Are construction drawings confidential documents?

Yes.

Because it involves copyright issues and patent issues of new technologies and processes used in the design, it is necessary to carry out hierarchical confidentiality management of the drawings:

1. The drawings and technical data are based on the requirements of the project. The importance of confidentiality is divided into three categories: top secret, confidential and general.

2. Top secret: Top secret drawings and information must be stamped with a special top secret seal for the project and serialized. In accordance with the management requirements of top secret documents, the issuance and recycling must be registered and managed, and a designated person must sign for receipt and dispatch. If items are lost or leaked, the responsible persons will be held accountable based on the severity of the circumstances.

3. Confidentiality: Confidential drawings and information must be stamped with a project-specific confidentiality seal, serialized, and managed in accordance with the management requirements for confidential documents.

4. General: General drawings and information will not be stamped with any stamps and will be managed according to general drawings and information.