Application form for online open courses on cartography-how to write a project application form

Example of project application form

Example of project application form contains the main members of the project team, the main data of the research on this project, the current research status of this project at home and abroad, and what breakthroughs are expected, Analysis of the conditions for completing this project, the final completion time and the form of the final results. The sample essay is as follows:

1. Main members of the research team

Name, gender, age, administrative position, professional position, and work unit (the research team members shall not exceed 10 people).

Project Demonstration: The purpose and significance of this research: With the continuous deepening of quality education in the new curriculum, people are increasingly focusing on classroom teaching as the center, and gradually established that "classroom teaching is the implementation of The reform concept of "the main position and main channel of quality education".

2. The main data of this research project

Reasonably create mathematical situations and conduct research on the role of teaching on student learning in the situations. A study of types of situation creation. Research on the position and role of the creation of mathematical situations in the structure of mathematics classrooms.

3. The current research status of this topic at home and abroad, and what breakthroughs are expected

Now, the education sector has generally shifted from exam-oriented education to quality education, and the simple imparting of knowledge in the past has been transformed into cultivating skills. , develop intelligence and stimulate creativity, both teaching methods and teaching methods have transitioned to quality education, as primary school mathematics education as basic education.

4. Analysis of conditions for completing this project

Teacher conditions: The research team has a group of relatively mature young mathematics teachers, many of whom have won awards in high-quality mathematics courses and There are many "rising stars", "teaching experts" and "key teachers" at the county and township levels, which provide excellent human resources for the development of this research.

5. Final completion time and final result form

Completion time: XXXX year XX month, final result form, final report, scenario creation set and case set in primary school mathematics classroom teaching , material collection.

Things to note in the project application form

For applicants, there are three main parts to pay attention to in the project application form, namely topic selection, project group and project argumentation. Among them, topic selection The topic needs to be selected and determined by the person in charge of the topic, and it must meet the criteria for topic selection. The research group must meet the number of people and member structure. Once determined, you must follow the content prompts and fill in the corresponding content. Five sample project application documents

Although the project application form has a certain relationship with the feasibility study report, it is not a feasibility study report. The application form for each project should be written specifically in accordance with the requirements of the government notice. There is no unified format, but the general content of the application form for each system will be similar. The following is a project application template that I have compiled for you. I sincerely hope that you can To help you!

Project Application Form 1

Guizhou Province Postgraduate Research Project Fund Project

Application Form

Applicant: Location Colleges and Universities: Application Date:

Guizhou Province Degree Administration System

1. Basic Project Information

2. Basis for Project Establishment

3. Research Plan

4. Budget table

5. Expert opinions (it is recommended that experts be those with deputy senior titles or above)

6. Related opinions

The first postgraduate scientific research fund project in Guizhou Province

The first postgraduate scientific research fund project in Guizhou Province aims to provide scientific research opportunities and conditions for graduate students, promote them to carry out systematic and standardized scientific research training, and give full play to their innovative advantages , explore innovation potential and improve scientific research, practical capabilities and innovation levels.

1. The application targets are first-year master's students and first- and second-year doctoral students studying full-time in ordinary colleges and universities in the province, who have basically completed the degree courses and obtained passing grades. 2. Application conditions and requirements

Applicants must have good scientific research quality and basic conditions. The applicant's school, discipline and instructors actively support their innovative research work, and the university where they work can provide corresponding conditions and guarantees. The project topic selection should focus on major theoretical and disciplinary cutting-edge issues, or be closely integrated with the needs of economic and social development. The project implementation period is generally one year. After the project is completed, the project leader can apply for thesis defense. Project instructors should regard project implementation as an important training and guidance responsibility, and provide strict and standardized scientific research training to applicants through project implementation.

Sincerely

Salutes!

