12.5 million tons/year. The first phase of Linhuan Coal Slurry Coal Gangue Power Plant has a total investment of 3 billion yuan and a designed installed capacity of 4×300MW, which will be built in two phases. The first phase of the project has entered commercial operation, with an annual power generation of about 3 billion kWh. The water purification project of Linhuan Industrial Park has a total investment of 260 million yuan, which will be built in two phases to meet the industrial water demand of other projects such as coal coking and electrification. The first phase of the project has a processing capacity of 80,000 m3/d, which has been put into production and has water supply capacity. The second phase of the project has a processing capacity of 200,000 m3/d, which is synchronized with the second phase of the industrial park. The total investment of the pipeline water conveyance project is 780 million yuan, with a total length of 89 kilometers and a designed water conveyance capacity of 76.3 million cubic meters per year. The whole project has been completed and has water supply conditions; Xinyu Coal Gangue Brick Factory: The total design scale is 240 million pieces, which will be built in two phases, with the first phase construction scale of 65.438+0.2 billion pieces and the second phase construction scale of 65.438+0.2 billion pieces. The total investment of the project is 80.58 million yuan, including 7,465,438+800,000 yuan raised by the unit and 6.4 million yuan in the central budget.