Summary of personal work in iron and steel plant

Model essay on personal work summary in iron and steel works (5 selected articles)

The unforgettable work life is over. Looking back on my past work, I have gained a lot, which means I'm going to start writing my work summary again. So, have you mastered the format of work summary? The following is a summary essay (5 selected essays) of my personal work in the steel plant, which is for reference only. Let's have a look.

Summary of personal work in steel plant 1 20XX came to steel at the end of the year, almost five years have passed. Looking back on the past, one of my students has transformed into a steel worker. After several years of continuous study, progress and practice, I have worked conscientiously in accordance with the rules and regulations of the company, the factory department and the workshop, so as to become a real iron and steel worker with excellent quality and skills, and earnestly complete various indicators in my work.

From the time I came to Iron and Steel, I got a basic understanding of work safety and working procedures through the preliminary study in the company and the three-level safety education at the factory level, workshop level and team level. Then he went to the workshop to train safety knowledge and skills and took up his post in the finished product workshop, and participated in the third phase construction of the sintering plant, which was bittersweet. At that time, I cooperated with the construction unit and witnessed the construction and commissioning of the third sintering plant. Until now, I recalled "the speed of Nippon Steel".

After the finished product workshop was put into production, I had my own post. During this period, I have carefully understood the operation process of the post, and have been diligent in discussing work with my colleagues. I have gradually learned to adjust the running belt when I am not working, and replace all parts of the belt system, such as idlers and fenders. Being diligent in finding problems and solving them in time can better deal with some problems of the belt system, such as running deviation, slipping, belt pressing, abnormal scratches, belt tearing and so on. Abide by operating rules and regulations at work, learn from each other, communicate with colleagues, and ensure interoperability at work. Of course, I was paralyzed because I didn't understand the importance of work. Thanks to the guidance of my colleagues and leaders, I devoted myself to my work and was able to finish it independently.

Keep a learning attitude after work, actively participate in various learning activities of the team, and study safety operation skills harder. The purpose is clear. Only by learning more knowledge about safety in production can we improve our operating skills and deal with failures in the future. Only by ensuring the normal operation of the equipment can we better serve the safety in production. With the change of working ability and the improvement of working ability, with the help and guidance of the leader and master, and with my own puzzled efforts, I changed from the third position to the belt mechanic. After training and teacher's explanation, I learned that the belt cooler is designed to cool sinter during sintering. Belt cooler is the transition link between red-hot sinter and finished ore, and it is one of the most important designs in the sintering process with bad working environment. Whether the belt cooler can run stably has a great influence on sintering production. The belt cooler consists of 132 trolley, 4 fans, 2 motor reducers and flexible transmission device. Abide by labor rules and regulations in future work, ensure safety, study safety operation rules carefully at the meeting before and after work, consolidate yourself, make yourself stick to your post, and complete all your work. Wear labor protection articles before taking over, understand the operation of various parts of the cooler and the sintered red ore caused by improper cooling, add water in time, check the instruments of each fan, and often measure the temperature of the fan.

Seriously implement the safety regulations in the class, and be able to use, check, maintain and troubleshoot equipment. Check the equipment and safety protection facilities from time to time, report and solve problems in time when problems are found, identify hazards, protect yourself, deal with emergencies, and ensure that there are no hidden dangers in the post. After learning these things, I can do my job well. In the face of all kinds of unexpected accidents, I can deal with planned maintenance downtime and temporary downtime well, and cooperate with maintenance workers. Meticulous in the production process, every spot check is carried out in accordance with the "five confirmations" to observe the changes in the running state of the equipment. Operating in strict accordance with the operating rules, every step of sintering work can not be ignored. Any small mistake may cause shutdown and delay production, so it is necessary to develop strict work habits and keep work records at any time.

Safety in production is a top priority for workshops and teams, and it has become a common practice for teams to stress safety first. For example: process control, safety production ledger, mutual insurance joint responsibility book, various confirmation systems, etc. Through these activities, we firmly established the idea of safety first, prevention first and comprehensive management first, and cooperated with the workshop to do a good job of four prevention in winter and summer, safety and environmental protection.

