Is the central air conditioner called light steel or wooden keel? Triangle iron is generally used for central air conditioning hoisting, which involves light steel and wooden keel. Light steel keel should be used for the ceiling, and wooden keel should be used where tuyeres need to be installed, because wooden keel is easier to fix tuyeres.
How to install the air inlet, sealed air outlet and inspection port of central air conditioning? When installing, the outdoor unit should be as close as possible to the indoor unit, so as to shorten the refrigeration process pipeline and lower than the indoor unit as far as possible, and the height difference is generally within 5000mm; If possible, it should be installed on the floor or on a fastening platform that will not produce noise. Rubber shock absorbers or rubber strips with a thickness of 10mm shall be set under the base to keep the outdoor unit running stably.
In order to make the outdoor heat exchanger have good heat exchange conditions, the air inlet and exhaust should be unobstructed to avoid backflow, and a gap of more than 200mm should be left on the side of the outdoor unit against the wall;
For example:
1, when installed off the street, the bottom of the unit must be above 2500mm from the ground, so as not to hinder traffic and pedestrians; The hot (cold) wind discharged from the outdoor unit should not be aimed at neighbors or passers-by at close range, and guide fence plates should be set if necessary; In the coastal areas where air pollution and acid rain are serious and the air contains more salt.
2. Prevent the outdoor unit from rusting, reduce the service life of the air conditioner, and at the same time, in order to avoid direct sunlight and improve the refrigeration effect of the unit, a sunshade curtain should be set without hindering the air circulation; When installed on the upper floor of a prefabricated building, the drainage of outdoor units (defrosting water when using a heat pump), including the condensate of indoor units, should be connected to the centralized sewer pipe of the building so as not to affect the normal life of downstairs and passers-by.
Wooden keel 1 installation steps, construction preparation
1, 1 Prepare the main parts, fittings and cover plates of the skeleton.
1 and 2 keels shall be welded firmly and painted.
1 3 suspended ceiling construction shall be carried out after wall decoration.
1 4 is equipped with corresponding labor force, and machines and tools and labor protection articles are fully prepared.
2. Key points of construction
2. 1 Installation of suspended ceiling frame
2. 1, 1 According to the design requirements, choose keel main parts and accessories, and prepare consolidation materials and construction tools.
2. 1, 2 On the basis of the structure, according to the design requirements, play the line to determine the position of the keel and lifting point. Add lifting points at the end or extension of the main keel. Determine the ceiling elevation. On walls and cylinders, elevation lines will pop up according to the requirements of ceiling height. The elastic line is clear and the position is accurate, and its horizontal allowable deviation is 5 mm
2. 1 3 Hanger processing and fixing: fix the telescopic boom at the lifting point, and fix the keel by connecting the boom. The length of the threaded part of the boom end is greater than or equal to 30mm, so as to have greater adjustment. All suspenders shall be neat and consistent, and conform to the requirements of surface-mounted installation.
2, 1, 4. The spacing between steel hangers of wooden arcades is less than 1m, and the spacing between steel hangers of microporous aluminum plates and gypsum boards is less than or equal to1.2m.
2. Installation and leveling of 1 5 keel:
Keel installation sequence: install the main keel first and then the secondary keel. Under special circumstances, the main keel and the secondary keel shall be installed at one time; Hoop the keel with rings; First, fix the main keel with suspenders. When fixed with suspenders, the threaded part is fixed up and down with double nuts. Then adjust the elevation of the main keel according to the elevation line to make it on the same horizontal plane; The positions of the primary and secondary keels should generally be fixed with pendants at the bottom of the main keels according to the size of the decorative plates, and the fixation should be firm and not loose.
2. 1 6 In order to prevent the main keel from leaning to one side, the installation direction of the hanger should be staggered, and the small keel should be perpendicular to the main keel; The blanking size of the cross brace is 2-3mm larger than the nominal size, and the distance depends on the size of the decorative plate, which is generally placed at the joint of the plate.
2. 1 7 suspended ceiling construction, civil engineering and electrical installation should be closely coordinated, especially the reinforcement of reserved holes and chandeliers should meet the design requirements to ensure safety.
2, 2 ceiling cover panel installation
2, 2, 1 The preparation before installation of the cover panel shall meet the following requirements:
2, 2, 1, 1 At the joint of cast-in-place slab or precast slab, set embedded parts or suspenders according to the design requirements;
2, 2, 1, 2 ventilation, water and electricity pipes in the ceiling and pedestrian or installation passages in the main ceiling are installed. The fire pipeline is installed and the pressure test is completed;
2, 2, 1, 3 lamp trough, brace, scissors, etc. In the ceiling should be properly arranged according to the engineering situation, and should be hung on the main keel or additional keel. Heavy lamps or fans should not be connected with the ceiling keel, and hooks should be set separately;
2, 2, 1, 4 cover panels should be classified and matched according to specifications and colors.
2, 2, 2 cover panel before installation, should be according to the structural needs of elastic line respectively. The position of the patterned cover panel should meet the design requirements. If there is no requirement in the design, it should be installed symmetrically from the middle of the ceiling to both sides. The seam between the wall and the ceiling should be consistent with the circle.