Applicant: xuexila

__year__month__day

Project Application Form 2

Approved Project Number:

Shanghai Institute of Electric Power Graduate Innovation Project

Application Form

Project Name: With self-owned Adaptive function residual current protector

College: School of Electrical Engineering

Project leader:

Instructor: Chi Changchun Position and title: Professor

The date of preparation and filling of the form by the Graduate Office of Shanghai Institute of Electric Power: April 16, 20

Instructions for filling in the form

1. Before filling in this application form, you should read it carefully< Regarding the 20__ Shanghai Institute of Electric Power Graduate Innovation Project Application

Notice> and other relevant documents, be sure to fill them out realistically, and the information filled in must be true, complete, and legal. 2. This application is for the review and project archiving of Shanghai Institute of Electric Power’s postgraduate innovation project for future reference. It should be printed on A4 paper, and no other cover should be added to the cover. The applicant must submit two copies of this application form and an electronic version of the form to the Graduate Studies Office within the specified time.

3. The application must be reviewed by the secondary college, signed with clear opinions and stamped with the official seal before it can be submitted. 4. Instructions for filling in some columns:

1. The name of the subject category, subject name and its code should be filled in according to the "Catalogue of Degree Granting and Talent Training Subjects (2011)" promulgated by the Degree Committee.

2. The personnel involved in this table all refer to the employees whose personnel relations are affiliated with the unit, and part-time personnel are not included. In addition to the brief profiles of academic leaders, the results (papers, monographs, patents, scientific research awards, teaching achievements, etc.) involved in the table refer to the results obtained by the personnel in the discipline who are signed by their own units. The results obtained by the signatures of other units are not filled in and will not be counted. .

3. The project leader should be the graduate student applying for the project. 4. The information filled in this form does not involve state secrets and can be made public.

5. All information in this application must be filled in. Please fill in the blanks with [None".

2

1. Project Applicant Information

2. Applicant Mentor information

3. Project team member information

3

5. Project introduction

4

5

6. Application budget

6

7. Applicant’s commitments

7

8. Recommendation opinions of the applicant's tutor

9. Review opinions of the secondary college

10. Expert review opinions

Sincerely yours

Salute!

p>

Applicant: xuexila

__year__month__day

Project Application Form 3

Dear __ Economic Development Zone Leader of the Management Committee:

Inspired by the investment promotion policy of __, our Shandong __ Agricultural Materials Co., Ltd. has decided to invest in the construction of "Shandong __ Warehousing and Logistics Co., Ltd. Company" project. The relevant planning of the project is as follows:

1. Project positioning

The market positioning of Shandong __ Warehousing and Logistics Co., Ltd. is: relying on the special status at the junction of the four provinces of Shandong, Shandong, Henan and Anhui, and __ is the core of the logistics center. Based on the logistics infrastructure and logistics enterprises in __ and surrounding cities, and with the national comprehensive transportation network as the backbone, it builds logistics service areas and main logistics service channels, forming a framework for __ logistics development and operation. The connotation of logistics is: building a one-hour regional distribution logistics circle oriented to important industrial bases, commodity distribution centers, and urban consumption functional areas in the urban area; building a 1-hour regional distribution logistics circle centered on __ and relying on logistics facilities in __ and surrounding cities, oriented to 3-hour distribution and terminal distribution logistics circle in __ and surrounding cities; building a 12-hour terminal distribution logistics circle centered on __ and supported by logistics facilities in major domestic economic center cities

2. Project Investment

The total investment of this project is 35 million yuan, including: 5 million yuan of project registered capital, 27 million yuan of construction investment, and 3 million yuan of working capital. All funds required for the project are raised by our company. .

3. Construction scale

This project is planned to be built in the __ Economic Development Zone, covering an area of ??50 acres. It is planned to build a modern standard warehouse of 1.8 million square meters, and the office building occupies an area of ??50,000 square meters. The land area is 1,200 square meters, the driver's canteen and dormitory area is 750 square meters, the communication room covers an area of ??50 square meters, the parking lot and roads are 13,350 square meters, and 36 vehicles have been purchased (including 6 12-ton vehicles and 6 8-ton vehicles) , 12 2-ton trucks, 12 1-ton trucks) and ancillary facilities and supporting facilities such as water, electricity, fire protection, and greening.

Now I am applying to the leaders for 50 acres of project construction land, and I sincerely ask the leaders to give their approval despite their busy schedule!

Attachment: "Shandong __ Warehousing Logistics Co., Ltd. Construction Project Feasibility Research Report"

Sincerely

Salute!

