Five samples of equipment sales contract

With the establishment of people's legal awareness, the frequency of using contracts is on the rise, and signing contracts can balance the equal status of both parties. The following is the equipment sales contract I compiled. For more equipment sales contracts, click "Equipment Sales" to view.

Equipment sales contract 1

Signing place:

Party A (buyer): Party B (seller):

1. According to the Contract Law, on the basis of equality, mutual benefit and consensus, the buyer agrees to buy from the seller, and the seller agrees to give the buyer the following equipment (hereinafter referred to as equipment):

If there is a detailed configuration list signed by both parties in this contract, please refer to the annex for details.

2. Delivery period of equipment: Party B shall deliver the above-mentioned equipment to Party A within _ _ _ days after the contract comes into effect, and the overdue period shall be implemented according to Article 7.

3. Equipment transportation, installation and acceptance

3. 1 Party B shall ensure that the equipment arrives at the place designated by Party A safely and undamaged, and bear the freight and insurance fees of the equipment, and the loading and unloading fees shall be borne by _ _ _ _ _.

3.2 Party A and Party B shall accept the unpacked equipment. If insufficient quantity or quality and technical problems are found, Party B shall take measures such as replenishment, replacement and return within _ _ _ days according to Party A's requirements, and bear all losses and expenses arising therefrom.

3.3 After the arrival of the equipment, Party B shall complete the installation and commissioning within _ _ _ _ _ days after receiving the notice from Party A. ..

3.4 On the basis of meeting relevant national technical standards, Party A and Party B shall conduct technical acceptance according to the technical standards of this contract (see annex). After the acceptance, both parties shall sign the acceptance certificate of Party A for confirmation.

4. Payment method

Party A shall _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

5. Escort service

5. 1 party b shall provide technical documents of the equipment, including corresponding drawings, operation manuals, maintenance manuals, quality assurance documents, service guides, etc. These documents shall be delivered to Party A together with the equipment.

5.2 Party B shall also provide the following services free of charge:

On-site installation and debugging of equipment

Provide special tools and auxiliary materials for equipment installation and maintenance.

Party B shall send professional technicians to the project site to train or guide Party A's users, and can arrange another training plan according to Party A's requirements after a period of use.

6. Quality assurance and after-sales service

6. 1 Party B shall guarantee that the equipment provided is brand new and has not been used after _ _ _ _ _ _ (year, month), and meets the requirements of relevant national standards, manufacturer standards and contract technical standards. If the quality or specifications of the equipment are not in conformity with the contract, or it is confirmed that the equipment is defective, including potential defects or unqualified materials, Party B shall be responsible for replacing or repairing the defective parts with new parts, components or equipment that meet the specifications, quality and performance requirements stipulated in the contract within 7 days after receiving the notice from Party A, and the expenses shall be borne by Party B. At the same time, Party B shall extend the quality guarantee period of the repaired or replaced parts according to the provisions of this contract.

6.2 Party B shall provide a _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ If this requirement cannot be met, the warranty period shall be extended accordingly.

6.3 The response time for repairing is _ _ _ _ _ _ hours, and the attendance time is _ _ _ _ _ _ _ _ hours (except for force majeure).

6.4 After the warranty period expires, the labor cost of a single failure shall not be higher than _ _ _ _ yuan, and the annual preventive maintenance frequency shall not be lower than _ _ _ _ _.

6.5 Party B is responsible for the lifelong maintenance of the equipment, and shall continue to provide quality services and reserve sufficient spare parts. After the expiration of the warranty period, Party B will provide maintenance spare parts at a preferential price of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

7. Claim clause

7. 1 If the US Food and Drug Administration confirms that the goods are not in conformity with this contract, the buyer has the right to choose one of the following methods to ask the seller for remedy:

7. 1. 1 agrees to the buyer's return, and will fully refund the buyer's payment, and bear all direct losses and expenses arising from the return.

7. 1.2 Depreciate the goods according to the degree of defects, damage scope and losses suffered by the buyer.

7. 1.3 The replaced defective goods must be brand-new and conform to the specifications, quality and performance specified in this contract, and the seller shall be responsible for all expenses and all direct losses incurred by the buyer.

