Brief introduction of Pingliang Huaneng power plant
I. Company Profile 1. Location Huaneng Pingliang Power Plant is a large-scale pithead thermal power plant, located in Shilipu, Pingliang City, at the junction of Shaanxi, Gansu and Ningxia. Pingliang City is located in the east of Gansu Province, at the intersection of Shaanxi, Gansu and Ningxia provinces (regions), across Longshan (Guanshan), adjacent to Xianyang in Shaanxi in the east, Dingxi and Baiyin in Gansu in the west, Baoji and Tianshui in Shaanxi in the south, and Guyuan in Ningxia and Qingyang in Gansu in the north. It is an important town that the ancient "Silk Road" must pass through and is known as the "dry dock" on Gansu. 2. Traffic conditions: Railway: transit after the opening of Bao-Ji-Zhong-Wei Railway, passing by highway: Pingliang traffic is mainly by highway, national highway 3 12 passes through the area 199 km, and provincial highway 438 km; Two. Enterprise development 1, enterprise history1996. In September, Huaneng Pingliang Power Plant was established by China Northwest Electric Power Group Company, Gansu Electric Power Construction Investment and Development Company and Gansu Electric Power Company according to the investment ratio of 55%, 35% and 10%. 65438+1 June 1998, the first phase project1Unit 2 was approved to start construction. On September 6, 2000 and June 30, 2006, 5438+0 was put into operation one after another. Units 200 1 3 and 4 started in May. It was completed and put into operation on June 5, 2003, and on October 30, 2003 165438. The construction scale is 6.5438+0.2 million kilowatts, and the approved total investment is 56.5438+0.8 billion, and four domestic and imported 300MW coal-fired generator sets are installed. In 2005 1 month, China Huaneng Group Corporation and Huaneng International Power Co., Ltd. transferred their shares, and Huaneng International Power Co., Ltd. exercised the corresponding shareholder rights. 2. The enterprise plans that the construction scale of Huaneng Pingliang Power Plant is 6.5438+200,000 kilowatts. Four 300,000 kW imported domestic coal-fired units will be built in the first phase of the project. The second phase project of Pingliang Power Plant is to build two 600,000 kw coal-fired air-cooled desulfurization units on the basis of four 300,000 kw units in the first phase. The site of the second phase project is close to Huating coalfield, with sufficient fuel supply and convenient transportation. The reserved site of the first phase project is fully utilized, and two 600,000-kilowatt units are built. The public facilities and public systems of the first phase project can be used at the same time, which occupies a small area and greatly saves the project investment. In terms of environmental protection, the project adopts advanced air cooling desulfurization technology, which conforms to the national industrial policy. The project will build two 600,000 kW coal-fired air-cooled generating units. The total investment of the project is 410.80 billion yuan. Three. Enterprise Status Huaneng Pingliang Power Plant covers an area of 64 hectares and is a large-scale pithead thermal power plant. The first phase of the project is to build four 300,000 kilowatts imported domestic coal-fired units, which is the only cross-century national key power supply construction project in Gansu, with a total investment of 5 1.8 billion yuan. 1998 started construction and was completed and put into operation in 2003. By the end of September this year, the cumulative power generation has reached 26 billion kWh, which has made great contributions to Gansu's economic construction. The total investment of the second phase project will reach 410.80 billion yuan, which is an economic and environmental protection project with less land occupation and investment, and simultaneous construction of urban reclaimed water and desulfurization. After the completion of the second phase of the power plant project, it will become one of the main power sources in Gansu and even the northwest power grid, which will not only meet the needs of load development in Gansu Province, but also supplement the power shortage in dry season for Gansu and Qinghai provinces, and will also play an important role in realizing the optimal allocation of resources and meeting the regional economic development. 1, power generation a, installed capacity In 2005, the installed capacity of Huaneng Pingliang Power Plant was 1.2 million kilowatts. B. Coal consumption for power supply In 2005, the coal consumption for power supply of Huaneng Pingliang Power Plant was 330. 12g/kWh. 2. Four imported domestic 300,000 kW coal-fired units for the first phase of power generation equipment. Two 600,000 kW coal-fired air-cooled desulfurization units in the second phase. 3. Power generation In 2005, Huaneng Pingliang Power Plant generated 8.073 billion kWh of power. In 2006, Huaneng Pingliang Power Plant generated 7.934 billion kWh of electricity. In 2007, the power generation of Huaneng Pingliang Power Plant was 8 1. 1 100 million kWh.