Company Development of Guangdong Huizhou Natural Gas Power Generation Co., Ltd.

Huizhou LNG Power Plant has a planned installed capacity of 3.04 million kilowatts and a total investment of over 654.38+0.8 billion yuan, which is one of the largest LNG power generation projects in China. The project is constructed in two phases, with three 390,000 kW gas-steam combined cycle units in each phase, and the final scale is six 390,000 kW gas-steam combined cycle units. In order to cooperate with the development of Daya Bay Economic Development Zone, it is planned to build 410.75 million kilowatt gas-steam cycle cogeneration units in the same period. The first phase project 1 unit was put into commercial operation on September 26th, 2006. It is the first 9F-class gas turbine put into operation in Guangdong Province, and all three units were put into operation on June 18, 2007.

Huidian is a new power plant with environmental protection, energy saving and peak regulation. The fuel is liquefied natural gas (LNG), which is the cleanest energy source in the world at present. It does not contain sulfide and emits little nitrogen oxides. The main equipment is imported from the international advanced 9F gas-steam combined cycle unit, with a thermal efficiency of about 57%, rapid start-stop and good peak shaving performance. Industrial wastewater and domestic wastewater are reasonably recycled to achieve zero emissions, and the national environmental protection and sustainable development policies of energy-saving and low-carbon economy have been well implemented. The completion and commissioning of Huizhou LNG Power Plant has effectively alleviated the contradiction between power supply and demand in Guangdong, and played a positive role in optimizing the energy structure of Guangdong Province, improving the ecological environment in the Pearl River Delta region, and promoting the leap-forward scientific development of Huizhou and even Guangdong.

Huizhou LNG Power Plant is the first power enterprise in China to pass the three-standard management system certification during the construction period, and it is also the first power enterprise in the world to obtain a four-star rating of NOSA integrated management system during the construction period. The first phase of the project won the Silver Award of National Quality Project, becoming the first power supply project of Guangdong Electric Power Group to be rated as a national quality project, and won the five-star rating of Guangdong Electric Power Group's project management. Implement refined management after production, constantly consolidate the foundation of safety management, and strive to improve the efficiency and value of enterprises. We have been awarded five-star NOSA safety, health and environment comprehensive management system year after year. In 2008, we were awarded AAA grade of advanced power generation enterprise of Guangdong Electric Power Group and AAA grade credit enterprise of national electric power enterprise in 2009.

Address: Petrochemical Industrial Park, Daya Bay Economic and Technological Development Zone, Huizhou, Guangdong Province