7.2 If Party B fails to deliver the goods and provide services within the time stipulated in the contract, Party A shall deduct the late payment compensation from the payment without affecting other remedial measures under the contract. The compensation for delayed delivery and delayed service shall be charged at 0.5% of the contract price for delayed delivery every week until delivery or service is provided. However, the limit of deferred compensation shall not exceed five percent (5%) of the contract price. A week is counted as 7 days, and part of it is counted as a week. Once the delay compensation limit is reached, Party A has the right to terminate the contract.

7.3 Party B shall ensure that Party A and users will not be sued by a third party for infringing their patent rights, trademark rights or industrial property rights when using the equipment or any part thereof.

8. Settlement of disputes

In case of any dispute during the performance of this contract, both parties shall first negotiate amicably. If negotiation fails, both parties shall bring a lawsuit to the court where the contract is signed.

9. The contract came into effect

9. 1 This contract shall come into force after being signed and sealed by both parties.

9.2 This Contract is signed on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

10. Annex to the contract

The annex to this contract is an integral part of this contract and has the same legal effect as this contract.

10. 1 Configuration List Device Configuration List

10.2 technical specifications of technical response equipment in bidding documents of technical standards

1 1. Special Agreement _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Party A: Party B:

(Seal) (Seal)

The legal representative or authorized client of Party B shall be appointed by Party A.

Date: _ _ _ _ _ _ _ _ _ _ _ _ Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Equipment sales contract 2

Party A:

Party B:

According to the relevant provisions of the Contract Law, Party A and Party B have reached an agreement on the purchase of "kitchen equipment and smoke exhaust system" on the basis of equality and mutual benefit, and are willing to abide by and perform the terms of this contract.

1. Name and quantity of goods:

The name, specification, model, quantity, quality and unit price of the goods are shown in the list of goods.

Second, the project location:

Three. Contract cost: The total contract cost is RMB (¥).

Four. Payment method:

1, paid in cash ¥.

2. After signing this contract, Party A shall pay Party B the advance payment for the project in words (¥).

3. Party A shall pay Party B the project progress payment in words (¥) after Party B has installed the smoke exhaust and fresh air purification system.

4. After all the equipment has been installed and debugged by Party B's engineers and technicians and accepted by Party A, Party A shall pay Party B RMB (in words) as the project payment, and Party A shall pay Party B's consumption in 30 yuan.

5. After receiving the project payment from Party A, Party B shall issue a receipt to Party A. ..

Five, the project completion time:

1. After this contract is formally signed, Party B will receive the advance payment from Party A, and Party A can complete the installation ... (except for force majeure) within working days from the date of site construction.

2. The warranty period of this project and equipment is years. During the warranty period, Party B shall provide services within the warranty scope for Party A free of charge, including the cost of replacing spare parts. After the warranty period expires, if Party A needs it, Party B shall respond positively and provide Party A with maintenance services at a unified market price.

In the process of construction, Party B's construction personnel must strictly abide by the safety construction norms to ensure safe construction. Any accident of Party B's construction personnel in the construction process shall be borne by Party B. ..

Seven. Liability for breach of contract:

1. Since Party A pays the first project advance payment to Party B, if Party B fails to complete the project within days, Party B shall bear 0.000% of the total contract price as penalty for each day of delay.

2. After the installation and debugging of the project is completed and qualified, Party A shall pay the final payment of the project to Party B as agreed. In case of breach of contract, Party A shall bear the penalty of 0.0 ‰ of the overdue amount for each day overdue.

8. Any dispute between Party A and Party B shall be settled through friendly negotiation. If negotiation fails, it shall be submitted to the Arbitration Commission for arbitration.

Nine. The annex to this contract is an integral part of this contract and has the same legal effect as this contract. The annex to this contract is "Quotation Sheet for Kitchen Smoke Exhaust and Ventilation System".

X. Conditions for entry into force of the contract:

1. This contract shall come into effect as of the date of signature and seal by both parties.

2. The annexes to this contract are an integral part of this contract and have the same effect as this contract. The annex to this contract is "Summary Table and Quotation Table".

