Working principle of Gezhouba No.3 shiplock

Use the connector to keep the water level.

Open the ship lock, and when the gravity acceleration is not equal to 0 and its value is equal to the values of all parts in the communication device, inject the liquid with the same uniform density into the communication device. When the liquid is stationary relative to the communication equipment, the liquid level in each container of the communication equipment remains horizontal, the gate is completely opened, and the ship enters or leaves.

Gezhouba lock refers to the gate for ships to pass through the navigation project of Gezhouba Hub. Gezhouba project is the first large-scale water conservancy project built on the main stream of the Yangtze River in China, and is known as the "first dam of the Yangtze River".