How to make building materials at first?

I combine books, online materials and on-site materials, but the regulations in each province are different, including the needs of forms, names and materials. In fact, if you really want to learn, just go to the bookstore to buy books. Books are our most basic way of learning.

1. Construction site management and data collection

Composition of site construction management:

Construction management is divided into three stages: 1, construction preparation 2, construction stage 3 and completion acceptance.

(a) the construction preparation:

1, technical preparation contract, project budget, construction organization design, and blue prints.the design.

2, site preparation, engineering positioning, pay-off and review, construction permit declaration, quality supervision declaration, temporary occupation of roads declaration, site civilized construction enclosure, overlay construction, materials, machines and tools organization comes into play.

3, the organization is ready to organize labor comes into play.

(1): Determine the construction, working procedure and overlapping sequence.

(2): Organize the balanced flow in sections and submit the operation plan.

( 3); Organize new workers to carry out safety education and assessment.

(II): Construction stage:

1: quality control of construction organization design, supervision and implementation of system measures, specifications, procedures and process standards, implementation of quality inspection and quality acceptance standards, inspection and acceptance of process handover, inspection and acceptance of concealed works, inspection and acceptance of water test for leakage prevention, change of project visa, quality control of materials entering the site, strengthening construction review, and organizing regular and irregular quality inspection of engineering quality.

2. Safety control Implement the "prevention first" safety production policy, control five major safety factors (people, materials, machinery, methods and environment), including: construction work arrangement, electricity consumption and fire safety, implement graded safety production responsibility system, implement safety production reward and punishment system and measures, implement safety production inspection system, and organize safety technical disclosure and safety education and study.

3. Schedule control According to the contract time limit for a project and the construction organization design, work out the construction schedule operation plan in stages, check the progress in time, adjust the plan in time, and coordinate the cooperation between civil engineering and professional construction.

4. Cost control: make economic visas in time, take measures to reduce costs, optimize progress, optimize labor force, strictly control the quantity and quality of materials entering the site, implement material distribution quota acquisition, strengthen construction setting-out audit, control quality in advance, reduce rework losses afterwards, master economic claims and visa claims skills, and reduce economic losses.

5. Civilized site capacity management

6. On-site materials and tools management includes: production tools (uniform distribution and recycling), on-site materials (classified stacking and coloring in the construction layout) and reusable materials (classified stacking).

(III): Completion acceptance stage

1: The compilation of technical data includes: construction log, change items, construction acceptance records, material test reports and quality inspection acceptance records. Data should be recorded, accumulated and sorted in time. (The technical data is the basis for Party A's inspection and settlement, which cannot be ignored. )

2. Check and accept the completed project, organize the acceptance and collection of the completed project, check and accept the imperfect project hand and tail left by the project before acceptance, and handle it in time to create conditions for the completion acceptance.

3. The project completion acceptance record (Interim Measures for the Administration of Completion Acceptance Record of Housing Construction Projects and Municipal Infrastructure Projects) stipulates that the construction unit shall submit the following materials when handling the project completion acceptance record:

(1): record form of project completion acceptance (record form of housing construction project and municipal infrastructure project completion acceptance) (II): report of project completion acceptance.

(3): Approval documents or permission documents issued by planning, bus fire protection and environmental protection departments according to laws and administrative regulations.

(4): the project quality guarantee signed by the construction unit;

(5): Other documents required by laws and regulations;

(6): Commercial housing should also submit residential quality guarantee and residential instruction manual.

4. Acceptance of completed projects

Second, the unit engineering construction technical data management

Section 1 General principles

The function of technical data of unit project construction;

1: It is an important basis to reflect the engineering quality and work quality.

2. It is a true record of the whole construction process of the unit project.

3. This is an important archive for the maintenance, expansion and update of the unit project in the future.

4. The unified management of technical data of construction enterprises is beneficial to the engineering quality inspection and filing.