3. This contract is made in duplicate, with each party holding one copy.

XI。 Other agreements:

For matters not covered in this contract, both parties may negotiate separately and sign a written supplementary agreement.

Party A (seal): Party B (seal):

Legal representative or authorized person: legal representative or authorized person:

Year, month, year, month, year

Equipment sales contract 3

Number:

Purchasing unit (Party A):

Supplier (Party B):

Forensic medicine:

According to the Government Procurement Law and other laws and regulations and the procurement document No.,Party A and Party B have reached the following terms through consultation:

Article 1: Equipment brand, specification, model, quantity, price, etc.

Amount Unit: Yuan Quantity Unit: Taiwan

Name and brand of equipment

Specifications and models

amount

unit

Unit price (yuan)

Total price (yuan)

comment

Total contract price (RMB in figures):

Total contract price (RMB in words):

Note: The above-mentioned total contract price includes the freight to Party A and the installation and debugging fees. ..

Article 2: Quality Assurance

The equipment provided by Party B is a qualified product that meets the national technical specifications and quality standards, has been certified by the national "Three C" or inspected by relevant state departments, has not been unpacked, is consistent with the model and configuration specified in the contract, and can be normally connected with the user's existing equipment; After the equipment is installed and debugged, the system security of Party A can be guaranteed within the functional scope of the equipment, and the provided equipment meets the procurement requirements of Party A. The software product is the original product package or license agreement provided by the original manufacturer. If the equipment provided does not conform to the contract, Party A has the right to reject or return it, and all the responsibilities and consequences arising therefrom shall be borne by Party B. ..

Article 3: Time and place of delivery

1. Party B shall deliver the supplied equipment (original packaging) to the designated place (Hangzhou) within working days after the contract comes into effect, be responsible for installation, debugging and equipment integration, and install other related software according to Party A's requirements (the software copyright shall be borne by Party A), and submit it to Party A for acceptance after normal operation.

2. When the supplied equipment is delivered for use, Party B must provide Party A with the product instruction manual, quality guarantee, three-guarantee certificate and other related materials and original accessories.

Article 4: Acceptance

1. After Party B delivers the supplied equipment to the delivery place for unpacking, installation and debugging, Party A will conduct on-site acceptance, and both parties will sign the Acceptance Reply Form for Goods Purchased by Hangzhou Municipal Government and the Feedback Form for Quality of After-sales Service after Procurement by Hangzhou Municipal Government. The products provided by Party B are uniform in model, correspondence and description.

2. The appraiser will perform the supervisory duties together with the procurement office, the supervision and auditing departments and the technical consultants hired.

Article 5: After-sales service

1. After-sales service shall be implemented in accordance with relevant national regulations, and Party B shall provide on-site service. The warranty period of the purchased equipment is months from the date of acceptance, and Party B provides 7_24 hours telephone technical support and 5_ 12 hours on-site technical service free of charge.

2. On-site service response time: After receiving a call from Party A within the warranty period, Party B will respond in Hangzhou within 30 minutes, arrive at the site within 2 hours, and repair the fault within 4 hours. If it cannot be repaired within 4 hours, Party A shall take measures such as providing spare parts or standby machines to ensure the normal work of Party A, and then replace the parts to be repaired upon arrival.

Article 6: Performance Bond

When signing the contract, Party B shall pay the appraiser a performance bond of 2% of the total contract price (total RMB).

After the performance of the contract, Party B shall issue a unified receipt (stamped with the seal of the financial or tax authorities), and go through the formalities of returning the original value of the performance bond without interest to the certifying party on the basis of the Receipt for Acceptance of Goods Purchased by Hangzhou Municipal Government and the Feedback Sheet for Quality of After-sales Service of Hangzhou Municipal Government Procurement.

Article 7: Payment for goods

After Party A's acceptance and delivery, Party B shall submit the Receipt for Acceptance of Goods Purchased by Hangzhou Municipal Government and the Feedback Sheet for After-sales Service Quality of Hangzhou Municipal Government to the appraiser for filing within three working days, and go through the payment settlement formalities with Party A with the original voucher (invoice) and the Receipt for Acceptance of Goods Purchased by Hangzhou Municipal Government within three working days.

