I. Safety management
1, before the start of each project, the project department must sign the responsibility book for safe production target management with the company, and the project department should sign the responsibility book for safe production with various professional construction teams, and send a copy to the quality and safety department of the company. If the project department fails to sign a safety contract with the company and the construction team, the project department will punish 300 yuan and go through the signing formalities.
2. Before each project starts, the technical measures for labor safety in construction projects shall be declared. The project manager shall, according to the characteristics of this project, urge the construction unit to submit special safety technical designs such as foundation pit support, external scaffolding, material hoist, formwork project, three treasures, temporary construction electricity, border protection and civilized construction. 300 yuan, the project manager, will be fined for each project that fails to handle the declaration form and prepare various special safety technical measures.
3. After each project starts, the project manager or the builder shall make a written safety technical disclosure to the construction team of each subentry project according to the special design (or scheme) of each safety technical operation regulation, and handle the signing formalities in time. If the sub-project fails to make written safety technical disclosure or sign on behalf of it, 500 yuan, the project manager or builder, will be punished for each missing item, and the safety technical disclosure will still be made after the fine.
4, the project manager shall, jointly with Anke personnel, strengthen the safety education for workers, and all workers must be given three-level safety education. For example, the project manager has been urging the on-site safety supervisor and the production team leader to carry out irregular pre-shift activities and three-level safety education. For each missing item, the project manager and the safety supervisor will be fined 1 1,000 yuan, and relevant contents will be supplemented.
5, the project manager is the first person responsible for production safety, for all construction projects must be required to hang safety signs, safety signs hanging must conform to the standards, accurate location, for not using standard safety signs, the project department fined 300 yuan; If the suspension is incomplete, 50 yuan will be punished for each missing item and ordered to complete the suspension.