Section 2 Classification of Construction Technical Data Content

Construction technical data are divided into seven categories according to their nature:

The first category: the necessary documents for the statutory construction application procedures of construction projects;

The second category: comprehensive management information;

Category III: Engineering quality control materials include acceptance materials, construction management materials, product quality certification documents, inspection reports, construction records and inspection reports.

The fourth category: engineering safety and function inspection data and sampling records of main functions;

Category V: Quality acceptance records of inspection lots;

Category VI: building logs;

Category VII: as-built drawings;

Requirements for composing test papers of engineering technical data

Principle of composing papers: "The composing of construction technical data should follow the natural formation law of engineering documents, and keep the systematic connection of document contents in the documents, so as to facilitate the protection and utilization of archives. When typesetting papers, arrange them according to documents first and then according to drawings.

1: catalogue of construction technical data:

(1) general directory

(2) Legal construction procedure documents in the early stage of project construction;

(3) Comprehensive management information of construction projects;

(4) Foundation and foundation engineering

5] the main structure engineering;

[6] Architectural decoration engineering;

Once the building roof engineering;

Being comprehensive management information of construction equipment installation project;

Levies building water supply, drainage and heating engineering;

⑽ Building electrical engineering;

⑾ Ventilation and air conditioning engineering;

⑿ elevator installation project;

[13] intelligent building;

[14] Completion acceptance data;

⒂ as-built drawing;

2. The typesetting order of the paper: usually cover, catalogue, literature, engineering photos and back cover.

3. Quality requirements for writing papers: the contents of the archived documents must be true, accurate and complete with signatures, and the written materials must be durable and clear. It is not allowed to write with faded village materials such as pencils, red pure blue ink and ballpoint pens. If it is carbon paper, the copy (where the original should be stored) should be clear and firm, and can be preserved for a long time.

Construction technical data is divided into two parts:

(1): documents in the preparation stage of the project (including 24 documents and materials provided by the construction unit according to the project)

1: project application report and reply

2. Feasibility study report and reply

3. Environmental impact report or environmental impact report form or environmental impact registration form

4. Annual plan of fixed assets investment projects

5. Approval letter for construction land

6. State-owned land use certificate and attached drawings

7. Demolition compensation and resettlement agreement

8: Construction Land Planning Permit and Attached Drawings

9. Engineering geological survey report

10: Hydrogeological investigation report

1 1: construction engineering survey record book

12: planning and design documents

13: preliminary design, technical design drawings and descriptions

14: approval documents or agreements of relevant administrative departments (civil air defense, environmental protection, fire protection, cultural relics, etc. )

15: review comments on construction drawings and design documents

16: survey and design contract and bid-winning notice

17: construction contract and bid-winning notice

18: supervision entrustment contract and bid-winning notice

19: construction project planning permit

20: Construction Project Application Review Report

2 1: building construction permit

22: Engineering Quality and Safety Supervision Registration Form

23: Qualification documents of all responsible subjects and subcontractors

24: Elevator Installation Supervision Registration Form

(2) the unit engineering construction technical data:

Delta unit engineering construction technical data is divided into seven categories, including:

Comprehensive management information of construction projects; Foundation and foundation engineering; Main structural engineering; Architectural decoration engineering; Building roof engineering; Completion acceptance data; As-built drawing;

Delta division engineering technical data set file material content includes:

(1) engineering quality control data-acceptance record

(2) Engineering quality control data-construction technology management data

(3) Engineering quality control data-product quality certificate, the content of which must be filled in completely, and shall not be omitted or altered at will. Try to use the original. If it is a copy, it should also indicate the place where the original is stored, affix the official seal of the place where the original is stored and the signature of the agent, and indicate the date. The construction unit must indicate the number of its representatives.

