Petrochemical engineering construction general contracting qualifications are divided into special grade, first grade, second grade and third grade.
Special qualification standards:
1. Enterprise credit ability
1. The registered capital of the enterprise is more than 300 million yuan.
2. The company’s net assets are more than 360 million yuan.
3. The construction industry business tax paid by enterprises in the past three years has been more than 50 million yuan.
4. Corporate bank credit lines have been above 500 million yuan in the past three years.
2. Requirements for the company’s main managers and professional and technical personnel
1. The company manager has more than 10 years of experience in engineering management.
2. The technical person in charge has more than 15 years of experience in engineering technology management, and has a senior professional title in engineering and a first-class registered construction engineer or registered engineer qualification; he has presided over the completion of two or more construction projects Contracting technical work of representative projects required by Class A qualifications or representative projects required by Class A design qualifications or general contracting projects with a contract value of more than 200 million yuan.
3. The financial person in charge has the title of senior accountant and the qualification of certified public accountant.
4. The company has more than 50 registered first-level construction engineers (first-level project managers).
5. The enterprise has professional and technical personnel required by the industry engineering design Class A qualification standards related to this category.
3. Level of scientific and technological progress
1. The enterprise has an enterprise technology center at the provincial and ministerial level (or equivalent to the provincial and ministerial level) and above.
2. The average expenditure on scientific and technological activities of enterprises in the past three years has reached more than 0.5% of turnover.
3. The enterprise has more than 3 national-level construction methods; in the past five years, it has more than 3 patents related to engineering construction that can promote the technological progress of the enterprise, and a total of more than 8 valid patents, at least one of which Invention patent.
4. The company has won national scientific and technological progress awards or edited national or industry standards for engineering construction in the past ten years.
5. The enterprise has established an internal LAN or management information platform to realize the networking of internal offices, information release, and data exchange; it has established and opened an external enterprise website; it has used a comprehensive project management information system and Personnel management system and engineering design related software realize file management and design document management.
4. Representative project performance
Have undertaken the general engineering contracting, general construction contracting or main project contracting of more than 3 large-scale petrochemical projects in the past 5 years, and the project quality is qualified.
First-level qualification standards:
1. Corporate assets
Net assets of more than 100 million yuan.
2. Key personnel of the enterprise
(1) There should be no less than 15 first-level registered construction engineers majoring in mechanical and electrical engineering.
(2) The technical person in charge has more than 10 years of experience in engineering construction technology management, and has a senior professional title in the engineering sequence; there are no less than 80 people with intermediate professional titles or above in the engineering sequence, including petrochemical industry (or ( Oil and gas fields) ground construction or oil and gas storage and transportation or petroleum refining or chemical engineering or chemical processes or chemical equipment), structural, electrical, mechanical and automatic control and other majors.
(3) There should be no less than 25 construction site management personnel holding job certificates, and there should be complete quality personnel, safety personnel and other personnel.
(4) There shall be no less than 150 skilled workers at intermediate level or above who have passed the assessment or training.
3. Enterprise project performance
In the past five years, it has undertaken the construction of Category 1 of the following 2 categories, and the project quality is qualified.
(1) 3 medium-sized petrochemical engineering construction general contracting or main project contracting with a single contract value of more than 100 million yuan;
(2) Single contract value of more than 35 million yuan 3 inspection and maintenance projects for the main petrochemical equipment (may include ancillary facilities).
Second-level qualification standards:
1. Corporate assets
Net assets of more than 40 million yuan.
2. Key personnel of the enterprise
(1) There should be no less than 12 registered construction engineers specializing in mechanical and electrical engineering.
(2) The technical person in charge has more than 8 years of experience in engineering construction technology management, and has a senior professional title in engineering or a first-level registered construction engineer qualification in mechanical and electrical engineering; personnel with intermediate professional titles or above in engineering sequence are not allowed Less than 40 people, including petrochemical (or (oil and gas field) ground construction or oil and gas storage and transportation or petroleum refining or chemical engineering or chemical process or chemical equipment), structure, electrical, mechanical and automatic control majors.
(3) There are no less than 15 construction site management personnel holding job certificates, and there are complete quality personnel, safety personnel and other personnel.
(4) There shall be no less than 75 skilled workers at intermediate level or above who have passed the assessment or training.
3. Enterprise project performance
In the past five years, it has undertaken the construction of Category 1 of the following 2 categories, and the project quality is qualified.
