1. How about AIA ceiling?
1, integrated ceiling is to make the ceiling module and electrical module into modular modules with standard specifications, and then integrate them when installing. Integrated ceiling is safe, green and energy-saving, with high comprehensive cost performance. Today, Bian Xiao will share with you the AIA integrated ceiling with good response.
2. AIA integrated ceiling company entered the research and development of integrated ceiling in 2003. In 2004, the first integrated ceiling came out, and in 2005, it won the national invention patent and was named AIA MSO integrated ceiling. AIA Integrated Ceiling Company has been exploring the heights that aesthetics, art and technology can't reach. AIA constantly takes the triangular balance of "technology, art and health" as the benchmark, and the suspended ceiling integrating technology, art and health is a good suspended ceiling.
Second, AIA ceiling installation steps
Installation step 1: Install six screws.
1, according to the measured size, screw the expansion pipe screw into the brick hole on the ceiling. Note that the height of the interlayer between the ceiling and the roof is not less than 25 cm. The rod must be perpendicular to the ceiling and fixed firmly, and the six screws should be parallel.
2. Punch holes in the ceiling at six points with an electric hammer (do not affect the installation of electrical appliances). Measure the distance from the top to the corner line, intercept the screw that is 8- 10cm shorter than the actual distance, while screwing a nut and an expansion screw (the screw is exposed by about 3 mm), and screw the nut on the other side, put on the main keel hanger and screw a nut to fix it.
3. Knock the joint between the expansion screw and the screw into the hole, connect the large ceiling with the screw with a diameter of 6mm, screw the nut into the screw, then insert the large hanger, screw the nut, and so on.
Installation Step 2: Install the keel
1. Compare the sizes of each hanger, clamp the main keel on the hanger, cut out the required size, and keep the main keel parallel after clamping.
2. Put the triangular hanger into the triangular keel and fix it on the main keel in turn. Before fixing the triangular keels, adjust the distance between the keels to 300mm ... Arrange the exhaust pipe of the range hood in front of the gusset plate. If you don't have a range hood, you don't need it
3. The specific method is: subtract 5mm from the installation length, and then cut off the required triangular keel. After the triangular hanger is inserted into the triangular keel, the triangular hanger is stuck on the main keel. Pay attention to the same triangular keel hanger stuck on the main keel, and the clamping direction should be opposite, so that it will not swing when the installation continues.
Step 3: Install the pinch plate.
1. First, insert the connector into the fixed triangular keel, cut out the required length and insert it into the other end of the connector, and connect it by plug.
2. Install the gusset. First, lift the film on the four sides of the pinch plate and install it in the direction of the arrow on the film. The installation of the first row of gusset plates is generally cut with a utility knife, and attention should be paid to beauty and symmetry, with the cutting opening facing the wall.
3. Fix the cut gusset plate on the triangular keel, put the cutting surface on the edge strip, pull out the corners of the edge strip and fix the gusset plate. Take this as an example to install the first row of gusset plates.
4. Control the spacing of gusset plates in the first row, so that the spacing of gusset plates is 0, the four corners are cruciform, and the height of gusset plates should be consistent. The installation quality of the first gusset plate directly determines the installation quality of the rear gusset plate.
The above is the information about AIA integrated ceiling compiled by Bian Xiao.