(4) Engineering quality control data-inspection report

(5) Engineering quality control data-construction records

For important construction sites (such as basement floor, structural transfer floor, roof and other parts of the steel disciplines), concealed works acceptance should be attended and signed by design unit personnel. Engineering safety and function inspection data and main function spot check records sub-project quality acceptance records

First, the comprehensive management information of construction projects includes:

(1) application report for commencement of unit project

(2) the construction site quality management inspection records

(3) the unit project construction organization design

(4) When the unit project coordinate positioning measurement records the unit project lofting, the representative of the supervision (or construction) unit must be present, and the planning fixed-point documents of the planning department should be carefully studied. The requirements of the project in the document must be strictly implemented, and finally it must be recognized by the construction and supervision (or construction) in the measurement record. The project baseline review shall be attended by representatives of the construction unit and the supervision unit (or the construction unit), who shall sign the review opinions, signatures and official seals.

(5) Engineering quality accident report

(6) Notice of Stop (Resume) of Engineering Quality Accident

(7) Engineering quality accident handling report

(8) Acceptance handover record in the middle of the project

(9) Witnesses can perform their duties only after they have obtained a witness certificate through training and examination. The witness certificate shall be provided by the supervision unit to the librarians of the construction unit.

(10) project summary (1 1) civil engineering construction log (separate sheet)

Two. Foundation and foundation engineering (including: (1): pile foundation, natural foundation, foundation treatment, etc. (2) underground structure engineering) documents and materials include:

(1) engineering quality control data-acceptance record

(2) Engineering quality control data-construction technology management data

(3) Engineering quality control data-product quality certificate.

(4) Engineering quality control data-inspection report

(5) Engineering quality control data-construction records

6. Engineering safety and function inspection data and main function spot check records.

All landowners subdivisional work quality acceptance record

Third, the main structure engineering (1: reinforced concrete engineering; 2. Steel structure engineering; 3. Brick-concrete structure engineering) The contents of the documents include:

(1) engineering quality control data-acceptance record

(2) Engineering quality control data-construction technology management data

(3) Engineering quality control data-product quality certificate.

(4) Engineering quality control data-inspection report

(5) Engineering quality control data-construction records

6. Engineering safety and function inspection data and main function spot check records.

All landowners subdivisional work quality acceptance record

Today the engineering quality control data-test report.

Four. Architectural decoration engineering (1: architectural decoration engineering; 2. Curtain wall project; Curtain wall engineering, curtain wall with a total area of more than 200m2 should be tested for three properties (air permeability, rainwater leakage and wind pressure deformation capacity). The contents of documents and materials include:

(1) engineering quality control data-acceptance record

(2) Engineering quality control data-construction technology management data

(3) Engineering quality control data-product quality certificate.

(4) Engineering quality control data-inspection report

Marble, granite and other interior decoration materials must provide the test report of radioactivity index of building materials.

(5) Engineering quality control data-construction records

6. Engineering safety and function inspection data and main function spot check records.

All landowners subdivisional work quality acceptance record

Today the engineering quality control data-test report.

Five, building roof engineering documents include:

(1) engineering quality control data-acceptance record

(2) Engineering quality control data-construction technology management data

(3) Engineering quality control data-product quality certificate.

(4) Engineering quality control data-inspection report

(5) Engineering quality control data-construction records

6. Engineering safety and function inspection data and main function spot check records.

All landowners subdivisional work quality acceptance record

Six, the completion acceptance data; (Archived by the construction unit according to the unit project) Documents and materials:

(1): application for project quality acceptance

(2): Verification record of engineering quality control data of the unit (sub-unit) (Table G.0. 1-2)

(3): Verification of engineering safety and function test data of the unit (sub-unit) and records of spot check of main functions (table G.0. 1-3).

(4): Inspection record of visual quality of the unit (sub-unit) project (Table G.0. 1-4)

(5): Project quality evaluation report

(6): Quality inspection report of measurement documents

(7): Quality inspection report of design documents

(8): Safety evaluation of unit project construction.

(9): Registration Form for Quality Acceptance of Elevator Installation Division

(10): fire control acceptance document or allowed document.

(1 1): gas engineering acceptance document.

(12): quality warranty of construction project

(13): residential quality guarantee and residential instruction manual for commercial housing.