2, 2, 3 cover panel and metope, curtain box, lamps and lanterns and other junction should be tight, can not have leakage phenomenon.
2, 2 and 4 For the stacking mode of shelving lamps, a pressing device shall be set according to the design requirements of foundation development.
2, 2, 5 cover panel can not have cantilever phenomenon, should add additional keel fixed.
Two, two, six temporary. Construction should be erected or hung on the structural stress members, and it is forbidden to use the ceiling keel as a support point.
2, 2, 7 all kinds of gypsum board installation:
2, 2, 7, 1 gypsum board installation method adopts screw installation method. The long side of the gypsum board crosses the secondary keel, so that the end edge falls in the center of the secondary keel. Gypsum boards should be staggered from one end of the ceiling, arranged one by one, and the rest should be installed at the end.
2, 2, 7, 2 gypsum board and metope 6mm gap. The spacing between gypsum boards is 2-3mm. Distance between self-tapping screw (3.5○42.5mm) and gypsum board edge: the gap between paper-encapsulated board edge and board edge incision is10-15 mm; Nail spacing is 150- 170 mm, and the spacing between secondary keel of gypsum board is fixed at 400 mm. ..
2, 2, 7, 3 When installing double-layer gypsum board, the joints between the surface board and the base board are staggered and not on the same keel. Paper gypsum board and keel are fixed, from the middle of a board to the four sides of the board, and there are not many points to operate at the same time. The joints of plasterboard shall be treated according to the design requirements. The screw head is slightly embedded in the board surface, and the paper surface is not damaged. Derusting of nail holes and leveling with gypsum putty.
2, 2, 8 mineral wool board installation
2, 2, 8, 1 Flat erection method: Flat erection or symmetrical bent installation. First, install the ceiling frame in place, and determine the middle distance of its T-shaped keel according to the specifications and dimensions of the ceiling plate (choose the finished products on the market or negotiate with the manufacturer to determine the plate specifications as needed), then hang it firmly and place it horizontally. After the keel is installed according to the design requirements and passed the inspection, put the mineral wool board into the keel frame, supported by the limb wing of the T-shaped keel, and stabilize it with the metal locating clip (pressure plate). Pay attention to the installation joints of plates during construction, and the gaps on each side should be within1mm. When the plates are in place, the direction of the arrow on the back of the plates should be consistent with the direction of the white line, so as to ensure the integrity of the decorative patterns and ornamentation of the ceiling.
Two two eight two. Tongue-and-groove plate embedding method: Tongue plate is the same as other decorative plates with tongue-and-groove edges. After T-shaped embedding, the mineral wool plate with tongue-and-groove edges can be installed on the exposed keel frame (or exposed part of the frame) on the ceiling surface, and the two wings of the T-shaped keel are covered by the bite of the ceiling plate.
The temperature difference between the air inlet and the air outlet of the new air conditioner is different, because the preconditions are different.
For example, when the actual indoor temperature is about 20 degrees and the outdoor ambient temperature is about 7 degrees, the air conditioning system is normal, and the outdoor air temperature should be above 35 degrees when the indoor unit is running in the gale. That is to say, the temperature difference between inlet and outlet is above 15 degrees.
How much is the home central air conditioner? Installation fee, copper tube fee, air inlet and outlet fee? Installation fee, copper tube fee and air outlet shall be charged separately.
Yes, these manufacturers don't deserve it, and they need to pay extra. In fact, the price gap between home central air conditioning and home split air conditioning is here. In fact, the prices of air-conditioning machines themselves are similar, and some are still cheap. Some manufacturers of household air-conditioning machines settle accounts for dealers, but the installation materials must only be paid by themselves!
Does Hitachi Central Air Conditioning have a 3D air outlet? Who decorated the house? Okay? The air outlet of the 3D indoor unit is directly set by the controller, which realizes excellent horizontal swing and vertical swing of the swinging blade. Dynamic 3D combined air supply mode, the air supply distance is longer, and the 3D airflow without dead angle coverage is full in all directions. With the beautiful arc appearance of patented design, it can be better integrated with interior decoration and improve the quality and grade of decoration perfectly. Realize the 3D air supply mode of horizontal+vertical two-way combination, with uniform and comfortable temperature and no dead angle covering every corner of the room.
Who knows what's wrong with the air outlet of truck air conditioner? Check whether the mode is set to wiper mode. Don't you just see if the model is implemented? If there is homework, the air outlet connecting pipe is broken. If not, please check the fan circuit!
Hello, specifications of wooden keel and rhombic keel: wooden keel is often used for ceiling decoration and partition wall. Wooden keels come in various specifications. The specification of wooden keel commonly used for ceiling is 30*50㎜, and the commonly used wood is white pine, Korean pine and Mongolian pine. Light steel keel is a very common suspended ceiling keel in modern times. Light steel keel is not only used for suspended ceiling, but also a good material for partition wall. It has the characteristics of hardness, fire prevention and convenient construction. General engineering partitions and large-area suspended ceilings are widely used, but they are rarely used in home decoration. Light steel keel ceiling structure consists of main keel, auxiliary keel and accessories. 40 * 80mm