Brief introduction of Lu 'an Xiqiao Silicon Industry Co., Ltd.

Shanxi Lu 'an Xiqiao Silicon Industry Co., Ltd. belongs to Shanxi Lu 'an Mining (Group) Co., Ltd. and is a wholly-owned subsidiary of Lu 'an Group. The company was established on June 22, 2009. The 2× 33,000 industrial silicon project under construction was approved by the State-owned Assets Supervision and Administration Commission of Shanxi Province with the document of Jin Planning Letter [2009] No.3 and filed with the document of Jin Fa Gai Filing [2009] No.25. It is a complete industrial chain built by Lu 'an Group, from industrial silicon smelting and high-purity polysilicon refining to photovoltaic cell production, component and system power generation and PVC.

Shanxi Luan Xiqiao Silicon Industry Co., Ltd. is located in Xiqiao Industrial Park, Licheng County, Changzhi City, Shanxi Province, covering an area of 95.77 mu. Industrial silicon and industrial silicon product series are mainly developed and produced, belonging to metallurgical industry. The project has a total investment of 400 million yuan, a 2× 33,000 KVA industrial silicon furnace production line, a grinding device with an annual output of 20,000 tons of industrial silicon powder, and an annual output of 30,000 tons of industrial silicon. Implementation of the second phase project of 20 12 to 2013,2× 2×33000 KVA industrial silicon furnace production line. By 20 15, the production capacity of industrial silicon will reach 60,000 tons/year, and the industrial silicon powder will reach 50,000 tons, achieving a sales income of 800 million yuan and a profit of 80 million yuan.

On March 20 10, the first phase of the project officially started construction in an all-round way. With the strong support and help of Lu 'an Group, local government and relevant departments, the smooth progress of the project construction was ensured. By March of 20 1 1 year, all the civil works of the first phase of the project were completed, the main furnace and other auxiliary equipment were manufactured and installed, and the debugging and overall linkage test were completed for 4 hours, which was normal and qualified for trial production. On March 23rd 1 1, 1 furnace started to dry formally, and trial production was carried out at the end of March.