Super qualification standard:
First, the enterprise credit ability.
1, the registered capital of the enterprise is more than 300 million yuan.
2. The net assets of the enterprise are more than 360 million yuan.
3. The business tax paid by construction enterprises in recent three years is more than 50 million yuan.
4. The credit line of corporate banks has been more than 500 million yuan in recent three years.
Second, the enterprise main management personnel and professional and technical personnel requirements
1, the enterprise manager has more than 10 years of project management experience.
2. The technical director has more than 15 years working experience in engineering technology management, and has the senior title of engineering sequence and the qualification of first-class registered constructor or registered engineer; He has presided over the technical work of more than two representative projects with the first-class qualification requirements for general construction contracting or the first-class design qualification requirements or general contracting projects with a contract amount of more than 200 million yuan.
3. The person in charge of finance has the title of senior accountant and the qualification of certified public accountant.
4. The enterprise has more than 50 registered first-class construction engineers (first-class project managers).
5 enterprises have professional and technical personnel who meet the requirements of Class A qualification standards for industrial engineering design related to this category.
Third, the level of scientific and technological progress.
1. Enterprises have enterprise technology centers at or above the provincial level.
2. In the past three years, the funds for scientific and technological activities of enterprises have reached more than 0.5% of the turnover on average.
3, the enterprise has more than three national construction methods; In the past five years, it has owned more than 3 patents related to engineering construction, which can promote the technological progress of enterprises, and has more than 8 effective patents, including at least one invention patent.
4. The enterprise has won the National Science and Technology Progress Award or edited the national or industrial standards for engineering construction in recent ten years.
5. The enterprise has established an internal LAN or management information platform, and realized the networking of internal office, information release and data exchange; The external website of the enterprise has been established and opened; Archives management and design document management are realized by using comprehensive project management information system, personnel management system and engineering design related software.
Fourth, on behalf of the project performance
Within 10 years, it has undertaken general contracting, construction general contracting or main project contracting for more than three of the following six projects, of which at least 1 is the project in 1 2, and the project quality is qualified.
1 dam with storage capacity exceeding 1 100 million cubic meters or dam height exceeding 80 meters, or 2 dams with storage capacity exceeding 1 100 million cubic meters or dam height exceeding 60 meters;
2. There are 1 seat with flood discharge > 3,000m3/s, or there are 2 seats with flood discharge > 1 1,000m3/m;
3. One hydropower station with a total installed capacity of over 300MW 1 seat, or two hydropower stations with a total installed capacity of over1300mw;
4. Irrigation and drainage pumping stations 1 seat, with a total installed capacity of more than 10 MW, or 2 irrigation and drainage pumping stations with a total installed capacity of more than 5MW;
5. One hydraulic tunnel/kloc-0 with a diameter of > 8m and a length of > 3,000m, or two hydraulic tunnels with a diameter of > 6m and a length of > 2,000m;
6. More than 500,000 cubic meters of hydraulic concrete pouring, more than 6.5438+200,000 cubic meters of earth and stone filling of dam body, more than 6.5438+200,000 meters of rock foundation grouting or more than 80,000 square meters of cutoff wall will be completed annually.
Level 1 qualification standard:
1, enterprise assets
The net assets are more than 654.38 billion yuan.
2. Key personnel of the enterprise
(1) There shall be no less than 15 first-class registered builders for water conservancy and hydropower projects.
(2) The technical director has more than 10 years working experience in technical management of engineering construction, and has senior professional titles related to water conservancy and hydropower engineering; There shall be no less than 60 persons with intermediate or above titles in water conservancy and hydropower engineering related majors.
(3) There shall be no less than 50 construction site management personnel with certificates, and the builder, quality engineer, safety officer, material engineer and documenter shall be complete.
(4) There shall be no less than 70 skilled workers at or above the intermediate level who have passed the examination or training.
3, enterprise engineering performance
In the past 10 years, it has undertaken general contracting or main project contracting of three of the following seven categories, of which 1 ~ 2 is at least 1 and 3 ~ 5 is at least 1, and the project quality is qualified.
(1) 2 dams of reservoirs and hydropower stations with a storage capacity of more than 50 million cubic meters and a dam height of more than15m or a storage capacity of more than100000 cubic meters and a dam height of more than 50m;
(2) 4 sluices (excluding rubber dams, etc.). ) flood discharge ≥ 500m3/s;
(3) 2 hydropower stations with total installed capacity100 MW;
(4) 2 pumping stations with a total installed capacity of 5MW (or flow rate ≥25 m3/s);
(5) 4 hydraulic tunnels with diameter ≥ 6m (or other types with equal cross-sectional area) and length ≥ 500m;
(6) More than 500,000 cubic meters of hydraulic concrete pouring, more than 6.5438+200,000 cubic meters of earth and stone filling of dam body, more than 6.5438+200,000 meters of grouting or more than 80,000 square meters of cutoff wall have been completed annually;
(7) Water conservancy and hydropower projects with a single contract value of 1 100 million yuan or more.
Secondary qualification standard:
1, enterprise assets
The net assets are more than 40 million yuan.
2. Key personnel of the enterprise
(1) There shall be no less than 15 registered construction engineers in water conservancy and hydropower engineering, including no less than 6 first-class registered construction engineers.