(14): records and minutes of project quality acceptance of the unit (sub-unit).

(15): opinions on quality supervision and acceptance of construction projects.

(16): approval document for planning and acceptance of construction project.

(17): environmental protection acceptance document or allowed document.

(18): Letter of Acceptance of Construction Project Completion Acceptance Document

(19): completion acceptance report of construction project

(20): Record Form for Completion Acceptance of Housing Construction Project and Municipal Infrastructure Project

Seven, as-built drawings (by the construction unit according to the unit project * archive)

(1): building completion drawing (2): structure completion drawing (3): steel structure completion drawing (4): curtain wall completion drawing (5): secondary decoration completion drawing (6): water supply and drainage and heating completion drawing (7): building electrical engineering completion drawing (8): intelligent building completion drawing (9): ventilation and air conditioning.

Professional engineering construction technical documents: comprehensive management records of building equipment installation project, building water supply and drainage and heating project.

Building electrical engineering intelligent building engineering ventilation and air conditioning engineering elevator engineering

Third, the preparation of construction organization design:

Construction organization design is a comprehensive technical and economic document to guide construction preparation and organization, and it is also a guide to guide on-site construction. The compilation of construction organization design must make overall planning, organize construction scientifically, establish normal production order, make full use of space, strive for time, adopt advanced construction technology, and achieve the best economic effect with the least manpower and financial resources, so as to build high-quality projects. Construction organization design is an important comprehensive technical management document of construction technology management that should be compiled before construction, and the document can take effect only after it is signed by the person in charge of technical examination and approval.

The content of the unit project construction organization design:

Table of Contents I, Project Overview II, Construction Management Framework III, General Construction Schedule IV, Construction Layout 1: Construction Layout 2, Construction Water Layout 3, Construction Electricity Layout 5, Main Construction Settings and Equipment Configuration VI, Quantity and Quantity Analysis of Major Projects VII, Main Resources and Plans VIII, Construction Methods (1) Construction Sequence (2) Foundation Project (2) Erection of external scaffolding and safety protection X. Heavy-duty direct transport XI. Verticality control of buildings. Quality and technical measures XIII. Safety technical measures 14. After a whole year

Content of construction scheme:

1, general situation and characteristics of the project 2, construction procedures and methods 3, construction progress plan 4, construction layout 5, labor, components, machines and tools, material plan 6, quality assurance measures 7, safety measures.

Four: fill in the construction log and construction records.

(A) the key information of site construction-construction log

Construction log is a comprehensive record of construction activities (including construction organization and management and construction technology) and site changes in the whole construction stage of a building project. It is also a memorandum for construction technicians to deal with construction problems and a basic material for summing up construction management experience.

Main contents: 1, actual climate of the day; 2, the construction image progress; 3. Record and use of resources entering and leaving the site

4. Send and receive related engineering technical documents and summarize the contents of the documents; 5. Summary of the decisions of the production meeting of the engineering technology meeting; 6, major technical issues, safety issues and the implementation of the decision; 7. On-site construction records; Technical disclosure; 8. Technical safety training and education records (such as safety education for workers and safety study for at least four hours every month).

(II) Contents and requirements of construction records

On-site construction technicians must fill in the form item by item in strict accordance with the regulations, and it will not take effect until it is approved by the supervisor, the construction unit and other relevant personnel.

Verb (abbreviation of verb) Regulations and requirements of data management

Fill in the quality requirements of construction technical data:

