June 5438+October 2007 10, TBEA Shenbian Company started the construction of the power transmission and transformation industrial park with the largest one-time investment, the largest production capacity and the highest voltage level in the world in Shenyang Economic and Technological Development Zone. The design area of transformer core workshop in the first phase is 6.5438+0.5 million square meters, and the annual production capacity will be increased to 80-6.5438+0.000 million kva. The construction project of the world's largest power transmission and transformation industrial park focuses on the development of ultra-high voltage, ultra-high voltage AC and DC large-capacity transformers, and takes the development of high-tech products such as high-voltage transformers, bushings, high-voltage switches and international complete projects as the manufacturing base. It is of great significance to build a world-class transformer manufacturing center with core competitiveness and a domestic core component manufacturing export base to enhance China's major equipment manufacturing capacity.
On September 1 2009, the new park of TBEA Shenbian Company-TBEA Northeast Power Transmission and Transformation Science and Technology Industrial Park was completed and put into operation, and a grand ceremony was held, which marked that the new park was officially put into use. TBEA Northeast Power Transmission and Transformation Science and Technology Industrial Park is a world-class UHV AC and DC power transmission and transformation science and technology industrial park, with the world's highest voltage level, the most perfect quality assurance system, world-class test equipment, world-class production equipment and world-class production environment.
TBEA Shenbian Company currently has a registered capital of 654.38+0.08 billion yuan. The company is located in Tiexi New District, Shenyang, covering an area of 7.2 million square meters. Excellent geographical location and convenient traffic conditions. It is 270 kilometers away from Huludao Port, the nearest seaport. All kinds of products can be transported by road, rail or water. At present, the road transport weight of single products has exceeded 400 tons, and the railway can reach 360 tons, which is fully capable of serving major national projects. There are 265 employees 1 person, including doctor1person, master's 7 1 person, undergraduate 4 15 person, senior technician 32 1 person, skilled worker 1472 person, technician 36 person and quality assurance personnel.