Equipment status inspection summary report

# Report # Introduction When writing a summary report, we should pay attention to clear purpose, highlight key points, and never cover everything; Be inspiring and attractive. The following is the unorganized summary report of equipment condition inspection, welcome to read!

Article 1 Summary Report of Equipment Condition Inspection

With the development of the company, the situation of safe production of electrical equipment is becoming increasingly severe. In order to ensure the normal operation of electrical equipment during the peak summer and prevent all kinds of accidents, a special inspection activity of electrical equipment in summer was carried out in 20xx, focusing on the transformers, high and low voltage distribution rooms and switchgear in three production workshops and hydrogen production stations. Targeted special inspections were conducted on key areas and key equipment. The results of this inspection are summarized as follows: 1. Basic information:

1. There is no rain leakage in the power distribution room and power distribution room.

2. There are too many sundries in the distribution room.

3. The transformer room has cooling facilities and the temperature is appropriate.

4, transformer, high voltage motor and other major electrical equipment temperature rise meets the requirements.

Second, the individual problem:

1, atomization workshop 1000KVA distribution room door can't be opened.

2. The electric opening and closing action of the breaker of the main power cabinet of the crushing vibration mill in the second area of the iron powder workshop is not flexible.

3. The temperature of iron powder workshop 1# transformer dropped to 59℃, and the temperature of 2# transformer was 56℃, which was too high. There is too much dust in the cooling and ventilation network of the two distribution room doors, which pastes the network and affects the ventilation and heat dissipation.

4. The newly-built 10# and 1 1# reduction furnaces in the iron powder workshop are not paved with insulation pads.

Third, the problem rectification:

1. Cleaning and classification of sundries in transformer room and distribution room.

2. The door of atomization workshop 1000KVA distribution room can't be opened, and the spot check is not in place, so it is necessary to strengthen the spot check.

3. The electric opening and closing action of the breaker of the main power cabinet of the crushing vibration mill in the second area of the iron powder workshop is not flexible, so replace it with a new one.

4, iron powder workshop reduction 1# transformer, 2# transformer room door dust must be removed as soon as possible. You can consider doing a good job of safety protection and opening the door regularly, which is conducive to ventilation and heat dissipation.

5. The newly-built 10# and 1 1# reduction furnace power distribution rooms have not been laid with insulation pads, so they should be laid as soon as possible as required.

6. The reduction 1# transformer in the iron powder workshop is seriously aging and needs to be overhauled or replaced.

7. There are no spare parts for the 4000A main switch in each low-voltage distribution room, so some spare parts need to be prepared.

8. Restore the iron powder workshop 1# transformer to full load, and properly consider adjusting the load.

Chapter II Summary Report of Equipment Condition Inspection

In order to do a good job in the maintenance of communication network and information security during the peak period in Spring Festival travel rush and Spring Festival travel rush in 20xx, ensure smooth communication network, maintain communication production safety and ensure foolproof, the equipment maintenance center conducted a comprehensive inspection of the equipment in the pipeline from 20xx 065438+1October 5 to 065438+1October 20, and conducted a comprehensive investigation of the existing safety hazards. 1, organize the center staff to learn safety rules and regulations, improve their professional level, strengthen business study and drills, improve their sense of responsibility and strengthen labor discipline. Especially in key computer rooms, the data production of key businesses requires everyone to know, everyone to know and everyone to be accurate, and the assessment results are included in the salary assessment of the month, which greatly promotes the sense of responsibility of employees.

2. Conduct a comprehensive inspection of the key machine rooms and equipment in the pipeline. 15, 16, 1 6 requires the transmission, program control and power supply rooms to inspect the equipment under their jurisdiction, and 17 1 6 requires the on-site inspection of the key computer rooms of China National Petroleum Corporation. The main contents of the inspection include the following aspects:

Power supply system: In combination with filling in the application form for routing and load of power supply system of communication network, on-site check the AC incoming line load, equipment AC terminal, AC wire diameter (including AC wire for air conditioning) and various functions of moving ring system, and comprehensively check the running status of power supply equipment. Record and analyze key data to ensure that the use of alternating current is not overloaded, the terminal contact is good, the diameter of alternating current incoming line meets the power consumption standard, and the moving ring system functions well to ensure normal operation.

