What materials are needed for the pre-examination of land for construction projects in Changchun that do not meet the planning but meet the requirements of individual site selection?
1. In Changchun, the following materials are required to apply for "land pre-examination for construction projects that do not meet the planning requirements but meet the single site selection requirements": 1. Generally, it is required to provide: land use master plan and land use status map (paper and electronic version: 4 originals; 0 copies; The coordinates provided by the applicant are generated in the land planning database. 2. Generally, it is required to provide: application report for pre-examination of land for construction projects (paper and electronic version: 4 originals; 0 copies; Applicants should prepare and provide as required. ) 3. Generally, it is required to provide: an application form for pre-examination of land for construction projects (electronic version: 4 originals; 0 copies; Completed by the applicant and the administrative organ * * *. 4. Generally, it is required to provide: land-saving evaluation report and appraisal opinions (for construction projects that have not yet promulgated land use standards and construction standards at the national and local levels, it is really necessary to break through the scale and functional division determined by land use standards) (paper and electronic version: 4 originals; 0 copies; The applicant provides it as required. 5. Generally, it is necessary to provide: enterprise business license (paper: original 1 copy; 3 copies; Real and effective. 6. General requirements: the revised draft of the overall land use planning (if the basic farmland is occupied, it should also include the supplementary contents of the basic farmland) (paper and electronic version: 4 originals; 0 copies; The applicant should be prepared by a qualified intermediary agency, and the land department where the project is located should cooperate to provide information. 7. Generally, it is required to provide: site survey report (for large-scale construction projects that really need to occupy basic farmland or other cultivated land (linear projects occupy cultivated land 100 hectares or more, block projects occupy cultivated land over 70 hectares or occupy more than 50% of the total land area, except reservoir projects)) (paper and electronic versions: 4 originals; 0 copies; The applicant provides it as required. 8. General requirements: project feasibility study report (paper and electronic version: 4 originals; 0 copies; Provided by the applicant. 9. General requirements: project basis: for the construction project that has approved the project proposal, provide the approval document of the project proposal, and the documents directly approved by the feasibility study report or required by the construction project shall be incorporated into the relevant planning or industrial policy (paper and electronic version: 1 original; 3 copies; Provided by the applicant. ) 10. Generally, it is required to provide: the coordinate table of land boundary points for the project (1980 national geodetic coordinate system) (paper and electronic version: 4 originals; 0 copies; Provided by the applicant. ) 2. Charge for this matter: no charge. Three. The processing time is 13 working days. Four. Address Note: If the government service center or public service center in the administrative area where your household registration is located is not in the listed outlets, please call the government service center or public service center where your household registration is located first. Network Name: Shuangyang District Government Affairs Service Center Network Address: South of Dinglu Square, Shuangyang District, Changchun City Tel: 043 1-84285756 Office hours: 8: 30 in winter-16: 00 in summer-16: 30 (except legal holidays). Telephone number of Minsheng Building at the intersection of Jiutai Tongtong Road and Fulin Street, Changchun City, Lin Province: 043 1-8 1367322 Office hours: 8: 30 in winter-16: 00 in summer: 8:30- 16:30 (except legal holidays). Xin (southeast of yushu city municipal government) outlet Tel: 043 1-8383554 1 Office hours: 8: 30 in winter-16: 00 in summer: 8:30- 16:30 outlets (except legal holidays). /KOOC-0/6/KOOC-0/6 Branch Tel: 043/KOOC-0/-8327900/KOOC-0/Office hours: 8: 30 in winter-/KOOC-0/6: 00 in summer: 8: 30-/KOOC-0/6.