Applicant: xuexila

__year__month__day

Project Application Form 4

__Municipal___ Bureau:

_______ Co., Ltd. is operated by the ___Municipal__District Foreign Economic and Trade Commission___________ Document No. "Approval of the Contract and Articles of Association of Sino-Foreign Cooperative _________ Co., Ltd." was approved and established on ____, month ____, with a registered capital of HKD 4 million and an operating period of 20 years. The current location is _________(address), __ District, __ City, with square meters of land purchased, and the construction project is: ______ Co., Ltd. This project has obtained the environmental impact report approval from the ____ Environmental Protection Bureau. It is expected that the completed factory building_building will cover an area of ??about square meters, the workshop_building_floor will cover an area of ??about square meters and the building area will be about square meters; the workshop building_building_floor will cover an area of ??about square meters and the building area will be about square meters;__warehouse The floor area of ??building _ is approximately square meters, and other fire pools and story pools cover an area of ??approximately square meters; the total construction area is approximately square meters; the total investment in the project has increased to ____ million yuan, and the construction funds will be raised by our company. Our company produces and sells self-produced _____ (product name); the production scale is ___ tons, ___ tons per year. The planned number of workers is about _. Main production technology:_____________. At the beginning of _____, our company took advantage of its many years of ____ production technology advantages abroad and introduced foreign innovative processes. The first domestic product _______ mainly used _____ as the main production materials. Because of ______, there was no wastewater discharge. , which protects the source of water very well; the production equipment is _____ machine, there are no special requirements for power equipment, and it contributes to environmental protection and energy saving. At present, our company has obtained the environmental protection department’s reply to the environmental protection opinion letter for this project. Our company's products________

_(company operating status) are operated based on the management model of active innovation, standardized management, prevention first, and safety first. However, due to the continuous development of business, due to the location Safety and fire hazards have emerged due to deficiencies. It is hoped that with the strong support of relevant departments, the enterprise will develop more healthily and steadily. I am now applying to your bureau to handle the construction project approval procedures, and I sincerely request your approval!

Sincerely yours

Salutes!

Applicant: xuexila

_ _year__month__day

Project Application Form 5

Dear __ County Animal Husbandry Bureau:

I am a returning migrant worker, living at home The Longmen Group of Miaoping Village, Daoba Township, used to work outside for a long time and relied on the meager income from work to support their families. According to the government's relevant poverty alleviation policies, I want to use my own forestry contracted barren hills DD___ to establish a forest-raised broiler farm. The following is the application report for this project.

1. The basic situation of ___ forest broiler farm

___ belongs to the Longmen Group of Miaoping Village, Daoba Township, and is located in three counties (Guizhou and Chongqing) of two provinces and cities (Guizhou and Chongqing). At the intersection of the four townships (Daoba, Xiaojing, Qianlong, and Shashapo) of Yinjiang, Yanhe, and Xiushan, the Daomiao rural road is also planned to be above the intersection of the grade highway from Yinjiang to Yanhe. The environment here is beautiful, far away from the hustle and bustle of the city, with no industrial pollution and abundant water resources. It is especially suitable for breeding, processing and producing green food. In particular, the transportation here is very convenient, extending in all directions, which facilitates the transportation and sales of products.

2. The market demand is huge and the breeding prospects are broad

Farmers in our county have a long history of raising chickens, and every family has the habit of raising chickens.

According to statistics from relevant departments, the demand for chicken in our county has increased in recent years, but the number of large-scale chicken farms in our county is very limited, and a large number of broilers are transported and sold from outside the county, which has affected the economic interests of farmers. damaged. If this part of the broiler chickens is supplied by the county's broiler farms, the demand will be quite large. At the same time, we can also make full use of the convenient transportation conditions and our friends who are doing broiler business in Xiushan to transport broilers from our county to other places. Therefore, building a 20,000 forest-raised broiler chicken farm in ___ will not worry about sales.

3. Social Benefits

1. After the breeding industry, which is a government financial construction project, is put into operation and makes a profit, based on the annual average benefit and the annual net income of nearly 100,000 yuan, the government can gain A stable tax. At the same time, it can also play a radiating role, driving some industries, such as planting and feed processing, directly employing some migrant workers, lifting a considerable number of local villagers out of poverty, and gradually leading a prosperous life. It also led the people of our township to develop the breeding industry and become rich, laying the foundation for the masses to get rid of poverty and become prosperous.