Transmission system: Focus on checking the transmission system of Tietong, the channel of ticket sales point and the video system of ticket sales point to ensure smooth channels and normal operation of railway-related networks. Test the transmission indicators of key systems, and rectify the unqualified indicators. The switching measures and schemes of key business circuits are reviewed to ensure the security and stability of communication during Spring Festival travel rush.

Switching system: check the routing data of key telephones, especially the railway booking telephone number 95 105 105 and the railway customer service telephone number 12306, to ensure correct routing and smooth communication; The traffic forecast in the pipeline was strengthened, and the traffic of the over-standard route was expanded in time. At present, what is being handled is that TD traffic exceeds the standard, and the expansion circuit is being coordinated for mobile; Check the data of key bureaus and rectify the connection rate according to the requirements of provincial companies.

Check spare parts. The spare parts of all departments were comprehensively inspected, and the account was checked and placed according to the model. At the same time, all branches are required to return the existing faulty parts to the center in time and send them for repair in time to ensure sufficient spare parts.

Strictly abide by the discipline of each department on duty, especially during the rush hour in Spring Festival travel rush, ensure that the personnel on duty in the computer room patrol and check the network management monitoring of key directions and key customers, and handle the network management alarm in time.

Everyone on duty should be familiar with the department's circuitous rewinding scheme and emergency safeguard measures to ensure that the emergency mechanism can be quickly started and dealt with decisively when problems arise.

Chapter III Summary Report of Equipment Condition Inspection

According to the arrangement of the market management department of the group company, from August 2 to 6, the 9-member inspection team of the upstream East conducted equipment inspection in the North China Bureau. This inspection is the first time since the reorganization of the group company. The leaders of the group company and the market management department attached great importance to it and put forward specific requirements. The inspection team came to the North China Bureau for the first time and made an inspection attempt. Due to the short time and heavy task, coupled with our limited level, there are inevitably omissions and imperfections in the summary. Please forgive the leading comrades of the North China Bureau. First, the specific practice of equipment inspection.

On the one hand, equipment inspection is aimed at the whole life cycle management of equipment purchase, basic work, site management, maintenance, oil and water management, maintenance, scrapping and equipment, on the other hand, it is aimed at the management of all staff. According to the characteristics of oilfield enterprises, we have adopted the inspection method of "listening, checking, asking and dismantling". During several days of inspection, we listened to the equipment management reports of North China Bureau, the third and fourth drilling engineering companies, downhole operation companies, fracturing teams and drilling teams 50645, 40545, 40543 and 4054 1. Check the management system, equipment files, maintenance records, self-examination and self-correction of these units, and inspect the equipment management of four drilling teams, fracturing brigades and other units on the spot; The management knowledge such as "four understandings and three skills", "oil-water management" and "crossover operation" were inquired from the equipment managers and operators, and the equipment inspection process was demonstrated on the spot. Some sets of equipment such as diesel engine and mud pump 10 were disassembled and inspected, and the manufacturing of solid control system in mechanization company was also inspected. During the inspection of the drilling crew, we divided into five groups, made spot checks on the basic management and drilling equipment on site, and made comments on the site, affirmed the achievements made in the work, pointed out the existing problems and put forward the rectification requirements.

Second, the characteristics of equipment management in North China Bureau.

Through the equipment inspection in just a few days, we think that the leaders of North China Bureau attach great importance to equipment management, the management system is sound, the investment in equipment renovation is increased, and the equipment management work is solid and effective; The equipment management of grass-roots teams has attracted great attention from all employees. I heard and witnessed the work done by North China Bureau in equipment management, and deeply felt the achievements made by North China Bureau in equipment management.

