1, select manufacturers, check enterprise information, patents, high prices, credit, etc. Online, find something reliable. Huiside Automation has a patent, high level and good credit, and it is also reassuring to consult and customize the circular guide rail transportation line.
2, clear parameters, need to clear the parameters required for the circular guide rail conveyor line:
A, the shape and size of the annular guide rail can be placed;
B, clear installation mode, horizontal, vertical or hoisting;
C, determining the required work quantity and station spacing;
D, determining the positioning quantity and positioning accuracy requirements;
E. moving interval time of adjacent stations;
F, determine the load weight of the station, whether there is unbalanced load demand, whether there is dynamic pressure in the station, and how big the pressure is;
G, rack requirements, protection requirements, operating environment requirements, etc. It also needs to be clear and avoid omissions.
3. The construction period, that is, the delivery time, normally depends on the complex situation of the circular guide rail conveying line, and generally ranges from 15 to 25 days, so it is difficult to postpone it properly. It will be longer if there is no need for cooperative research and development in the industry.
4. Payment, such as non-standard customization of non-small amount, usually consists of deposit+payment before shipment of finished products+final payment after confirmation and acceptance.
Customized circular guide rail conveyor line needs to pay more attention to the demand, and it is best to communicate clearly with engineers on both sides of the drawing to avoid omissions and parameter errors.