(1) Petrochemical engineering construction general contracting or main project contracting for 3 projects with a single contract value of more than 30 million yuan;
(2) Petroleum with a single contract value of more than 25 million yuan 3 inspection and maintenance projects for the main chemical equipment (may include ancillary facilities).
Level 3 qualification standards:
1. Corporate assets
Net assets of more than 10 million yuan.
2. Key personnel of the enterprise
(1) There should be no less than 5 registered construction engineers specializing in mechanical and electrical engineering.
(2) The technical person in charge has more than 5 years of experience in engineering construction technology management, and has an intermediate professional title or above in engineering sequence or a registered construction engineer qualification in mechanical and electrical engineering; there are many people with intermediate professional titles in engineering sequence or above There are more than 10 people, and the company has complete majors in petrochemical industry (or (oil and gas field) ground construction or oil and gas storage and transportation or oil refining or chemical engineering or chemical process or chemical equipment), structure, electrical, mechanical and automatic control.
(3) There are no less than 8 construction site management personnel holding job certificates, and there are complete quality personnel, safety personnel and other personnel.
(4) There should be no less than 30 skilled workers at intermediate level or above who have passed the assessment or training.
(5) The technical person in charge (or registered construction engineer) has presided over no less than 2 projects that have completed the requirements of Level 2 or above for this category of qualifications.
Scope of contracted projects:
Special-level enterprises:
1. Enterprises that have obtained special-level qualifications for general construction contracting can undertake general contracting and design of projects of all levels in this category and carry out general engineering contracting and project management business;
2. Obtain any one special-level construction general contracting qualification and two of them in the majors of housing construction, highways, railways, municipal utilities, ports and waterways, water conservancy and hydropower, etc. With the first-level construction general contracting qualification, you can undertake the general construction contracting, general engineering contracting and project management business of the above-mentioned professional projects, and carry out construction drawing design business with corresponding design leading professionals.
3. Those who have obtained any one of the special-grade construction general contracting qualifications and two of the first-class construction general contracting qualifications in the majors of housing construction, mining, smelting, petrochemical industry, electric power, etc. can undertake the above-mentioned professional projects. It provides general construction contracting, general engineering contracting and project management services, as well as construction drawing design services with corresponding design leading professionals.
4. Enterprises with special qualifications are limited to housing construction projects with a single contract value of more than 60 million yuan.
First-level enterprises: can undertake the construction, inspection and maintenance of various types of petrochemical projects.
Second-level enterprises: can undertake the construction of non-large-scale petrochemical projects and the inspection and maintenance of various types of petrochemical projects.
Third-level enterprises: can undertake the construction of petrochemical projects other than large and medium-sized with a single contract value of less than 35 million yuan, as well as the inspection and maintenance of petrochemical projects other than large-scale.
Note: 1. Petrochemical engineering refers to the main projects such as oil and gas field surface, oil and gas storage and transportation (pipelines, storage warehouses, etc.), petrochemical industry, chemical industry, coal chemical industry, supporting projects and production auxiliary auxiliary projects.
2. Classification standards for large and medium-sized petrochemical projects:
Large-scale petrochemical projects refer to:
(1) Production of more than 300,000 tons/year Capable oil (gas) field main supporting construction projects;
(2) Gas treatment projects of more than 500,000 cubic meters/day;
(3) More than 3 million tons/year Crude oil, refined oil, gas transmission of more than 8 billion cubic meters per year and other pipeline transportation projects and supporting construction projects;
(4) Crude oil with a single tank of more than 100,000 cubic meters and a total storage capacity of more than 300,000 cubic meters Storage warehouses: refined oil depots with a single tank of more than 20,000 cubic meters and a total storage capacity of more than 80,000 cubic meters; natural gas storages with a single tank of more than 5,000 cubic meters and a total storage capacity of more than 15,000 cubic meters; single tanks of more than 400 cubic meters with a total storage capacity Liquefied gas and light hydrocarbon storages with a capacity of more than 2,000 cubic meters, liquefied natural gas storages with a single tank of more than 30,000 cubic meters and a total storage capacity of more than 120,000 cubic meters, underground gas storages with a single tank of more than 500 million cubic meters, and above Supporting construction projects of the reservoir;