In the future work, we should find more deficiencies and learn safety knowledge and operation skills, so as to continuously improve our own quality and operation level, do our work better and raise our work level and mental outlook to a higher level.

Summary of personal work in steel works 2 I started working in the company on September 10, 20xx. From the first day of the company, I have integrated myself into our team, and it has been three months before I know it. Now I will summarize the work of these three months as follows:

First, study hard, consult modestly, and constantly improve your business knowledge.

Although I have worked for a certain period of time, I have never been exposed to information professional problems in software industry and metallurgical and chemical industry before. However, in order to effectively carry out the company's activities, we must understand the company and its related business knowledge. Therefore, in order to meet the needs of the new situation, a large part of my early work is to re-learn, understand and be familiar with the company, its products and its business. During the three-month probation period, I mainly strengthened my study through the following channels: first, I learned from my old colleagues around me and humbly asked for advice when I encountered problems I didn't understand; Second, through the company's brochures, publicity websites and other industry materials, including the information provided to the technical department, business department and other departments when writing press releases; The third is to search for relevant information on the internet for learning; Fourth, go to Jiangxi Xinyu Project Team and Hubei Xinye Iron and Steel Quality Project Team for field study. Through paying attention to, seeing, thinking and learning at work, I am familiar with the company's situation at a faster speed and better integrated into our team.

Second, gradually implement the publicity and planning work.

The company's publicity work is mainly to do a good job in the company's website; Run the company's internal magazines well; Establish good relations with relevant industry organizations, and do a good job of publicity in their media to establish a good image of the company in the customer industry; Create a harmonious corporate culture within the company, including timely printing various company brochures and other related publicity materials, planning various activities to actively mobilize the enthusiasm of employees, so that employees can consciously integrate into the construction of corporate culture, so as to achieve the recognition and participation of all employees in corporate culture.

Since I entered the company, on the basis of being familiar with the company's products and business, I have actively carried out my work around the above-mentioned key points: First, I updated the content of the company's website in time, wrote seven company news articles and posted them online, conveyed the latest achievements and trends of the company in time, and collected some industry news related to the company's business in order to provide some reference for the company; Second, in view of some disadvantages of the original website, it puts forward an adjustment and modification plan, which is currently being revised; Third, put forward the plan of publishing the company's internal periodicals and collect the titles. At present, with the active participation of colleagues, the collection of book titles has been successfully completed and is being published. It is planned to publish the first issue of the company's internal periodical before 20xx 1. Fourth, actively contact relevant industry associations. During the period of 1 1 month, I visited the director of the Information and Automation Promotion Center of China Steel Association and senior engineer Chu of Metallurgical Automation Design and Research Institute, and learned some information of relevant industry media, which laid a foundation for timely obtaining industry news and promoting the company in the industry media. At present, I am contributing to the journal of communication and metallurgical automation, and I am in contact, trying to see the company's propaganda articles in the industry media about 20xx 1 month; Five, according to the business needs of the company, contact the relevant printing company to print the brochure of the company's handbag and agent product Sixmet.

Third, obey the leadership arrangement, actively cooperate with other departments, and unite and cooperate with colleagues.

To some extent, the purpose of publicity work is to cooperate with the work of business departments. Therefore, in my work, I attach great importance to contacting business departments, learning from them and asking them to make comments and suggestions. At the same time, I also attach great importance to obeying the arrangement of the leaders and actively cooperating with the business departments, such as following the business departments to sign a contract with the business unit WISCO Design and Research Institute and sending invoices to Wuhan for the business departments. As long as it is a matter of unity and cooperation with colleagues, I will enthusiastically complete it.

Of course, no one is perfect, and I still have many shortcomings in my work, such as not being bold enough, not being careful and dedicated enough, and lacking in creativity. In the future, I will seriously overcome my own shortcomings and strive to carry out all the work more effectively.