1, pay attention to equipment inspection.

After receiving the notice on carrying out equipment management inspection from the group company, North China Bureau set up a leading group for equipment inspection, forwarded the inspection documents from the group company in time and made specific arrangements. The secondary units conducted self-examination and self-correction, and the Administration established seven professional inspection teams to comprehensively inspect the equipment management of 44 secondary units around the world, summed up the experience, found the problems, defined the future direction of equipment management, and laid the foundation for the inspection work of the group company. In view of the problems found by the inspection team of the group company during the inspection of the grass-roots team, Drilling Company No.3, Drilling Company No.4 and downhole operation company attached great importance to it, held special meetings, put forward rectification opinions and plans for the problems quickly, and put them in place. On August 5, they received feedback from the inspected units. The overall impression of the inspection team is that North China Petroleum Administration attaches great importance to equipment management inspection, with a correct attitude and firm rectification.

2, equipment management system and system.

The three-level network of mass equipment management is sound. The Administration has set up an equipment management committee with the deputy director in charge as the director, and all secondary units have also set up equipment management committees of factories and departments, and all grass-roots teams have set up equipment management groups. Hold regular equipment management meetings to study equipment management related matters and keep original records.

Professional equipment management institutions are sound. The Administration resumed the equipment management function department that was cancelled in the process of reorganization and restructuring, and re-established the equipment management office. All sophomores have full-time equipment management departments, third-level units have mobile teams, and grass-roots teams have full-time equipment management personnel. The Administration adheres to the inspection system of semi-annual inspection of equipment, quarterly inspection of secondary units, monthly inspection of tertiary units, weekly inspection of teams and groups and daily inspection of posts.

The whole chapter has achieved remarkable results. As soon as the equipment management office was established, it started with the establishment of rules and regulations and paid close attention to basic work. In just a few months, the equipment operation and maintenance specification and management system of 18 volumes and150,000 words have been compiled, which laid a solid foundation for standardizing basic equipment management, guiding operators to correctly maintain and operate equipment, prolonging the service life of equipment, reducing equipment maintenance costs, promoting the improvement of staff quality and equipment management level, and laying a solid foundation for all staff to carry out equipment management. Did what the oilfield wanted to do but didn't do.

3. Equipment purchase and update.

After the reorganization and restructuring, the decision-making level of the General Administration fully realized that equipment is the market access card for engineering and technical service units and the basis for survival and development. In recent years, we have increased the investment in equipment renovation, with an investment of 654.38+82 million yuan. On the basis of fully considering the advanced nature, reliability, economy and maintainability of the equipment, and on the premise of meeting the needs of the continuous development of technology, we purchased the equipment that conforms to the actual situation of the enterprise, enhanced the equipment strength and technical grade of the construction unit, improved the competitiveness of participating in the market, and improved the novelty coefficient of the equipment from 0.3 to 0.57.

In the process of consulting data, the preliminary investigation, feasibility study report, technical agreement signing, manufacturing supervision and acceptance of key imported equipment such as HQ-20xx fracturing truck, XJ750 workover rig, ZJ50DBF and TDS- 1 1SA were randomly selected. Generally speaking, all kinds of information are complete, which meets the requirements of the group company for the procurement of major key equipment.

4. Equipment management.

In the field management of equipment, most units can pay close attention to the implementation of various management systems with "crossover operation" as the main content, attach importance to the use and maintenance of equipment, ensure the safe operation of equipment, and carry out effective equipment management activities.

First, the annual review of equipment was carried out. The annual review scope made specific provisions from the aspects of equipment host configuration, equipment performance and integrity, oil and water management, "cross-over" operation, peripheral facilities, living facilities, staffing and materials, and made quantitative assessment. This is a kind of management innovation. Through this activity, the equipment field management level of each unit has been greatly improved.

