Technological innovation ability is our core competitiveness. As the first local technology company in China to conduct a series of independent research and development in the field of continuous casting technology, we now have a number of national patents and control software copyrights in China. In the past ten years, we have always focused on the needs of customers. With the development of China iron and steel industry, we have introduced new models or technologies every year. Among them, in 200 1 year, the continuous casting machine of Hubei Daye special steel with the radius of 16 m contracted by our company was successfully tested once. The successful commissioning of this super-large continuous casting machine (with a section of 350mm×470mm) is regarded by the industry as a milestone in the history of continuous casting in China. In 2002, we independently developed soft reduction technology, which filled the blank of continuous casting technology in China. In 2007, the first domestic near-net-shape four-strand continuous caster independently developed and designed in China was successfully put into trial production in Changzhi Iron and Steel Group Company, which attracted the attention of the industry.
Since its establishment, we have used the modern company concept to clarify the property right structure and standardize management. In the course of more than ten years' development and evolution, the construction of framework, system and the improvement of management level have always been the focus of our work. Our management idea is employee self-management, and its core is that employees are clear about their responsibilities, so our management team is capable and the company is flat and efficient. A lot of engineering practice has accumulated rich experience, and what is more precious than this is that we have a dedicated, skilled, responsible and energetic staff. The institutional advantages of modern enterprises, stable management team and high-quality employees are the cornerstones of the company's steady development.
From the day we were born, we walked on the stormy road, followed the tide of China's reform and opening up, left a faltering and stubborn footprint at the intersection of the old and new systems, and made a modest and persistent contribution to the fastest development and reform of China's iron and steel industry in history! The spring tide of market economy is surging, and China is experiencing exciting changes and changes. Looking forward to the future, we are still full of enthusiasm, continue to focus on the development and innovation of continuous casting technology, continue to provide customers with better services and write a more brilliant chapter! Sense of mission: We will continue to focus on the development and innovation of continuous casting technology and make continuous improvement to become the best continuous casting technology engineering company in China.
Sense of responsibility: We will always create a development platform for employees, create value for customers, create wealth for society and be responsible corporate citizens.
Core Values: From the customer's point of view, from the point of view of meeting the potential needs of customers to the greatest extent, examine our business philosophy, management system and our workflow, and unswervingly implement the concept of customer first in every link of the company's operation. 1992
1) In July, Wuhan Qingshan Atlantic Metallurgical Technology Research Institute was established and rented the first guest house of WISCO. The registered capital at the time of establishment was only100000 yuan.
2) In June+February, 5438, we signed a contract with Shi Heng Special Steel Plant of Shandong Jigang Group Company for a 3-machine 3-strand billet caster with a radius of 5.25m, which was the first order of WAM Company.
1993
On June+10, 5438, our office address was moved to a garage of Wuhan Metallurgical Building Environmental Protection Research Institute.
At that time, there were only three employees, including the founder of the company. During this period, we signed a design contract with China Metallurgical Import and Export Corporation for Chengde Iron and Steel Co., Ltd. for a 4-machine 4-strand billet caster with a radius of 7 meters.
1994
1) In July, Wuhan Qingshan Atlantic Metallurgical Technology Research Institute was renamed Wuhan Qingshan Atlantic Metallurgical Engineering Technology Co., Ltd., and its office address was moved to an empty room in a military kindergarten on Zhu Min Road in Wuchang District.
2) In September, the design contract of 1 strand slab caster with a radius of 6.5m was signed with Chengde Iron and Steel Co., Ltd., in which the development and application of 90-degree ladle turret was the first in China, and the patent was registered.
1995
In August, Wuhan Qingshan Atlantic Metallurgical Engineering Technology Co., Ltd. was renamed Wuhan Atlantic Metallurgical Engineering Technology Co., Ltd., and its office address was moved to the seventh floor of Jinhong Building in Xujiapeng, Wuchang.
During this period, our team has expanded to 14.
In the meantime, it formed a consortium with Hebei Xingtai Road Roller Group Machinery and Equipment Manufacturing Company to participate in the market competition, which opened the cooperation between the two sides for more than ten years.
1997
1) In May, our office address was moved to the second floor of the Local Taxation Bureau Building in Qingshan District1.
2) In August, the 1 strand slab caster project with a radius of 6.5m was put into operation, which was the first full-arc single strand slab performance of WAM Company.
1998
In April, the 3-machine and 3-stream alloy steel Fiona Fang dual-purpose caster of Hubei Dongfang Iron and Steel Company of Taigang Group was put into operation, which was the first round billet performance of WAM Company.
1999
In February, Hebei Shijiazhuang Iron and Steel Co., Ltd. put into operation a 9-meter radius full-arc continuous caster with two machines and two streams (the largest section steel rigid dummy bar in China at that time).
200 1
1) 10 In June, Wuhan Atlantic Metallurgical Engineering Technology Co., Ltd. was renamed Wuhan Atlantic Continuous Casting Equipment Engineering Co., Ltd., and its office address was moved to the fifth floor of the Entrepreneurship Center of Jianghan Economic Development Zone in Hankou. At this point, our staff has reached 18.
