For housing construction projects, the project budget, construction period, etc. are determined according to the size of the project target. As a general construction contractor for a housing construction project, you must be an enterprise with professional qualifications. So, what does the Class A qualification in the engineering and construction industry include? Please continue reading the following relevant knowledge carefully summarized for everyone, I hope it will be helpful to everyone.
1. What does the Class A qualification in the engineering and construction industry include? The comprehensive Class A qualification in engineering design is the qualification with the highest level of engineering design qualifications in my country, the widest coverage of business fields, and the most stringent requirements. The comprehensive Grade A qualification for engineering design can undertake the design business of construction engineering projects in all 21 industries including electric power, chemical industry, petrochemical medicine, nuclear industry, railways, highways, civil aviation, municipal administration, and construction, as well as general engineering contracting business and project management business. Its scale Unrestricted. It can also undertake general project contracting business within the scope of the first-level construction general contracting qualification certificate (construction professional contracting) it has obtained.
II. Engineering Qualification Process 1. After preliminary investigation of project development, a project proposal or project feasibility study report shall be prepared and submitted to the people's government at the same level for approval. 2. At the same time as the people's government at the same level is reviewing and approving the project, submit the above documents to the urban planning management department, and the planning department will form a preliminary site selection for the project construction. 3. The government approval documents are submitted to the planning department for approval, and a notice of project fixed-point planning and a notice of design planning requirements are formed. 4. The developer completes the architectural planning scheme design according to the fixed-site planning notice and the design planning requirements notice (including "four drawings and one book: general plan, positioning drawing, vertical design drawing, pipeline comprehensive drawing, and instructions). 5. Apply for a construction land planning permit with the design planning requirement notice and feasibility study report approval plus the approved planning and design plan. 6. After the project is included in the annual plan, a construction project plan must be applied for before applying for a construction start certificate. At this point, the planning process is completed. 7. Land acquisition and demolition procedures: Land acquisition can be carried out after obtaining the construction land planning permit, and land acquisition and demolition can be applied after obtaining the construction and demolition temporary land permit or land use right certificate. Demolition is an important task before the start of the project. The completion of land acquisition and demolition is one of the necessary conditions for applying for the start of the project. 8. After the project completes the planning process and meets the conditions for start of construction, submit an application to the Municipal Construction Committee and obtain a construction application. Certificate.
3. Criteria for Class A engineering design qualifications 1. Qualifications and credibility: (1) Have independent corporate legal person qualifications (2) Registered capital is not less than 60 million yuan (3) Nearly. The average annual engineering survey and design business income in the past 3 years is not less than 100 million yuan, and the engineering survey and design business income has been ranked within the top 50 national survey and design enterprises twice in the past 5 years; or the business tax and business tax have been paid twice in the past 5 years. Ranked among the top 50 survey and design companies in the country (4) It has 2 Class A qualifications in engineering design industries, and has independently undertaken no less than 3 engineering design projects in each industry for large-scale construction projects in the past 10 years, and has been completed and put into production. Or possess both a Grade A qualification in a certain engineering design industry and a Grade A engineering design professional qualification in three other different industries, and have independently undertaken no less than 4 engineering designs for large-scale construction projects in the past 10 years, among which, the Grade A qualification in the engineering design industry. There should be no less than 1 corresponding performance, and no less than 1 corresponding performance for Grade A in engineering design, and it has been completed and put into production. 2. Technical conditions: (1) The company has strong technical force and reasonable professional equipment. And there are no less than 500 personnel engaged in engineering survey and design, of which no less than 200 have registered professional qualifications or senior professional and technical titles, and there are no less than 5 registered majors, and the total number of registered personnel in the 5 majors is no less than 40 Personnel. The enterprise shall have no less than 10 persons engaged in engineering project management who have registered qualifications as construction engineers or supervision engineers. (2) The main technical person in charge or the chief engineer of the enterprise shall have a bachelor's degree or above and more than 15 years of design experience. Have no less than 2 engineering design projects for large-scale projects, and have registered professional qualifications or senior professional technical titles. (3) Have no less than 3 patents, proprietary technologies, and process packages (software packages) related to engineering design.
(4) In the past 10 years, he has won no less than 5 awards such as the National Excellent Engineering Design Award, the National Excellent Engineering Survey Award, and the National Science and Technology Progress Award, or the first prize (gold award) of the provincial and ministerial level (industry) excellent engineering design award. There are no less than 5 first prizes for provincial and ministerial (industry) scientific and technological progress awards. (5) In the past 10 years, he has edited 2 projects or participated in the compilation of more than 5 national and industry engineering construction standards and specifications. 3. Technical equipment and management level: (1) Have complete technical equipment and fixed workplaces, and the main fixed workplace construction area is not less than 10,000 square meters. (2) Have complete corporate technology, quality, safety and archives management, and have passed ISO9000 family standard quality system certification. (3) Have an organizational structure or management system suitable for undertaking general contracting or project management of construction projects. The above is the relevant legal knowledge compiled for you about the Class A qualifications in the engineering and construction industry. To sum up, we can know that the comprehensive Class A qualifications in engineering design can undertake the tasks of electric power, chemical industry, petrochemical medicine, nuclear industry, railways, highways, and civil aviation. The design business of construction engineering projects in all 21 industries, including municipal administration and construction, as well as general engineering contracting business and project management business, are not limited in scale. If you have any other legal questions, please feel free to consult our lawyers.