The second is to strengthen the oil-water management of equipment and continuously improve the oil-water management level. The fracturing brigade of downhole operation company links the oil-water management of equipment with prolonging the service life of equipment, reducing oil consumption and reducing maintenance costs, strictly implements the "five-fixed" system of lubricating oil, and implements the method of regular monitoring and changing oil according to quality. The oil change rate of all kinds of equipment and products according to quality is over 90%. Optimize the equipment coolant through practice, and eliminate the use of unqualified coolant from the source.

Third, strictly implement the post responsibility system, pay close attention to the "three basics" work and strictly implement the daily maintenance system. According to the maintenance requirements of the equipment, the site inspection and three-level maintenance are adhered to, and each maintenance time is executed according to the regulations, with the signature of the maintenance personnel, thus ensuring the normal operation of the equipment.

Fourthly, the downhole fracturing brigade decomposes the equipment management indicators into teams and bicycles, and implements them in their posts, which is everyone's responsibility, forming a good situation in which the platform equipment is managed by someone and everyone participates in equipment management.

5. The construction of equipment management informatization has achieved initial results.

The network system from the bureau to the second-level units and some third-level units has been established, and the equipment management software has been developed, and some information statistics and business management functions have been initially realized, especially the technical files of large-scale equipment have been initially digitized. Improve the authenticity and accuracy of information and improve the efficiency of information management.

Three. Problems and suggestions

How to put the equipment management system in place after it is formulated is the focus and difficulty of equipment work. Equipment management should pay attention to details and effects, extending to the depth of equipment management. Through inspection, it is found that the equipment management level of grass-roots teams is not balanced enough, and there are still some problems that need to be improved.

1 and 4054 1 The installed power of ZJ40L drilling rig of drilling team is too small, and the matching is unreasonable. Two 8V 190 diesel engines are equipped with drill bit, winch and 1 mud pump. During normal drilling, single pump group has long drilling time and high oil consumption, which is difficult to meet the technical requirements. It is recommended that the Administration consider this change.

2.50645 One advantage of the compound drive drilling rig used by the drilling team is that it has the functions of automatic drilling, stepless speed change of rotary table and torque display, which have a direct effect on improving ROP, prolonging the service life of the drill bit and ensuring downhole safety. But this drilling rig has finished drilling a well and has not been used yet. It is suggested to strengthen personnel training, improve the quality of the team and accelerate the digestion and absorption of new equipment and technology. Let advanced equipment work as soon as possible.

3. Distinguish the responsibilities of equipment management. The management department should make clear what the operator should do and how to do it in equipment management. Prepare equipment lubrication road map and lubrication cycle table as soon as possible and distribute them to grass-roots teams. Improve the operator's awareness of equipment management, and change from "I want to manage" to "I want to manage".

4. Improve the service quality of logistics units to ensure the safety of drilling construction. During the inspection, we found that some high-pressure gate valves of the drilling crew's high-pressure manifold and blowout preventer group were missing and could not be maintained, and some electrical lines in the drilling crew's well site were installed irregularly, which had potential safety hazards.

5. Further strengthen basic management at the grass-roots level. Strengthen the daily maintenance of equipment, improve the equipment operation records and maintenance records of the drilling team, ensure their authenticity, and further strengthen the oil and water management of the drilling team. Some drilling teams' mud pumps have no oil level marks, which can not accurately indicate the oil level, affecting the normal lubrication of equipment and reducing the service life of equipment.

6. Further improve the equipment management information system and comprehensively improve the equipment management level. Increase investment in equipment management informatization and improve the three-level information network. It is necessary to strengthen the input of basic equipment management information and take the use of information systems as the basic work of equipment management.

Due to the limited time, we only inspected several units and found some problems, but not all of them. To really do a good job in equipment management, we need Qi Xin to work together to find problems, leave no dead ends, and implement equipment management. This visit to the North China Bureau is also a learning process. We should take the good experience and practice of equipment management of North China Bureau to their respective oilfields to learn and popularize.