Article 8: Other Agreements

Article 9: Liability for breach of contract

1. If Party B fails to perform the contract on time, it shall pay a penalty of 0.2‰ of the total contract price to Party A every day from the overdue date; If Party B fails to deliver the goods within 65,438+00 days, Party B shall pay Party A a penalty of 2% of the total contract price, and the performance bond will not be refunded. At the same time, with the consent of the appraiser, Party A has the right to terminate the contract.

2. If Party A fails to pay the payment in time, it shall pay Party B a penalty of 0.2‰ of the total contract price every day from the overdue date; If Party A refuses to pay the purchase price without justifiable reasons, it shall pay Party B a penalty of 2% of the total contract price.

Article 10: Settlement of disputes

In case of any dispute arising from this contract, the supplier and the buyer shall settle it through consultation in time. If negotiation fails, it shall be handled in accordance with the provisions of the Procurement Law of People's Republic of China (PRC).

Article 11: Entry into force of the contract

1. After being signed and sealed by the legal representatives of Party A and Party B or their clients, Party B shall send it to the appraiser for verification within three working days, and it will take effect after paying 2% performance bond to the appraiser.

2. During the performance of this contract, neither Party A nor Party B shall change or terminate this contract at will. If there are any matters not covered in this contract, Party A and Party B shall negotiate with the appraisers to sign a supplementary agreement, which has the same legal effect as this contract.

3. The procurement documents numbered, bidding documents, written materials formed in the process of bid evaluation and inquiry minutes are all integral parts of this contract and have the same effect.

4. This contract is made in triplicate, with Party A, Party B and appraisers holding one copy respectively.

Party A (seal): Party B (seal):

Legal representative:

Or the entrusted party (signature); Or the entrusted party (signature):

Address: Address:

Postal code:

Contact person: contact person:

Tel: Tel:

Fax: Fax:

Bank of deposit: Bank of deposit:

Account number: Account number:

Auditor (Seal): Government Procurement Center

Legal representative:

Or the entrusted party (signature):

Address: Dongxin Road 155

Contact person:

Postal code:

Contact telephone number:

Fax:

Signing date: 20 (month).

Signing place: Hangzhou Road No.

Equipment sales contract 4

Buyer: (hereinafter referred to as Party A) _ _ _ _ _ _ _ _ _ _ _ _

Supplier: (hereinafter referred to as Party B) _ _ _ _ _ _ _ _ _ _ _ _

Party A purchases Party B for production needs. Through negotiation between Party A and Party B, based on the principle of "honesty, credit, equality, voluntariness and quality first", * * * hereby concludes this contract:

1. Party A purchases from Party B, and Party B is responsible for designing, manufacturing, installing, debugging and running all the above equipment according to Party A's requirements, and ensuring that all accessories and other supporting products accompanying the main engine are complete.

2. The total amount of Party A's purchase of Party B's complete sets of machinery and equipment is RMB _ _ _ _ _ _.

Three. Time and method of payment

__________________________。

Four. Time, place and method of delivery

Delivery time: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Delivery place: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Delivery method: door-to-door.

Verb (abbreviation of verb) acceptance time and standard

(1) Acceptance time: within _ _ _ _ days after Party B finishes debugging;

(2) Acceptance criteria:

1. All equipment must be of the specified model and specification. Unqualified fake and shoddy products shall not be used.

B, the installation of all equipment should conform to the process of production equipment itself, reflecting the principle of durability and quality first-,and the quality is up to standard.

Safety requirements for intransitive verbs

Party B shall be fully responsible for the safe production in the whole process of equipment transportation, installation and commissioning, and ensure the safe construction, with the responsibility to the people. During the installation and commissioning, in case of casualties and other accidents, all losses or economic compensation caused thereby shall be borne by Party B. ..

Seven. field service

Party A is responsible for the basic production of all equipment installation and all required materials, and provides them to Party B, arranges accommodation for Party B's field personnel, and provides necessary daily necessities and transport vehicles.

Eight. personnel training

After installation and debugging, teach equipment managers and operators to master the basic operation of the equipment.