In short, during the three-month probation period, I feel that I can cooperate with the company's requirements more actively, actively and comprehensively, and I can cooperate and coordinate well with my colleagues. In the future work, I will, as always, be kind to others, be kind to my work, strive for perfection, constantly improve my professional level and comprehensive quality, and do my part for the development of the company.

Summary of personal work in steel works 3 1. Organized the vigorous development of qc group activities, and the achievements of the steel plant won the national first prize in a breakthrough way.

Since 20xx, we have organized qc activities in steel mills, revised the results and participated in national and provincial metallurgical industry competitions. After more than 20 drafts were revised, on April 20th, in the first national "Ocean King" Cup qc Achievement Publishing Competition of China Quality 20xx held in Kunming, Yunnan, the qc achievement of "Reducing the Rejection Rate of Large Section Steel after Rolling" won the first prize, which changed the history that steel mills did not have national qc achievements. After that, this achievement won the first prize of excellent quality management achievement of Shandong metallurgical system in 20xx and the best material award of quality management achievement of Shandong metallurgical system in 20xx respectively. The qc team of the large-scale steel rolling workshop carrying out this project was rated as the national excellent qc team in 20xx. At the beginning of the year, 46 qc groups were registered and established in the iron and steel plant, with 5 16 participants. 65438+February, 12 qc results were announced in the factory.

Second, participate in and organize triz theory training to make the steel plant a typical example of Laigang.

After attending the training course of technical innovation method and triz theory in Laigang in August, 20xx made a summary and communicated with leaders to promote the popularization of this theory in steel mills. Participated in organizing two training courses on technical innovation methods and triz theory in steel mills. 122 middle-level cadres and engineers systematically learned how to use triz theory to solve practical problems in production, making steel mills the first unit in Laigang to systematically carry out triz theory training. On the 9th day after the training, combined with the production technology of H-beam, using the material field theory and knowledge base, a device for preventing steel surface corrosion by adding a field and a substance was invented and patented, which was well received by leaders and experts and professors. This patent became the first patent in Laigang to use triz theory to solve problems. Through the above work, the technical innovation method and triz theory training of iron and steel plant have become the typical examples of Laigang.

Third, do a good job in patent work, so that the application volume of steel mills can reach the best level in history.

Solidly carry out all aspects of patent application to create a good atmosphere, and urge comrades to actively declare. In 20xx, steel mills * * * applied for patents 1 1 for "steel turning device after leveler", which was more than the total number of patents applied in the ten years from 1998 to xx, creating the best level in history.

Fourthly, the positive work made Laigang H-beam pass the "Golden Cup Award" for the physical quality of metallurgical products.

After about half a year's careful preparation, after carrying out the work of material preparation and submission, on-site audit, expert review and slide production, in June+February, 5438, I participated in the professional review meeting of "Golden Cup Award" for the physical quality of metallurgical products in 20xx with the leaders. At the meeting, the quality management status of H-beam in Laigang was introduced, and the defense was successfully passed. Making our H-beam products pass the re-evaluation smoothly means maintaining the international advanced level, which is of great significance to enhance the visibility and market competitiveness of enterprises.

Five, do a good job in the management of technological progress projects

In accordance with the regulations, do a good job in all aspects of technological progress projects. On July 29th, 20xx, nine scientific and technological achievements, including the research and application of alloy coated cast steel rolls, passed the appraisal of the group company. At the 20xx Laigang Science and Technology Awards Conference held on June 2nd in Laigang 165438+, the project of "R&D of European standard H-beam products" implemented by the steel plant won the third prize of major science and technology awards, and nine projects, such as "Research and application of circular saw blade performance in large H-beam production line" won the second and third prizes of technological innovation respectively. In 20xx, the project "R&D of European standard series H-beam products" won the second prize of Shandong metallurgical science and technology progress.

6. Actively prepare for and successfully pass the Korean standard certification audit.

Participate in the improvement of raw materials, processes, equipment, sites and records, and improve the quality management system. After half a year's active preparation, the quality work of steel mills has reached and exceeded the harsh requirements of Korean standard certification. On May 26th and 27th, H-beam Factory successfully passed the on-site audit of Korean standard certification, which laid a solid foundation for Laigang's H-beam products to open up new market areas.