(2) the technical person in charge has more than 8 years of experience in technical management of engineering construction, and has the senior title of water conservancy and hydropower engineering or the qualification of first-class registered constructor of water conservancy and hydropower engineering; There are not less than 30 people with intermediate or above titles in water conservancy and hydropower engineering related majors.
(3) There shall be no less than 30 construction site management personnel with certificates, and the builder, quality engineer, safety officer and materials engineer shall be complete.
(4) There shall be no less than 40 skilled workers at or above the intermediate level who have passed the examination or training.
3, enterprise engineering performance
In the past 10 years, it has undertaken general contracting or main project contracting of three of the following seven categories, of which 1 ~ 2 is at least 1 and 3 ~ 5 is at least 1, and the project quality is qualified.
(1) 2 reservoirs and hydropower dams with a storage capacity of more than 5 million cubic meters and a dam height of more than15m or a storage capacity of more than100000 cubic meters and a dam height of more than 30m;
(2) 4 sluices (excluding rubber dams, etc.). ) flow of 60m3/s;
(3) Two hydropower stations with total installed capacity10mw;
(4) 2 pumping stations with a total installed capacity of 500KW (or flow rate ≥8 m3/s);
(5) Three hydraulic tunnels with a diameter of ≥ 4m (or other types with equal cross-sectional area) and a length of ≥ 200m;
(6) The annual completion of hydraulic concrete pouring is more than 200,000 cubic meters or dam earthwork filling is more than 600,000 cubic meters or grouting is more than 60,000 meters or cutoff wall is more than 40,000 square meters;
(7) Water conservancy and hydropower projects with a single contract amount of more than 50 million yuan.
Level 3 qualification standard:
1, enterprise assets
The net assets are more than 8 million yuan.
2. Key personnel of the enterprise
(1) There shall be no less than 8 registered construction engineers specializing in water conservancy and hydropower engineering.
(2) The technical person in charge has more than 5 years working experience in technical management of engineering construction, and has the intermediate title of water conservancy and hydropower engineering or the qualification of registered construction engineer of water conservancy and hydropower engineering; There shall be no less than 10 persons with intermediate or above titles in water conservancy and hydropower engineering related majors.
(3) There are not less than 65,438+05 construction site management personnel with certificates, and the builders, quality controllers, safety officers, materials engineers and librarians are complete.
(4) There shall be no less than 20 skilled workers at or above the intermediate level who have passed the examination or training.
(5) The technical director (or registered construction engineer) shall preside over the completion of at least two engineering achievements required by the Class II and above standards of this category.
Scope of contracted works:
Super enterprise:
1. Enterprises that have obtained the special qualification of construction general contracting can undertake the general contracting, design, general contracting and project management of all levels of projects in this category;
2. Those who have obtained any 1 super construction general contracting qualification and two first-class construction general contracting qualifications for housing construction, highways, railways, municipal utilities, ports, waterways, water conservancy and hydropower can undertake the construction general contracting, project general contracting and project management business of the above-mentioned professional projects, and have corresponding design leading professionals to carry out construction drawing design business.
3. After obtaining the special 1 construction general contracting qualification and two first-class construction general contracting qualifications in the fields of building construction, mining, smelting, petrochemical, electric power, etc., they can undertake the construction general contracting, project general contracting and project management business of the above-mentioned professional projects, and have corresponding design leading professionals to carry out construction drawing design business.
4, super qualified enterprises, limited to undertake the construction of a single contract amount of more than 60 million yuan of housing construction projects.
First-class enterprise: can undertake the construction of various water conservancy and hydropower projects.
Secondary enterprise:
It can undertake the construction of water conservancy and hydropower projects below medium-sized and hydraulic structures below Grade 3, but the scale of the following projects is limited to the following scope: dam height below 70 meters, total installed capacity of hydropower station below 150MW, hydraulic tunnel diameter below 8m (or other types with equal cross-sectional area), length below1000m, and dike grade below 2.
Third-level enterprises:
It can undertake the construction of water conservancy and hydropower projects with a single contract amount of less than 60 million yuan: the general contract of small-sized (1) hydraulic structures and hydraulic structures with building grade below Grade 4, but the following projects are limited to the following scope: dam height below 40m, total installed capacity of hydropower station below 20MW, total installed capacity of pumping station below 800KW, hydraulic tunnel diameter below 6m (or other types with equal cross-sectional area) and length below 50.
Note: 1. Water conservancy and hydropower projects refer to all kinds of projects (including supporting and ancillary projects) aimed at flood control, irrigation, power generation, water supply, waterlogging elimination and improvement of water environment. The main contents of the project include: the construction of hydraulic structures (dams, dikes, sluices, spillways, hydraulic tunnels, culverts and culvert pipes, water intake structures, river training structure, canal systems, navigation, wood-crossing, fish-crossing structures and foundation treatment), the construction of hydropower stations, the construction of water pumping stations, the installation of hydraulic machinery, the manufacture and installation of hydraulic metal structures, the installation of electrical equipment, the automation information system, the construction of environmental protection projects, and the control of water and soil. As well as the construction of roads, bridges, communications, hydrology, shaft sinking and other projects related to flood control and drought relief, as well as the construction of ancillary projects of management houses related to the above projects, see Technical Terminology Standard for Water Resources and Hydropower Engineering (SL26-20 12) for details.