Nine, after-sales way

Party B shall provide warranty service according to relevant regulations for one year from the date of acceptance of the equipment by both parties. During the warranty period, Party B must send personnel to the equipment site for maintenance within 1 day after receiving the notice from Party A for maintenance, and the expenses for materials and wearing parts used for equipment maintenance shall be borne by Party A..

X. liability for breach of contract

1. If the variety, model, specification and quality of the products delivered by Party B are not in conformity with the contract, and Party A cannot use them, Party B shall be responsible for replacement or repair, and bear the actual expenses after repair, replacement or return. If Party B cannot repair or replace it, it shall be deemed as non-delivery;

2. If either party is unable to perform the contract due to force majeure, it shall promptly inform the other party of the reasons for performance or non-performance or incomplete performance, and both parties may be exempted from the liability for breach of contract in part or in whole through negotiation.

3. Party A shall ensure the normal construction and installation of Party B. If Party B fails to install normally for no reason, which will affect the installation progress of Party B, Party A shall bear the responsibility. ..

XI。 Matters not covered in this contract shall be settled by both parties through consultation. Changes and amendments to the contract must be agreed by both parties and carried out in writing. The supplementary and revised contract has the same effect as this contract.

12. Any dispute between the two parties shall be settled through negotiation. If negotiation fails, either party shall bring a lawsuit to the people's court where Party A is located.

Thirteen. This contract shall come into effect after being signed and sealed by both parties, and shall be automatically terminated after the rights and obligations of both parties are fulfilled.

14. This contract is made in duplicate, each party holds one copy, which has the same legal effect.

Party A (official seal): _ _ _ _ _ _ _ _ _ _ Party B (official seal): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Equipment sales contract 5

Party A: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

The Buyer and the Seller voluntarily sign this supply and marketing contract according to the following terms and conditions, and abide by them jointly:

Name: _ _ _ _ _ _ _ _ _ _ _

Quantity: _ _ _ _ _ _ _

Price: RMB _ _ _ _ _ ten thousand yuan only (RMB: _ _ _ _ _ _)

(1) price composition

1. Total contract price: RMB (in words) _ _ _ _ _ _ ten thousand yuan only (RMB: _ _ _ _ _ _), and the advance payment amount is _ _ _ _ _ _ _ _ ten thousand yuan only (RMB: _ _ _ _ _).

2. After the equipment installation and debugging, before _ _ _ _ _ _ _ _ _

3. If the buyer fails to pay off all the payment within the time stipulated in the contract, it shall pay the seller a penalty of 5% of the total contract price every day.

(2) Quality and technology

1, the equipment must be consistent with the contracted model.

2, in line with the manufacturer's factory standards.

(3) Mode of supply

The seller shall be responsible for the transportation expenses and deliver them to the designated place at the time agreed by the buyer.

(4) Inspection and handover

After the equipment arrives and unpacks, the buyer and the seller must send representatives to the site for inspection, signature and record.

(5) Installation and training

1. The seller provides the requirements, and the buyer is responsible for the renovation of water, electricity and other required environmental protection requirements.

2. The Seller shall be responsible for the installation, debugging and operator training of the equipment in China.

(6) After-sales service: The above equipment is guaranteed free of charge for one year and maintained for life. (Note: The buyer needs to use the consumables specified by the seller, otherwise the machine failure caused by this will not be covered by the warranty).

(7) Ways to resolve contract disputes

After the contract is signed, the contract may not be terminated without the consent of both parties. If there are any unfinished matters, both parties can solve them through consultation.

(8) This contract is made in duplicate, one for each party, and shall come into effect after being signed by both parties.

Party A (official seal): _ _ _ _ _ _ _ _ _ Party B (official seal): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Five relevant clauses in the sample equipment sales contract:

★ 3 Simple equipment sales contract sample.

★ Sales contract of five latest models of audio equipment

★ Model Equipment Sales Agreement

★ 3 Model contract for purchase and sale of mechanical equipment

★ 5 practical contract templates for second-hand equipment transfer

★ Model Sales Contract Standard Edition (5 copies)

★ 10 pieces of second-hand equipment transfer contract template.

★ 5 samples of simple sales contract

★ 10 product purchase and sale contract sample.

★ 5 samples of product purchase and sale contract