Seven, actively promote six sigma quality management.

At the beginning of the year, workshops and departments were organized to declare six projects suitable for horses, and "reducing eccentricity of large H-beam" and "reducing bending rejection rate of medium H-beam" were identified as company-level projects. Contact and support in the process of project development. Engineers and technicians understand the steps, organizational forms, methods and tools needed for the Six Sigma project to improve product quality and technology. Guiding the Six Sigma project with the main content of reducing the service error rate of medium-sized storage and transportation workshops has played a positive role in improving service quality, seizing market resources and promoting enterprise development. In the second half of the year, 20xx 15 Six Sigma quality management projects were announced for discussion.

Eight, the drafting of management system, to promote the work.

According to the arrangement of the factory, the "Management Measures for Professional Performance Evaluation" was drafted, and the organizational structure and responsibilities, evaluation methods, evaluation standards, application of points and other contents were defined. After implementation, the enthusiasm of engineering and technical personnel for technological innovation was mobilized. And drafted documents about project identification, project establishment, qc activities and promoting the application of triz theory in production.

Nine, participate in the organization of technical research activities in the factory.

At the beginning of 20xx, I participated in the screening of more than 40 reported technical key projects, identified 8 technical key projects, and set up 8 improvement teams after the chief engineer invited tenders for key projects. Participate in organizing the regular meeting of the project, so that the technical research project can receive good results.

Ten, run the "science and technology news"

Strictly implement the corresponding management system, review, modify and submit scientific and technological news every week, and clarify the assessment content. In 20xx, a total of 282 articles were reviewed, revised and submitted, half more than last year. And a special edition of 20xx came out on March 20th. By the end of 65438+February 1 1, there were 105 published articles, up by a quarter year-on-year.

Eleven, actively participate in the preparation, successfully passed all kinds of certification audit.

In 20xx, through active and solid work, the steel plant successfully passed the Korean standard certification review, metallurgical industry "Golden Cup Award" review, transportation product certification review, Guo Jinhengxin Certification Co., Ltd. qes review, ce and fpc review.

Twelve. In addition, the operation, publicity and reporting of party organizations and qes system have been carried out.

In the future, we will continue to work hard, strengthen our study and make greater contributions to the development of steel mills.

Summary of personal work in steel works. Under the leadership of the Party Committee and the superior departments, our factory, in accordance with the work arrangements and requirements at the beginning of the year, closely combined with maintaining the advanced education in party member and the "Management Year" activities of the hospital, carried out in-depth honest service, further strengthened the construction of industry style, and made great efforts to rectify the problems existing in production and sales, and achieved remarkable results. The work in the past six months is summarized as follows:

1. In engineering construction, on the basis of ensuring advanced technology and equipment, reduce engineering investment in all directions.

Under such pressure, during the whole bidding process, we strictly followed the Company's Management Measures for Bidding and Bidding of Engineering Construction and Management Measures for Bidding and Bidding of Material Procurement, and made a serious bid evaluation based on the principles of "practicality, reliability, advanced economy" and "openness, fairness and justice", and strived to win the bid for Angang on the premise of meeting the applicable requirements. Therefore, the import contract alone will save more than 654.38+0.5 billion yuan compared with similar domestic projects. Chinese education

In the process of project construction, the headquarters also set up a fund control management team to scientifically manage and strictly control the export of funds from the aspects of business trips, business recruitment fees and office supplies fees. , comprehensively save project investment.

2. After the project of120 ton converter-steckel mill is put into production, it will carry out self-pressurization with reference to the advanced indicators of similar enterprises, continuously improve the management grade and level, strive to achieve low-cost operation, and create benefits for Angang production to the maximum extent.

After the 120-ton converter steckel mill project was put into production, our factory quickly set up a leading group to tap the potential by benchmarking, reduce costs and increase efficiency, held a mobilization meeting step by step, joined hands from top to bottom to weave a network to reduce costs and increase efficiency, aimed at advanced indicators in the same industry, and set about formulating index assessment methods, constantly improving management level and level, and strive to achieve cost reduction and increase efficiency.

