From September 1st to 2nd, the State Grid Corporation of China’s distribution network work site meeting was held in Xiamen, Fujian. The meeting summarized the company's distribution network planning, construction, operation and maintenance work in recent years, conducted an in-depth analysis of the current situation and existing problems faced by the distribution network, and comprehensively deployed the company's key tasks of strengthening the closed-loop management of the entire distribution network process.
The meeting pointed out that although the company's distribution network work has achieved remarkable results in recent years, the weakness of both ends is still prominent, and the standardization and leanness of the distribution network work urgently need to be improved. All units of the company's system must continuously improve the planning, design, construction management and operation and maintenance standardization systems, increase the intensity of distribution network construction and transformation, strengthen the closed-loop management of the entire distribution network process, and comprehensively improve the leanness and efficiency of distribution network planning, construction, operation and maintenance. The level of standardization will push the development of distribution network to a new level.
The meeting required that all units of the company's system should strengthen closed-loop management of the entire distribution network process and improve the level of distribution network planning and construction and operation, maintenance, and maintenance management. It is necessary to accelerate the construction of the distribution network planning system and further strengthen the distribution network planning and management; continuously improve the distribution network design and construction system standard system, comprehensively promote the construction of distribution network standardization, and further strengthen the distribution network infrastructure management; implement the equipment life cycle management requirements, deepen the distribution network Condition maintenance, live work, standardized emergency repair, actively promote the construction of distribution automation (intelligent), and further strengthen the standardized management of distribution network operation and maintenance; establish and improve employee training and assessment mechanisms, strengthen talent training, and further improve the quality of employees; coordinate and do The key tasks in the near future include ensuring the safe operation of the distribution network, preparing the distribution network for the summer peak, and ensuring power supply for the 18th National Congress of the Communist Party of China.
At the meeting, the development department, infrastructure department and transportation inspection department of the company's headquarters made special speeches; companies in Tianjin, Hebei, Shandong, Shanghai, Jiangsu, Zhejiang, Fujian and Liaoning made experience exchange speeches. Representatives at the conference visited the Xiamen Guanyinshan Business No. 1 10kV switching station and the Strait International Community Distribution Automation "Sanyao" demonstration station, which are the first to realize programmed operation in Fujian, and observed the construction and application of Xiamen's distribution automation on-site. Demonstration of results. It is understood that as one of the first four units to pass the company's practical acceptance, Xiamen's distribution automation system has the characteristics of wide coverage, strong practicability and high reliability, and has strong demonstration significance.
The company’s chief engineer Zhang Qiping attended the meeting and delivered a speech. Heads of relevant departments at the company's headquarters, 9 provinces (cities) including Beijing, Tianjin, Shandong, Shanghai, Zhejiang, Fujian, Hubei, Hunan, and Chongqing respectively undertake the construction of demonstration projects for distribution networks in key cities of the company and the pilot tasks of cable uninterrupted operation. Responsible comrades of electric power companies, main persons in charge of biotechnology (operation inspection) departments and development and infrastructure departments of electric power companies in various provinces (autonomous regions and municipalities), relevant persons in charge of China Electric Power Research Institute, State Grid Electric Power Research Institute, and State Grid Economic Research Institute Comrades attend meetings and observe on-site.