1961
The first factory is built in Filderstadt near Stuttgart Airport
1963
Gets a new name" Putzmeister" - meaning mortar machine master
1964
The first branch was established in Munich, Rhine-Ruhr, Hamburg.
1965
Production of the Gypsomat machine - the world's first mixing pump for continuous operation of plastering plaster, marking a new revolution in mortar machine technology
1966
The pneumatic delivery pump "Mixokret" was officially included in Putzmeister's product range
1968
Putzmeister began producing water pumps with a 2-meter stroke Hydraulic cylinder piston concrete pump
1969
In 1969, we began to produce "Concrete Pump Truck" brochures for customers
1971
In 1971, the production base in Aichtal was started and the 1,000th concrete pump truck was delivered to the customer. The earliest series of "Elephant" C-shaped directional valves were patented worldwide.
1972
The 20,000th mortar machine was sold, and the overseas branch establishment plan was established
1974
Putzmeister- A French branch was established in Epinay near Paris, followed by subsidiaries in Italy, Spain, the United Kingdom and Brazil.
1976
Developed a concrete mixer truck with boom - PUMI
1977
In the construction of the Frankfurt telecommunications tower, concrete The pumping height set a world record of 310M
1978
The Gotha Tunnel in Switzerland set a world record of 340m vertical pumping and 600M horizontal pumping
1980
Established the fourth product division: Tunnel Machinery
1982
The world's first large-boom concrete pump truck M52-output Powered by 150 cubic meters per hour, it was launched in 1982. In the same year, it acquired an American Thomsen company and changed its name to "Putzmeister-USA" Company
1983
Another new innovation - Shotcrete Buffalo. The largest in the world The birth of the concrete spraying machine
1985
Another concrete pumping record: the 432-meter Spanish pumped storage power station
1986
Delivered the world's longest 62-meter boom pump truck. So far, Putzmeister is the company that sells the most concrete pumps in the world
1987
Delivered the 5,000th large concrete pump Like a pump truck. Putzmeister has developed special radiation-proof pump trucks equipped with sealing devices. The advent of this pump truck presented a new concept of digitization of mechanical parts
1988
In the construction of the Eurotunnel, the Putzmeister pump truck equipped with an electrical system was responsible for Pumping, spraying and clearing tasks
1989
Putzmeister acquires Scheele, a Wibau company in Rothenbergen near Frankfurt, and begins the development of asphalt mixing plants . In 1989, the 1520-meter pumping distance of the Putzmeister TTS 14000 high-pressure concrete pump set a new standard for the development of the industry during the construction of the wastewater tunnel of the Chiemsee Lake Circular Sewer System
1990
The "Putzmeister Halle" service point was established near Leipzig (Leipzig) Airport
1992
After sales in Japan in 1964, Putzmeister established its presence in Japan Putzmeister Japan Branch was established as a joint venture.
Launched in the same year - MSx concrete mixer pump truck for indoor and outdoor building maintenance purposes
1993
Establishment of Putzmeister Racine GmbH - second branch in the United States Department
1994
The creation of a global world record - in Riva del Garda, Italy, the vertical pumping height of a pumped storage power station is 532 meters
Established in Berlin "Putzmeister Berlin" branch
1995
In the new Putzmeister building, the mortar machine was developed independently into the "Putzmeister mortar machine" ” Division
1996
The world’s third manufacturing base - Putzmeister Shanghai was established in China
In the United States - "Putzmeister" was established Meister Gera Service Base"
1997
Putzmeister becomes a joint stock company
The 2015 meter horizontal pump set at the 2015 Le Refrain in France Sending a world record
Together with Lufthansa, we developed an aircraft cleaning robot specifically for aircraft cleaning services
1998
Putzmeister Japan Moved to the north of Tokyo
The company's founder, Mr. Karl Schlecht, retired from day-to-day operations and became Chairman of the Supervisory Board
1999
Public Zmeister has established new factories in the United States, Brazil, and Spain respectively to further expand production capacity
Putzmeister System customized and developed KOS 25100, with an output power of 250 cubic meters per hour, specifically for rivers and Piston pump for lake dredging project.
The 1000th mixing pump truck was delivered
2000
An equipment logistics operation center warehouse was established in Goldisthal, Thuringia, Germany. Different models of tunnel injection equipment and belt conveyors are put into production.
Produced concrete stationary pumps with sound insulation devices specially used in urban construction projects
Three extra-large model KOS 25200 piston pumps with an output of 500 cubic meters per hour are used in Japan. Sludge extraction project
2001
Developed a new 46M 4-section arm equipped with a single-sided support system, which is more flexible in narrow construction sites
A new humanized boom control system - EBC has been developed. The pump operator only needs to control one button to control the movement of all booms.
The new 36-meter Z-type distribution boom appeared at the Bauma 200 Munich exhibition.
2002
Launched a 58-meter compact large-boom pump truck with a 6-axle chassis in the U.S. market.
Newly developed MX39-meter fixed distribution boom without counterweight for use in Japanese sea reclamation project
Further developed to integrate functions such as concrete transportation and dry concrete spraying Integrated BSA1002 concrete drag pump.
2003
Successfully launched BSA 702, a product for wet concrete spraying, to the market
Further developed a humanized output control system
p>
Developed the PM500 tunnel jet machine in cooperation with SIKA AG in Switzerland
Developed the automatic placing boom system Autocor for precast box girder pouring
In the original high-pressure pump HSP 25.100 Based on the improvement, a new mining machinery SP 11 Beliso was developed.
2004
Another new remote control system - Humanized Pumping System (EPS) and - Double Piston Large Capacity , the center pump with a cylinder diameter of 250MM was successfully developed
Launched a new 62-meter 6-section arm pump truck
2005
Putzmeister AG headquarters ) was reorganized into four business units - Concrete Technology Business Department; Concrete Mortar Technology Business Department; Concrete Water Treatment Technology Business Department; Concrete Industry Technology Business Department;
Putzmeister provides pump trucks for high-rise buildings in Dubai , distribution booms and conveyor tubes. Developed ultra-high pressure concrete drag pump BSA 14000 SHPD with pressure over 300 bar
Newly launched M20-4 and M 42-5; TB110 belt conveyor; PUMI 31.89
2006
p>Putzmeister Russia moves to a larger area north of Moscow
A new office is opened in Dubai
In 2006 Strobl Beschichtungstechnik GmbH acquired a specialized Strobl, a company specializing in coating technology
Germany is a manufacturing center for paint and decoration for customized products
In addition, a series of new products have been successfully developed, such as hot water high-pressure mop pumps with pressures up to 2800 bar.
2007
Putzmeister won two innovation awards from the German Construction Industry Association at Bauma 2007. The company's founder, Mr. Karl Schlecht, won the "Construction Technology and Management Innovation Award"
Putzmeister USA acquired Allentown Equipment, a well-known company engaged in dry and wet concrete spraying machines and fireproof mortar pumps .
2008
From February 21, 2008, the Putzmeister Group was changed to Putzmeister Concrete Pump Holding AG.
2012
On January 29, China's Sany Heavy Industry and the world's concrete giant Putzmeister Co., Ltd. (Putzmeister) jointly announced in ***, Germany , the two companies have reached a formal agreement to formally complete the merger after passing regulatory review.