The turnover of the workbench,
The workbench of Cai Gang brick press has six processes. In addition to one-time mechanical indexing positioning, there is also a set of accurate positioning mechanism, which completely ensures the accurate positioning of the workbench die in each stamping process. The slide table of the upper die of the device is a box structure, and the contact length between the slide table guide rail and the upper guide rail of the machine body is long. Every time the upper die is punched, the working procedure presses the clay blank twice, that is, after the tile blank is pressed in place by the upper die for the first time, the upper die rises 10 ㎜, and the clay blank can be obtained.
Then, from the first row to the last row, the heights of the four corners of the front and rear queues of the color steel tile pressing equipment from the big frame to the upper end of the bottom shaft should be consistent. Straighten a line, check whether the lower shaft is in a straight line, and level the left and right sides of the lower shaft.
Then tighten the lock nuts on both sides to center the first row and the last row of color steel tile equipment. Draw a straight line before and after the center of the intermediate wheel. After adjusting the gap between the upper and lower shafts, the machine can be adjusted in a straight line.