The Daiso time and schedule are as follows:
1. Scheme design. The startup cycle is generally one year, starting from project establishment in mid-May to completion in early May of the following year. Scheme design should not be started after opening the project. This will seriously slow down the progress of physical production, and the result of the project opening and defense will not be very good. Generally, when opening a project, a set of basic solutions should be given, including control algorithms, basic mechanical structures, etc. After completing the topic, you only need to further modify and refine the plan, conduct feasibility verification, and get a set of plans that can be produced as soon as possible.
2. Patent protection. Regarding patents, we first need to correct a misunderstanding. Patenting is not about making a physical object and then applying for it. It should be about getting a theoretically feasible solution. In order to reach the national level during the mid-term defense, it is best to get the patent acceptance notice before the defense in early October. Before the mid-term defense, in addition to patents and a complete set of solutions, it is best to have a set of physical objects that can realize some functions, or some simulation results, to add chips to the mid-term grading.
3. Physical production. This is the most important part of the project completion and acceptance. A national-level project cannot be completed without a set of working objects.
4. Prototype testing. Since the final materials will be submitted at the end of April, all work must be completed before then. After the prototype is completed, test and adjust it as soon as possible. Make sure there are no problems during the defense presentation.
5. Paper writing. After obtaining the physical test data, you should start writing the paper as soon as possible, because translation and revision will take a certain amount of time. Try to start writing the paper before April.