Guangdong yuejia electric power co., ltd.

Yuejia Company started construction on August 29th, 1993, with 6 original units with a total installed capacity of 620,000 kilowatts. Among them, two condensing coal-fired steam turbine-generator sets11040,000 yuan were completed and put into operation on March 6 and February 24, 1997, respectively, and two circulating fluidized bed units1050,000 yuan1350,000 kw were put into operation respectively. The shareholding structure of Yuejia Company is 58% of Guangdong Electric Power Development Co., Ltd., 25% of Guangdong Electric Power Investment Co., Ltd., 0/0% of Meizhou Jiacheng Electric Power Co., Ltd. and 7% of Meizhou Electric Power Development Company.

In response to the national policy of energy conservation and emission reduction, Yuejia Company shut down two 50MW units and two 125MW units in 2009 and 20 10 respectively. At present, the installed capacity is 270MW, and Jiacheng Company no longer holds shares.

Yuejia company consists of eight departments: production and operation department, operation department, maintenance department, finance department, human resources department, comprehensive department, party Committee work department and trade union. In September, 2007, according to the needs of large-scale expansion project, the company set up the preparatory group of Tai Po Power Plant. Since its establishment, Yuejia Company has won many honors: Guangdong Province, national-level safe and civilized production enterprise, Guangdong Province, national-level dual-civilized unit, excellent enterprise in ideological and political work in Guangdong Province, civilized unit in Guangdong Province and Meizhou City, first-class thermal power plant in 2003 and home of model workers in 2005. In 2006, it was awarded the title of Guangdong Advanced Collective, in 2007, it was awarded the title of AAA Advanced Power Generation Enterprise by Guangdong Electric Power Group Corporation, in 2007, it was awarded the title of 2006 National Customer Satisfaction Enterprise in Power Industry by China Water Conservancy and Electric Power Quality Management Association, and in 20 10, it was awarded the title of "National Excellent Power Industry Enterprise". The company pays attention to social returns and has repeatedly visited Meizhou counties to carry out double support work.

The work of the preparatory group for Tai Po is progressing smoothly. It is estimated that two 600MW units can be put into operation smoothly in 20 15.