What are the conditions for establishing a project?

Generally, all government projects taken over must be approved, and the National Development and Reform Commission mainly adopts different ways to handle project approval according to different projects.

1. What materials are needed for the project?

1, and the information required for project establishment is as follows:

(1) Preliminary idea of the project;

(2) Technology and source, design patent standard, process description and process flow chart, if there are special requirements for the production environment, please explain;

(3) Project factory;

(four) the audit report of the enterprise in the past three years;

(5) The scale of the number of people to be increased in the project, the department to be set up and the salary level, and the estimated total salary of the project;

(6) Provide approximate values of the company's operating expenses and management expenses. Income after deducting wages in the past three years and its proportion;

(7) VAT, income tax rate, other subsidies and preferential items enjoyed by the company.

2. Legal basis: Article 7 of the Building Law of People's Republic of China (PRC).

Before the construction project starts, the construction unit shall, in accordance with the relevant provisions of the state, apply to the construction administrative department of the people's government at or above the county level where the project is located for a construction permit; However, except for small projects below the quota determined by the administrative department of construction in the State Council.

According to the authority and procedures stipulated by the State Council, the construction project that has approved the commencement report will no longer receive the construction permit.

Second, what is the project development process?

The project development process is as follows:

1. Analysis and determination of project development purpose. After determining the development project, software developers need to discuss with the demander to determine the demander's demand for software development and realize its goals and specific functions. And determine whether it can be achieved;

2. Requirements analysis, which is the stage to determine the specific ideas of normal software development;

3. Design: Software design should design the framework structure, functional modules and database of the software system according to the results of the previous stage of software functional requirements analysis;

4, programming, each stage in the process of software development is the basis of the next stage of implementation;

5. Software testing: After the client software is realized by programming code according to the design requirements, that is, after the software program is completed, it is necessary to test the overall architecture, function, unit, assembly and system of the written program to test the correctness of the program writing and meet the customer's needs and the adequacy of functions, so as to determine whether the software meets the development requirements;

6. Software delivery: The software development process completes the software development through the above core links. Next, after the software development meets the customer's requirements, the developer delivers the software system to the customer, and delivers the software installation program, data dictionary of the database and other products to the customer;

7. Acceptance: The user receives the software development results delivered by the developer, carries out actual operation and test operation, and accepts the developed software after reaching satisfactory results;

8. Maintaining and customizing software usually requires providing after-sales service, maintaining the software regularly, or modifying the application software program according to the new needs of users, so as to continuously meet the actual needs of customers.

I hope the above content can help you. Please consult a professional lawyer if you have any other questions.

Legal basis: Interim Measures for the Approval of Enterprise Investment Projects

Article 4 Measures for the approval of foreign-invested projects and overseas-invested projects shall be formulated separately, and projects invested and constructed by other enterprises in China shall be implemented with reference to these Measures.

Article 5 A project applicant shall submit a project application report in quintuplicate to the project approval authority. The project application report shall be compiled by an institution with corresponding engineering consulting qualification, and the project application report of a project approved by the investment department of the State Council shall be compiled by an institution with Grade A engineering consulting qualification.

Article 6 The project application report mainly includes the following contents: (1) Information of the project applicant. (2) The situation of the proposed project. (3) Construction land and related planning. (4) Analysis of resource utilization and energy consumption. (5) Eco-environmental impact analysis. (6) Analysis of economic and social effects.