Tianjin intermediate title evaluation work

The problem is that you don't know what your major is, so how can you tell you what materials to prepare?

Take architecture as an example

The application materials shall be printed through the title declaration system and bound according to the following three categories:

1, information table.

2, "professional and technical positions qualification evaluation form". In accordance with the professional and technical post qualification integrity commitment agreement, academic certificate, current technical post qualification certificate, ID card, professional title foreign language, computer examination certificate (exemption application form), certification materials of the year's examination for those who "evaluate first and then make up", registration qualification certificate and publicity materials of the unit are bound between the cover and the body of the professional and technical post qualification evaluation form. The abnormal recommendation report of the abnormal report personnel is bound at the end of this form. The column of "unit recommendation" in the table should truly reflect the basic evaluation of the applicant's ability, level and actual performance, the verification conclusion of the application materials provided by him, and the results of declaration and publicity.

3. Comprehensive application materials. Including:

(1) "Letter of recommendation from the company". The content should include the evaluation of the applicant's political ideology, professional ethics, work attitude, academic level, professional ability, major professional and technical work and performance during his tenure, which shall be reviewed and signed by the person in charge of the unit and stamped with the official seal of the unit.

(2) "personal work summary". The summary should comprehensively and objectively reflect my work, technical academic level and work ability since I took office. Generally, it can be divided into five parts: ① resume; (2) What kind of re-education (training, further study, study) you have participated in and your current knowledge level; (3) Main work achievements and rewards; (4) Papers, treatises, translations and other works; (5) Reasons for declaration, stating which clauses in the Qualifications (Trial) are met.

(3) Representative works (papers) since taking office. Published papers must be copied from the cover, content and text of the journal (environmental protection majors must submit published papers).

(4) The items filled in the Registration Form of Main Performance Proof Materials for Professional and Technical Personnel are those that have participated in the past five years, and the number is no more than 10, of which two items are selected and recognized by two or more units related to the project other than the unit: Party A, the contractor, the supervision unit and the competent department. The performance part should include the scale (importance) of the project (subject, work) undertaken by the individual and its role (effect), and should be accompanied by documents, unit certificates or relevant contents of the construction organization design plan; Project (project) stage report and evaluation report; Award-winning certificate (award-winning article, award-winning certificate, award-winning certificate); Proof of benefits and effects (such as saving materials, obtaining economic benefits, shortening construction period, etc.). ); Put forward reasonable suggestions and take certain measures to ensure the quality (construction quality, testing quality, etc.). ); Invention patent certificate, utility model patent certificate, patent executor certificate, economic benefit certificate, etc.

(5)20 10 to 20 14 annual appraisal form for professional and technical personnel.

(6) Awards, patent certificates and other main supporting materials.

All the above materials should be printed on A4 paper, bound with staples or bound with glue in three categories (paper clips, tape, etc. Not allowed) keep the surface of the material flat. All materials should be put into a standard file bag, and a list of materials should be attached to the file bag, and the contents of the list should be filled in in detail.

As for the paper:

Intermediate engineer: 2 articles, more than 2,000 words, and scientific journals above the provincial level are enough.

Senior engineer: there are more than 2 kinds of professional journals such as science and engineering or architecture at or above the provincial level with more than 3,000 words.

Be a paper net, and provide papers for publication, titles, educational papers, academic papers, architectural papers and medical papers.