What is a technical standard? What is the process for preparing technical bids?

Tenders usually include two parts: commercial bid and technical bid, and there is a big difference in the contents of these two parts. Today, the editor will introduce to you what a technical standard is and what the process of preparing a technical standard is. Interested friends, let’s learn together!

What is a technical bid?

Technical bids are used to evaluate and judge the technical capabilities of bidders, mainly in terms of construction organization design, including construction organization The various technical measures taken to complete the projects stipulated in the bidding documents, such as design, reflect the company's construction organizational capabilities, technical management capabilities, construction plans and craftsmanship. The technical bid is the construction organization commitment made by the bidder to the tenderer, and has a guiding and restrictive role in the design of the implementation construction organization and the implementation of the project.

Introduction to the preparation process of technical bids

1. Review the bidding documents and drawings

After getting the bidding documents and drawings, you should read them carefully, then mark the key points and go in-depth Understand so that the bid preparation process can fully respond to the bidding documents and the requirements of the owner and designer.

Fully understand the content and requirements of the bidding documents:

1. The location, scale, structural form and characteristics of the project;

2. Construction environmental conditions and construction The key points and difficulties;

3. Requirements such as construction period, quality, safety, environmental protection, and civilized construction;

4. The spirit of the owner and the design intention of the designer.

2. Formulate the technical bidding plan

In the engineering technology bidding stage, the preparation level of the technical bidding plan directly determines the score of the technical bid, thereby affecting the bid evaluation results. The technical bidding plan should be reasonable and optimized, fully respond to the requirements of the bidding documents and closely follow the intentions of the designer or owner.

A bidding technical plan mainly includes four parts:

1. Overall project arrangement.

First, compare with the bidding documents, respond and make commitments to the construction goals of the project, such as: planned construction period, quality level, safe and civilized construction goals, etc., and then elaborate and analyze the project overview, characteristics, etc., and make Targeted construction deployment, resource allocation, site layout, construction schedule arrangement, etc. This part directly reflects the characteristics of the project and is the key to reflecting the level of tender document preparation. It should be reasonably arranged and elaborated in detail.

2. Specific construction methods.

The specific construction methods of the project should be described in detail, and the common and conventional content should be streamlined. The construction of key processes and special parts should be described in detail, and the possible construction methods that may be used in the project should be described. The technical patents, construction methods and new technologies and methods used will be described. This part reflects the company's technical level and strength, and should be specifically demonstrated and accurately demonstrated.

3. Guarantee measures.

Guarantee measures such as organizational structure, construction period, quality, safety, and civilized construction must be comprehensive and cannot be omitted. This part should be explained closely in conjunction with the bidding documents to meet the requirements of the bidding documents, relevant local departments and current specifications. This part reflects the company's scale and strength, as well as the company's management model and management level, and is an indispensable part of the bidding plan.

4. Other contents required by the bidding documents.

The content of this part varies depending on the bidding project. Sometimes it will reflect the bidder's focus on the project from a certain aspect, which is the focus of the plan and should be highly valued.

3. Preparation of technical bids

Technical bids mainly include:

1. Technical outline

2. Technical documents

(1) Preparation basis and principles, project overview, overall construction description;

(2) Site layout and temporary projects, construction plan drawings, land use and power demand plan;

(3) Schedule and network plan, material supply and labor use plan;

(4) Configuration of mechanical equipment, measurement and test instruments;

(5) Construction of major engineering projects Methods and construction technology;

(6) Quality and safety system, civilized construction and construction period guarantee;

(7) Construction technology diagram and various forms. Note: Bidding work is a systematic project that requires not only division of labor, but also cooperation, coordination and cooperation in order to make a good bidding document.

3. Service commitment

4. Attached drawings and schedules

5. Others

More about engineering/services/procurement To write and produce similar tender documents to improve the bid winning rate, you can click on the official website customer service at the bottom for free consultation: /#/?source=bdzd