Han Shi modular gypsum board ceiling greatly shortens the decoration construction time. Through the brand-new production mode in which professional workers cut gypsum board into several finished modules by standard technology in standard chemical plants, and then assembled and formed on the construction site, it shows great advantages in materials entering the site, ceiling installation, collaborative construction, etc., and shortens the overall working hours of ceiling decoration to the greatest extent. The installation speed is fast, and it can be done in 1-2 days at the earliest. After the installation, you can check in directly without waiting, saving time, effort and worry.
"Han Shi modular gypsum board ceiling" abandoned the traditional wooden base structure and adopted all-light steel keel structure. There is no artificial board and adhesive in the installation process, which will not release harmful gases such as formaldehyde and create a real green home environment for you. To provide a safe living space for you and your family, convenient installation also enables the owner to move into a new home as soon as possible.