1. The archived engineering documents shall be original. 2. The content and depth of the engineering documents must conform to the technical specifications and standard procedures of the relevant national engineering survey, design, construction and supervision. 3, the content of the engineering documents must be true, accurate and consistent with the engineering practice. 4, engineering documents should use durable writing materials, such as carbon ink, shall not use easy to fade writing materials, such as red ink, pure blue ink, ballpoint pen, carbon paper, pencil, etc. 5. The engineering documents shall be legible, with clear drawings, neat charts and complete signature and seal procedures. 6. The format and size of written materials in engineering documents should be A4(297mm ×2 10mm), and the drawings should adopt national standard sheets. 7. Paper for engineering documents should have high toughness and durability and can be preserved for a long time. Drawings are generally blueprints, and as-built drawings should be new blueprints. Computer graphics must be clear, and copies of computer graphics are not allowed. 8. All "as-built drawings" shall be stamped with the seal of "as-built drawings". The basic contents of the chapter "as-built drawings" should include: the words "as-built drawings", the construction unit, the preparer, the auditor, the technical director, the preparation date, the supervision unit, the site supervisor and the person in charge. The size of the "as-built drawing" chapter is 50 mm× 80 mm The "as-built drawing" chapter shall be made of indelible red inkpad and shall cover the space above the icon bar. 9. If the construction drawing is used to redraw the as-built drawing, the basis for change and modification must be indicated. When the structure, technology and layout of the construction drawing are significantly changed, or the changed part exceeds 1/3 of the drawing, the as-built drawing shall be redrawn. The change stamp can take the following form: (the size is 35mm× 15mm) 10. Engineering drawings with different formats should be folded into A4 format (297mm ×2 10mm) uniformly, folded horizontally according to accordion style, and folded vertically clockwise to reveal icons. (Folding method of copying drawing according to technology (GB/ 10609.3-89)

Brief introduction to the unified standard of construction quality acceptance of intransitive verbs

The construction project is divided into 9 sub-projects: ① foundation and foundation engineering ② main structure ③ architectural decoration ④ building roof ⑧ building water supply and drainage and heating engineering ⑧ building electrical engineering ⑧ intelligent building ⑧ ventilation and air conditioning engineering ⑨ elevator installation engineering.

Construction engineering quality inspection is divided into: unit project (sub-unit project), division project (sub-division project) and sub-project inspection lot.

The quality acceptance of inspection lots, subdivisional works, divisional works and unit works shall be stipulated in procedures and organization: (1) The quality acceptance record of inspection lots shall be filled in by the professional quality inspector of the construction project, and the supervision engineer (the professional technical director of the construction unit) shall organize the professional quality inspector of the project for acceptance. (2) The quality of subdivisional work shall be checked and accepted by the supervision engineer (technical director of the project of the construction unit). (3) The project quality of the division (sub-division) shall be checked and accepted by the chief supervision engineer (technical director of the project of the construction unit). (4) When the unit (sub-unit) accepts the project, the construction unit shall fill in the "Completion Acceptance Record of the Project Quality of the Unit (sub-unit)", the acceptance conclusion shall be filled in by the supervision (construction) unit, and the comprehensive acceptance conclusion shall be agreed by all parties involved in the acceptance and filled in by the construction unit to assess whether the project quality meets the design and specification requirements and the overall quality level.

Unit project completion acceptance procedures:

The project completion acceptance shall be conducted by relevant experts such as survey, design, construction and supervision organized by the construction unit. (1) After the completion of the unit project, the construction unit will organize the inspection and evaluation by itself, and make a completion acceptance announcement to the construction unit. (2) After the construction unit receives the project acceptance report, the person in charge of the construction unit (project) shall organize the person in charge of the construction (subcontractor), design, supervision and other units (projects) to carry out the project acceptance of the unit (sub-unit).

Check the proprietary concepts of civil engineering specialty. If a sectional project needs multiple inspections and evaluations, then each inspection and evaluation is called an inspection lot. According to industry regulations, the inspection parts of each inspection lot must be exactly the same. The inspection lot only does inspection, not evaluation.

The inspection lot is the smallest unit of project acceptance, and it is the basis of quality acceptance of sub-projects and even the whole construction project; The quality of inspection lot shall be accepted according to the master control project and general project; The quality of the inspection lot mainly depends on the inspection results of the main control project and the general project; The inspection lot can be divided into layers, construction sections and deformation joints according to the needs of construction, quality control and professional acceptance (Article 4.0.6).