Who is needed for the qualification of general contracting of water transport?

The general contracting qualification of waterway engineering construction is divided into super grade, first grade, second grade and third grade.

1 level 1 qualification standard

1. 1 enterprise assets

The net assets are more than 654.38 billion yuan.

1.2 key personnel of the enterprise

(1) There shall be no less than 15 first-class registered construction engineers specialized in port and waterway engineering.

(2) The technical director has more than 10 years experience in technical management of engineering construction, and has a senior professional title in port and waterway engineering; There are not less than 60 people with intermediate or above titles in the engineering sequence, among which the majors of water transport engineering, machinery and electricity are complete.

(3) There shall be no less than 25 construction site management personnel with certificates, and the quality controller, safety officer and other personnel shall be complete.

(4) There shall be no less than 75 skilled workers (including builders) who have passed the examination or training.

1.3 enterprise engineering performance

In recent five years, I have undertaken the construction of five kinds of projects in the following 10 categories, and the project quality is qualified.

(1) 50,000-ton coastal or 2,000-ton inland river terminal project.

(2) Wharf projects with a tonnage of 50,000 tons or more;

(3) Breakwater works with a water depth of more than 5 meters are more than 600 meters;

(4) 50,000-ton coastal or 65,438-ton inland waterway engineering;

(5)1000t lock or 300t ship lift project;

(6) Dredging works with an area of more than 5 million cubic meters;

(seven) land reclamation projects of more than 4 million cubic meters;

(8) Port yard project with a coastal area of 200,000 square meters or an inland river area of 654.38+10,000 square meters;

(9)/kloc-dike revetment works over 0/000m;

(10) 50,000 cubic meters underwater reef blasting and reef cleaning project.

1.4 technical equipment

Have two of the following seven kinds of construction machinery and equipment:

(1) Piling boat with a height exceeding 60m;

(2) a crane ship of more than 200 tons;

(3) A semi-submersible barge with a capacity of over 3,000 tons or a concrete mixer with a capacity of over 100 m3/h;

(four) the width of the laid raft exceeds 40 meters;

(5) A trailing suction dredger with a tank capacity of more than 2000 cubic meters;

(6) Cutter suction dredgers with a total installed power of more than 5,000 kilowatts;

(7) Dredger with bucket capacity greater than 8 cubic meters.

2 secondary qualification standards

2. 1 enterprise assets

The net assets are more than 40 million yuan.

2.2 Key personnel of the enterprise

(1) There shall be at least 8 first-class registered construction engineers specializing in port and waterway engineering.

(2) the technical person in charge has more than 8 years experience in technical management of engineering construction, and has the senior title of water transport engineering or the qualification of a registered construction engineer of water transport engineering; There are not less than 30 people with intermediate or above titles in the engineering sequence, including port and waterway engineering, machinery, electricity and other majors.

(3) There shall be no less than 15 construction site management personnel with certificates, and the quality engineer, safety officer and other personnel shall be complete.

(4) There shall be no less than 50 skilled workers (including builders) who have passed the examination or training.

2.3 Enterprise Engineering Performance

In recent five years, I have undertaken the construction of five kinds of projects in the following 10 categories, and the project quality is qualified.

(1) Coastal 1 10,000 tons or inland 1 10,000 tons or above wharf works;

(2) Wharf works with a tonnage of 654.38+100000;

(3) Breakwater works with a water depth of more than 3m are more than 300m;

(4) 20,000-ton coastal or 300-ton inland waterway projects;

(five) more than 300 tons of lock or 50 tons of ship lift;

(6) Dredging works of more than 2 million cubic meters;

(7) Land reclamation projects with an area of 654.38+500,000 cubic meters;

(8) Port yard project with a coastal area of 654.38+10,000 square meters or an inland area of more than 50,000 square meters;

(9) Embankment revetment works over 500 meters;

(10) Underwater reef blasting and cleaning project, covering an area of more than 30,000 cubic meters.

2.4 technical equipment

Construction machinery and equipment are equipped with two of the following five items:

(1) Piling boat with a height exceeding 30m;

(2) a crane ship of more than 80 tons;

(3) Laying ships with a row width of more than 20 meters;

(4) Cutter suction dredgers with total installed power 1600 kW or more;

(5) Dredger with bucket capacity greater than 4 cubic meters.

3 three-level qualification standards

3. 1 enterprise assets

The net assets are more than 8 million yuan.

3.2 Key personnel of the enterprise

(1) There shall be at least 5 first-class registered construction engineers specialized in port and waterway engineering.

(2) the technical person in charge has more than 5 years experience in technical management of engineering construction, and has the senior title of water transport engineering or the qualification of a first-class registered builder of water transport engineering; There are no less than 10 people with intermediate or above titles in the engineering sequence, among which the specialties of port and waterway engineering, machinery and electricity are complete.

(3) There shall be no less than 10 construction site management personnel with certificates, and there shall be complete personnel such as quality controller and safety officer.

(4) There shall be no less than 30 skilled workers (including the builder) who have passed the examination or training.

(5) The technical director (or registered construction engineer) shall preside over the completion of at least two engineering achievements required by the Class II and above standards of this category.

3.3 Technical equipment

Construction machinery and equipment are equipped with two of the following four items:

(1) piling boat;

(2) crane ship;

(3) Dredger with total installed power 1.200 kW;

(4) Dredger with bucket capacity greater than 2 cubic meters.

4 scope of contracted projects

4. 1 level 1 qualification

Can undertake all kinds of port and waterway engineering construction, including docks, breakwaters, revetments, cofferdams, yard roads and land structures, silos, docks, slipways, ship locks, ship lifts, underwater foundations and foundations, earthwork, offshore lighthouses, navigation marks, trestles, artificial islands and platforms, offshore wind power, coastal and offshore engineering, electromechanical installation of port loading and unloading equipment, electromechanical installation of navigation building equipment, rivers and seas.

4.2 Secondary qualification

Can undertake the following port waterway engineering construction, Including coastal docks below 50,000 tons and inland docks below 5000 tons, breakwaters below 7 meters in water depth, slipways and slipways below 50,000 tons, ship locks below 1000 tons and ship lifts below 300 tons, coastal waterway projects below 50,000 tons and inland rivers below 1 10,000 tons, dredging projects or land reclamation projects below 6 million cubic meters, and coastal areas of 280,000 square meters or 654.

Underwater reef blasting and reef cleaning projects, as well as roads and land structures, silos, underwater foundations and foundations, earthwork, navigation marks, trestles, coastal and offshore projects, electromechanical installation of port loading and unloading equipment, electromechanical installation of navigation building equipment, underwater excavation and obstacle removal and other corresponding projects.

4.3 Level III qualification

It can undertake 654.38+100000 tons of coastal and inland river wharves below 3,000 tons, breakwaters below 4 meters in water depth, wharf slipways and slipways below 654.38+100000 tons, ship locks below 300 tons and ship lifts below 50 tons, and coastal and inland rivers below 20,000 tons.

Waterway project under 500 tons, dredging project or land reclamation project under 3 million cubic meters, port yard project under 6.5438+0.2 million square meters in coastal areas or 70,000 square meters in inland areas, dike revetment project under 800 meters, underwater reef blasting and reef cleaning project under 40,000 cubic meters, and corresponding road and land structures, silos, underwater foundations and foundations, earthwork, navigation marks, trestle, coastal and offshore projects, and port loading and unloading equipment installation.

It's quick and efficient to find Nanjing Li Run to apply for a certificate.