2. It can improve the actual living standards of local villagers and completely solve the problem that our villagers have difficulty eating meat; on the other hand, after meat, eggs, and poultry are put on the market, they can stabilize market prices and prevent Illegal traders making huge profits will promote the smooth development of various undertakings in our county. Through the above analysis, it shows that it is completely feasible and very necessary to establish and develop ecological breeding industry in our area. It not only has obvious poverty alleviation effect, but also has obvious economic and social benefits. This will definitely promote the poverty alleviation and development in our area. It is hoped that the government will provide policy, technical and financial support in the process. I hereby apply and hope that the government and relevant departments will approve my application. Thank you!

Sincerely yours

Salute!

Applicant: xuexila

Year __ __month__day

Five sample project application documents related articles:

★Five sample company project application documents

★Project application format sample Five articles

★5 selected sample project application letters

★How to write a sample project application letter

★5 selected sample project proposal letters< /p>

★Five project plan sample articles

★Five project proposal application format reference articles

★5 project proposal 2020 selected sample articles

★Five Project Proposal Samples

★Comprehensive Project Application Samples How to Write a Project Application Form

How to Fill in the Project Application Form\x0d\ 1. Review of the Current Research Status at Home and Abroad And the significance of topic selection:\x0d\\x0d\The purpose of this part is to promote theoretical innovation and see whether your vision is at the forefront of research on this subject. For example, our research is standing on the shoulders of giants, not on the feet of giants. Although the giant is tall, you will definitely be taller than him if you stand on his shoulders. But the premise is that you have to touch the shoulders of giants, that is to say, we should take the end point of previous research as the starting point. If you take another step forward, you will also make a contribution. This article is to let you analyze to what extent previous research on this problem has been done, what problems have been solved, and what other important problems need to be solved. It allows you to analyze this problem and see whether your analysis is accurate or not. Some research topics It may be filling in the gaps, but there will also be relevant situations that can be analyzed. The theoretical and practical significance of the topic selection must also be clearly stated. This depends on a macro perspective and an overall concept. \x0d\\x0d\ 2. The basic ideas and main points of the research on this topic: \x0d\\x0d\ On the basis of previous research, how do you plan to conduct research on this topic? The basic idea of ????the research is to include the entry point What is it, what are the key points and difficulties, what are the basic logical relationships, what methods are used, etc. That is to say, if you plan to do this topic, you should outline it. \x0d\The next step is to write down the main points you have in the research process of this topic according to certain logical relationships. In the past, some applicants wrote down all the chapters and contents of the books they would write in the future, but did not include any basic ideas or main points. This is not acceptable. Now you need to write down your basic views and the basic connections between them, and let the review experts take a look at whether your views are new, or how realistic and pertinent your countermeasure research is, and whether it is Operability, basic ideas and viewpoints, research results, etc. Some people say that I haven't taken this topic yet and haven't started research yet, so how can I have new ideas?

But how can you do it if you apply for this project and the research is done on a whim or casually? You must have a preliminary research foundation and what level it has reached. This can be roughly seen from the basic ideas and main points you fill in. \x0d\ 3. The degree of innovation, expected significance and value of this topic: \x0d\\x0d\ You have talked about so many ideas and opinions, but what problems have been solved? Are these ideas and opinions your first time? What level of innovation has been achieved and what significant theoretical and practical significance it has. For applied research and countermeasure research projects, they must be truly effective, analyze and solve major practical problems in economic and social development, and play an important role in the scientific decision-making of the party and government. Of course, this part is anticipatory, but its reality, pertinence, operability, etc. must also be analyzed concisely in the loose leaf. This mainly refers to topics in application and countermeasure research. \x0d\\x0d\ 4. Research basis: \x0d\\x0d\Include your existing important relevant results and main references. Having rich preliminary research results can not only shorten the research cycle, but also ensure the quality of the research. Important and authoritative necessary references must be listed. Important arguments, tables, and preliminary research results should also be listed. If you lack a solid research foundation, it is impossible to get your project approved.