2) In June165438+1October, the alloy steel bloom caster of Hubei Daye Special Steel Co., Ltd. was put into operation with a radius of 16m, three machines and three streams (with a section of 350×470mm). This move is considered as a milestone in the development of continuous casting technology in China.
In 20021October, the product 1 1 provided by our company for Hebei Xinxing Casting Pipe Co., Ltd. passed the appraisal of Hebei Science and Technology Department. The successful application of this technology has filled the blank of soft reduction technology in billet continuous casting in China and reached the leading level in China.
2003
1) 25 continuous casting machine projects were put into operation throughout the year (20 were newly built and 5 were renovated).
2) In July, Hebei Xingtai Delong Iron and Steel Industry Co., Ltd. put into production a compact slab caster with a radius of 6.5 meters and two machines and double streams, which was the first full-arc double-stream small slab in WAM Company.
2004
1) 3 continuous casting machine projects were put into operation throughout the year1project (27 new projects and 4 renovation projects).
2) In June+10/October, 5438, an 8-machine 8-strand alloy steel billet caster with a radius of 12m was put into operation in Hebei Chengde Xinxin Vanadium and Titanium Co., Ltd., which was the first caster with a large radius and the largest number of streams in WAM Company.
2005
1) In March, Shanxi Xinlingang Iron and Steel Co., Ltd. 1 straight arc caster1stream (section: 180× 1260 mm) was put into production, which was the first straight arc slab performance of WAM Company. Among them, the development and application of long-stroke lifting ladle turntable and straightener side replacement device.
2) In June+February, 5438, Tianjin Tiantie Metallurgical Group Co., Ltd., which is our general contractor, put into operation the domestic super-large straight arc 1 slab caster (with a section of 200× 1600 mm), and the total construction period only took 7 months and 25 days.
In October, 200665438, the office address of our company was moved to the metallurgical technology research and development center building built by our company. The number of our employees reaches 70.
1) In March, Sichuan Southwest Stainless Steel Co., Ltd. put into operation the straight-arc two-machine double-flow slab caster, which was the first stainless steel slab performance of WAM Company.
2) In May, the soft reduction technology with radius of15m provided by us for Zhengzhou Yongtong Special Steel Co., Ltd. in Henan Province passed the appraisal of Wuhan Science and Technology Bureau and won the second prize of Hubei Science and Technology Progress Award. The successful application of this technology has filled the blank of soft reduction technology in bloom continuous casting in China and reached the international advanced level.
2007
1) We put into production 3 1 continuous casting machines, with a total flow of 1 18, of which 24 were newly built and 7 were rebuilt.
2) In March, the first domestic near-net shape special-shaped billet caster with a radius of10m, four machines and four streams was put into operation in Changzhi Iron and Steel Group, ending the era when China could only rely on foreign technology or equipment to build near-net shape special-shaped billet caster.
3) In July, the straight-arc 2-machine 2-strand slab caster of Shandong Fulun Iron and Steel Co., Ltd., which was contracted by our company, was put into operation. This is the first straight-arc 2-strand slab (section 200× 1200 mm) in WAM Company, and the hydraulic non-sinusoidal vibration technology was successfully applied for the first time.
4) In August, we built three sets of 3-stream alloy steel Fiona Fang billets (section 350×450mm ~ 450mm) in Wuhu, Anhui. This is the sixth super-large continuous caster built by WAM company with a production radius of 15 meters or more, with a cumulative flow of 15.
5) In September, the straight-arc three-machine three-stream slab caster of Hebei Qianjin Iron and Steel Co., Ltd., which we contracted in general, was put into production, which was the first show of the three-stream straight-arc slab of WAM Company.
6) In June+10/October, 5438, the five-machine five-strand round billet caster with radius 12m in Shandong Shouguang Juneng Special Steel Co., Ltd., the six-machine six-strand round billet caster with radius 10.5m in Heilongjiang Jianlong Iron and Steel Co., Ltd. and the three-machine three-strand round billet caster with radius 12m in Shandong Mo Long Petroleum Machinery Co., Ltd. were put into operation one after another.
2008
1) We * * * put into production 19 continuous casting machine project (16 new project and 3 renovations);
2) In February, it designed, manufactured, supplied, guided the installation and debugging for Jiangyin Huaxi Stainless Steel Co., Ltd., Jiangsu Province. The first straight arc alloy steel bloom caster in China was successfully put into production, and the hydraulic non-sinusoidal vibration technology was successfully applied.
2009
1) 22 continuous casting machine projects were put into operation throughout the year (14 new projects and 8 renovation projects).
2) In June, 65438+10, a large round billet of ¢550mm was successfully added for Hubei Xinye Iron and Steel 16 m radius third-rate alloy steel caster.
3) In June, the straight arc stainless steel slab caster (180mm× 1250 mm) of Southwest Stainless Steel Co., Ltd., which we generally contracted, was successfully put into production. This is the second alloy steel slab caster provided by WAM for Southwest Stainless Steel Co., Ltd.