Safety technical disclosure of steel pipe scaffold erection in building construction?

What are the characteristics of safety technical disclosure of steel pipe scaffold erection in building construction? Please see the introduction below.

(1) Work in strict accordance with the requirements of the construction plan.

(2) Scaffolding personnel must hold relevant certificates and have regular physical examination. Only after passing the physical examination can you participate in the erection work.

(3) The erection personnel must wear safety helmet, safety belt and non-slip shoes.

(4) Before erection, the quality of scaffold components shall be inspected and accepted.

(5) Scaffolding shall conform to Technical Specification for Safety of Steel Pipe Scaffolding in Building Construction Structure (JGJ130; 200 1) Section 7.3.

(6) In case of gale, fog, rain and snow with magnitude 6 or above, scaffold operation should be stopped, and anti-skid measures should be taken for scaffold operation after rain and snow, and snow should be removed.

(7) When scaffolding is set up along the street, the outside should have protective measures to prevent falling objects from hurting people.

(8) The erection of temporary power lines on the construction site and the grounding and lightning protection measures of scaffolding shall comply with the relevant provisions of Technical Specification for Temporary Power Safety on the Construction Site (JGJ4688).

(9) When scaffolding is erected, fences and warning signs should be set on the ground, and special personnel should be assigned to guard it. Non-operators are strictly prohibited from entering.