The world's earliest mortar spraying machine, the most stable mortar loves that spraying machine, Putzmeister, a spraying master from Germany!

in 1958

the "soul leader" of Putzmeister Company: Mr. Karl Schlecht, an engineer, founded KS Machine Manufacturing Company and produced the first mortar machine.

in 1961

the first factory was built near the airport of-Filderstadt- Stuttgart

in 1963

it got a new name "Putzmeister"-meaning the master of mortar machine

in 1964

in Rhine-Ruhr, Munich. Hamburg. Established the first branch company

1965

Production of Gypsomat machine-the world's first stirring pump for plaster continuous operation came out, It marks a new revolution in mortar machine technology.

In 1966

The pneumatic pump "Mixokret" was officially included in Putzmeister's product series.

In 1968

Putzmeister began to produce a 2-meter-stroke hydraulic cylinder piston concrete pump.

In 1969

In 1969, we began to make a brochure of "Concrete Pump Truck" for our customers. The earliest series of "Elephant" C-shaped directional valve has been patented in the world.

in 1972

the 2th mortar machine was sold, and the establishment of overseas branches was planned

in 1974

Putzmeister-France branch was established in Epinay near Paris, and then subsidiaries were established in Italy, Spain, Britain and Brazil.

in 1976

a concrete mixer truck with boom was developed M52- pumi

in 1977

in the construction of Frankfurt Telecom Tower, the pumping height of concrete set a world record of 31M

in 1978

in Gotha Tunnel in Switzerland, it set a world record of 34m vertical pumping and 6M horizontal pumping

. In the same year, it acquired an American Thomsen company. Renamed as "Putzmeister-America" company

1983

Another new innovation-"Shotcrete Buffalo ".The world's largest concrete jet was born

1985

Another concrete pumping record: the 432m Spanish pumped storage power station

1986

was delivered to the world's largest. Putzmeister developed a special anti-radiation pump truck with sealing device. The appearance of this pump truck presents a new concept of digitalization of mechanical spare parts

In 1988

Putzmeister pump truck equipped with electrical system in the construction of European tunnels is responsible for pumping, spraying and cleaning up landslides

In 1989

Putzmeister acquired a Wibau company in Scheele, Rothenberg, near Frankfurt, and began to develop asphalt mixing equipment. In 1989, the pumping distance of Putzmeister TTS 14 high-pressure concrete pump in the wastewater tunnel construction of Chiemsee Lake circular sewer system set a new standard for the development of the industry.

In 199, the service point "Putzmeister Halle" was established near Leipzig airport.

In 1992, it was sold in Japan. In the same year,-MSx concrete mixing pump truck which can be used for indoor and outdoor building maintenance was introduced

in 1993

Putzmeister Racine Company was established-the second branch in the United States

in 1994

the creation of a global world record-"Riva del Garda" in Italy, The vertical pumping height of the pumped storage power station is 532m

The branch of Putzmeister Berlin was established in Berlin

1995

In the new Putzmeister building, The mortar machine became independent and developed into the "Putzmeister Mortar Machine" business unit

In 1996

The third manufacturing base in the world-Putzmeister Shanghai was established in China

In the United States-"Putzmeister Gera Service Base"

In 1997

Putzmeister became a joint-stock company

In 215 Le Refrain in France. Lufthansa jointly developed an aircraft cleaning robot specially used for aircraft cleaning services

In 1998

Putzmeister moved to the north of Tokyo

Karl Schlecht, the founder of the company, retired from his daily operation and became the chairman of the regulatory council

In 1999

Putzmeister established new factories in the United States, Brazil and Spain respectively. Further expand the production capacity

The piston pump KOS 251, with an output of 25 cubic meters per hour, has been customized and developed by Putzmeister System.

delivery of the 1th mixing pump truck

2

A warehouse of equipment logistics operation center was established in Goldisthal, Thuringia, Germany. Different types of tunnel spraying equipment and belt conveyors are put into production.

We have produced three super-large KOS 252 piston pumps with sound insulation devices specially used in urban construction projects, with an output of 5 cubic meters per hour. We have developed a new 46m four-arm product with a unilateral support system for the sludge extraction project in Japan, which is more flexible in narrow construction sites.

We have developed a new humanized control system -EBC.

A new 36m Z-shaped boom appeared at the Bauma 2 Munich exhibition.

in 22

a compact jib pump truck with 58m 6-axle chassis was introduced in the American market.

A newly developed fixed distribution boom of MX39 without counterweight was used in the reclamation project in Japan.

A BSA12 concrete tow pump with the functions of concrete conveying and dry concrete spraying was further developed.

in 23

BSA 72 was successfully introduced to the market. A product used for wet concrete spraying

further developed humanized output control system

cooperated with SIKA AG of Switzerland to develop PM5 tunnel sprayer

developed an automatic placing boom system for precast box girder pouring

improved and developed a new mining machinery SP 11 Beliso

24

based on the original high-pressure pump HSP 25.1. The process control system-humanized pumping system (EPS) and the central pump with double pistons and large capacity and a cylinder diameter of 25MM have been successfully developed

A new 62-meter six-arm pump truck was launched

In 25

Putzmeister AG was reorganized into four business divisions-concrete technology business department; Concrete mortar technology business department; Concrete water treatment technology business department; Technical business department of concrete industry;

Putzmeister provides pump trucks, placing booms and conveying pipes for high-rise buildings in Dubai. The ultra-high pressure concrete pump BSA 14 SHPD

M2-4 and M42-5 were newly introduced; TB11 belt conveyor; Pumi 31.89

In 26

Putzmeister Russia moved to a larger area in the north of Moscow

A new office was established in Dubai

In 26, Strobl Beschichtungstechnik GmbH acquired a company specializing in layer technology, Strobl

Germany was used as a manufacturing center for painting and decoration of customized products

In addition, a series of new products were successfully developed, such as hot water high-pressure pumps.

Putzmeister Acquires Delivery Line Manufacturer Esser.

27

Putzmeister won two innovation awards from German Construction Industry Association in Bauma in 27. Mr. Karl Schlecht, the founder of the company, won the "Building Technology and Management Innovation Award"

Putzmeister USA acquired Allentown Equipment, a well-known enterprise engaged in dry and wet concrete sprayers and fire mortar pumps.

In 28

On February 21st, 28, Putzmeister Group was changed into Putzmeister Concrete Pump Holding Company.