What should I do after the notice of granting patent right and going through registration formalities is issued?

Go through the registration formalities on schedule and pay the authorized registration fee, annual fee, stamp duty and related fees to the state. Then you can get the license in about a month and a half. Patent is the abbreviation of patent right, which refers to the patent right enjoyed by the patentee for invention and creation.

Legal analysis

If the flow rate is far below the minimum flow rate to ensure accuracy, there will be no output (such as vortex flowmeter) or the output signal will be cut off as a small signal (such as differential pressure flowmeter), which is unfavorable and unfair to suppliers. In order to prevent the loss of benefits, for a specific set of thermal energy metering equipment, the supply and demand sides often agree that a certain flow value is the "agreed lower limit flow" according to the flow measurement range and the achievable range, and agree that if the actual flow is less than the agreed value, it will be charged according to the lower limit flow. The metrological administrative department of the people's government at or above the county level may set up metrological verification institutions according to needs, or authorize metrological verification institutions of other units to perform compulsory verification and other verification and testing tasks. Personnel who perform the verification and testing tasks specified in the preceding paragraph must pass the examination. This function is usually realized in the flow display instrument. The metrological administrative department of the local people's government at or above the county level shall, according to the needs of the local area, establish public standard instruments of measurement, which shall be used after passing the examination presided over by the metrological administrative department of the people's government at a higher level. Enterprises and institutions may, as required, establish standards of measurement for their own use, and the highest standards of measurement shall be used after passing the examination presided over by the metrological administrative department of the relevant people's government. Metrological verification shall be carried out on site in accordance with the principle of economy and rationality. Metrological verification must be carried out in accordance with the national metrological verification system table. The national metrological verification system table shall be formulated by the metrological administrative department of the State Council.

legal ground

patent law of the people's republic of china

Article 34 After receiving an application for a patent for invention, the administrative department for patent in the State Council, after preliminary examination, finds that it conforms to the provisions of this Law, and shall publish it after 18 months from the date of filing. The patent administration department of the State Council may publish its application at an early date upon the request of the applicant.

Article 36 When requesting substantive examination, an applicant for a patent for invention shall submit reference materials related to his invention before the date of application. Where an application for a patent for invention is filed in a foreign country, the patent administration department of the State Council may require the applicant to submit the information retrieved during the examination of his application in that country or the information on the examination results within a specified time limit; If the application is not submitted within the time limit without justifiable reasons, the application shall be deemed to have been withdrawn.