For Angang, whether the modern production line of 120-ton converter-steckel mill can run at low cost and realize increasing production and efficiency as soon as possible is related to the "future" of Angang. As the "driver" of this brand-new production line, our factory listed "cost determines survival" as the first of the four management concepts at the beginning of the factory. In today's * * * difficulty, aiming at the advanced indicators of the same type of production line, our factory, combined with the actual situation of Anyang Iron and Steel Co., Ltd., began to formulate indicators assessment methods, decomposing indicators into sections, posts and individuals, so as to achieve the combination of point and surface, linkage up and down, and set off a comprehensive upsurge of tapping potential by benchmarking, reducing costs and increasing efficiency.

Summary of personal work in iron and steel plant 5 At present, our factory has established an organization with the director and the main leaders of various departments and workshops as members, which has set off the climax of the activity of "tapping the potential by benchmarking". In the next step, we should give full play to the overall advantages of the party, government and military corps, fully participate in it, catch up with advanced technology, and fully realize the cost reduction and efficiency increase of our factory. In response to this work, we will gradually launch some activities to tap the potential by benchmarking.

1, actively carry out technical research and rationalization suggestions to give full play to product advantages.

Facing the world-class production line with large-scale equipment, modern technology and specialized products, our factory will make great efforts to tackle technical problems and correct and solve many equipment operation and technical problems in production organization in time. Use your head, study hard, solve problems before production, correct defects before exposure, and deal with hidden dangers in the bud to ensure smooth production. And actively carry out activities such as rationalization suggestions, "stressing ideals and comparing contributions", mobilize the enthusiasm of all employees, create a good atmosphere, fully tap the potential of equipment, and control this advanced production line well. And start new product development as soon as possible, and give full play to our advanced equipment, technology and product quality advantages.

2. Start from the side, start from the small things, and continue to carry forward the activities of "self-help, repairing the old and utilizing the waste".

From the headquarters to the establishment of the second rolling mill, in the maintenance of electric lights, water pipes, vehicles and production office appliances, in line with the principle of "do it yourself, repair the old and make use of the waste", those that can be repaired by ourselves are not outsourced, and those that can be repaired are not replaced, and expenses are strictly controlled. Carry out activities such as collecting reasonable suggestions for mass resource conservation, tips on production technology, small creation and promotion of small inventions to promote enterprises to innovate production technology and improve production efficiency.

3, refine the division of labor, improve the system, in accordance with the procedures, in accordance with the rules, comprehensive savings.

Office supplies in our factory are managed in strict accordance with the standards of 3 yuan/month for managers and 0.5 yuan/month for operators, and we strive to purchase commonly used and urgently needed office supplies with limited funds to meet daily office needs. Copying, paper, long-distance telephone management, on the basis of strict implementation of the existing management system, combined with the actual work, to further improve the management system, to maximize the control of consumption. In the management of computers and consumables, the recipients must be signed and sealed by the main leaders of the workshop department, and approved by the leaders in charge. The recipients of computer accessories also adopt the way of exchanging old ones for new ones. Management of daily expenses such as posts and telecommunications, printed matter and hospitality. Based on the principle of "economy, economy and practicality", the distribution is made in strict accordance with the company standards and the actual situation of the factory department.

4, to carry out the "four ones" theme of resource conservation practice activities, and guide the broad masses of cadres and workers to start from me, and strive to be a pioneer in resource conservation.

In our factory, cadres and workers extensively carry out resource-saving practice activities with "saving a drop of water, saving a kilowatt hour, saving a piece of paper and saving a screw" as the main content, advocate recycling water, using energy-saving products and public tools, advocate simple living and moderate consumption, educate and guide cadres and workers to firmly establish the consciousness of "saving resources, everyone is responsible", cultivate the concept of saving consumption, and cultivate the consciousness of saving resources and caring for the environment.

;