(5) Refining projects with an annual capacity of more than 8 million tons, or supporting atmospheric and vacuum, desulfurization, catalysis, reforming, hydrogen production, hydrogenation, gas separation, Coking and other production equipment and related public works and auxiliary facilities;
(6) Ethylene projects of more than 600,000 tons/year, or paraxylene (PX), methanol, and purified terephthalic acid supporting them (PTA), butadiene, caprolactam, ethylene glycol, styrene, acetic acid, vinyl acetate, ethylene oxide/ethylene glycol (EO/EG), butanol, polyester, polyethylene, polypropylene, ABS and other production devices and related public works and auxiliary facilities;
(7) Synthetic ammonia projects of more than 300,000 tons/year or corresponding main production devices;
(8) 240,000 tons /year or above ammonium phosphate project or corresponding main production equipment;
(9) 320,000 tons/year or above sulfuric acid project or corresponding main production equipment
(10) 500,000 tons Soda ash projects with more than 100,000 tons/year, caustic soda projects with more than 100,000 tons/year, or corresponding main production devices; (11) Synthetic rubber, synthetic resins, plastics, and chemical fiber projects with more than 40,000 tons/year, or corresponding main production equipment Main production equipment;
(12) Organic raw materials, dyes, intermediates, pesticides, auxiliaries, reagents and other projects or corresponding main production equipment with a project investment of more than 600 million yuan;
(13) Tire engineering or corresponding main production equipment of more than 300,000 sets/year;
(14) Coal gasification of more than 1 billion standard cubic meters/year, and more than 2 billion cubic meters/year Coal chemical projects such as coal-to-natural gas, coal-to-methanol of more than 600,000 tons/year, coal-to-liquids of more than 1 million tons/year, coal-based olefins of more than 200,000 tons/year, or corresponding main production devices.
Medium-sized petrochemical projects refer to the following projects below the scale of large-scale petrochemical projects:
(1) Main supporting facilities for oil (gas) fields with a production capacity of more than 100,000 tons/year Construction projects;
(2) Gas treatment projects of more than 200,000 cubic meters/day;
(3) More than 1 million tons/year of crude oil and refined oil, 2 billion cubic meters/ Pipeline transportation projects and supporting construction projects such as gas transmission and above;
(4) Crude oil storage warehouses with a single tank of more than 50,000 cubic meters and a total storage capacity of more than 100,000 cubic meters, and a single tank of more than 5,000 cubic meters , product oil depots with a total storage capacity of more than 30,000 cubic meters, natural gas storages with a single tank of more than 2,000 cubic meters and a total storage capacity of more than 10,000 cubic meters, liquefied gas and light hydrocarbons with a single tank of more than 200 cubic meters and a total storage capacity of more than 1,000 cubic meters. Storage warehouses, liquefied natural gas storages with a single tank of more than 20,000 cubic meters and a total storage capacity of more than 60,000 cubic meters, underground gas storages with a single tank of more than 100 million cubic meters, and supporting construction projects for the above storages;
(5) Refining projects with an annual capacity of more than 5 million tons, or supporting production equipment such as atmospheric and vacuum pressure, desulfurization, catalysis, reforming, hydrogen production, hydrogenation, gas separation, coking and related public works and auxiliary works Facilities;
(6) Ethylene projects of more than 300,000 tons/year, or supporting paraxylene (PX), methanol, purified terephthalic acid (PTA), butadiene, caprolactam, Ethylene glycol, styrene, acetic acid, vinyl acetate, ethylene oxide/ethylene glycol (EO/EG), butyl octanol, polyester, polyethylene, polypropylene, ABS and other production equipment and related public works and auxiliary facilities ;
(7) Synthetic ammonia projects of more than 150,000 tons/year or corresponding main production units;
(8) Ammonium phosphate projects of more than 120,000 tons/year or corresponding main production units Production equipment;
(9) Sulfuric acid project of more than 160,000 tons/year or corresponding main production equipment;
(10) Soda ash project of more than 300,000 tons/year, 50,000 tons / year or above caustic soda project or corresponding main production device;
(11) 20,000 tons / year or above synthetic rubber, synthetic resin, plastic and chemical fiber project or corresponding main production device;
< p>(12) Organic raw materials, dyes, intermediates, pesticides, auxiliaries, reagents and other projects or corresponding main production equipment with a project investment of more than 200 million yuan;(13) 200,000 sets/ Tire engineering or corresponding main production equipment for more than 20 years;
(14) More than 400 million standard cubic meters/year of coal gasification, more than 500 million cubic meters/year of coal-to-natural gas, more than 200,000 tons/year Coal chemical engineering projects such as coal-to-methanol, coal-to-liquids of more than 160,000 tons/year, coal-based olefins of more than 100,000 tons/year, or corresponding main production devices.