Safety technical disclosure
Table C2-1 No.
Project name disclosure date year month day
Construction unit sub-project name subgrade Engineering work
Disclosure summary
Disclosure content:
1. Safety precautions for roadbed projects
1. Site cleanup
1) It is strictly forbidden to set fire to cleared grass and trees to prevent fires;
2) Cutting down trees must comply with the following regulations: First, the trees cut down must obtain approval from the landscaping management department. Before felling a tree, the surrounding shrubs and canes that may hinder the felling operation should be cut down, and a safe escape route should be selected; warnings should be placed within the tree felling area, and non-staff members are not allowed to stay or approach; in order to make the tree fall in the predetermined direction, Cut a chop at the lower part of the tree in the direction of the fallen tree, the depth of which is 1/4 of the diameter of the trunk, and then cut from the opposite side of the upper edge of the chop, leaving a safe distance of 2~3cm; when cutting down trees on steep slopes and overhanging rocks, Safety measures should be taken to prevent the trees from slipping down the slope and injuring people by falling rocks; it is strictly prohibited to work up and down in the same area at the same time on the hillside; when cutting wood, the tree branches and trunk supports must be stable; strong winds, No tree felling operations are allowed in foggy or rainy days;
3) Before demolishing buildings (structures), a safe and reliable demolition plan should be formulated. First cut off the electric wires, water and gas pipelines connected to the demolition objects, and set up safety guardrails around the dangerous area. Non-staff are not allowed to enter. The demolition process should be from top to bottom, first outside and then inside. It is strictly forbidden to work on several layers at the same time. Operators should work while standing on scaffolding or a stable structure. Structures at risk of collapse should be temporarily supported and reinforced. When dismantling certain parts, prevent other parts from collapsing. Before dismantling beams and columns, all supporting structures should be dismantled. It is strictly prohibited to use demolition methods such as hollowing, cutting and large-area knocking down. When using the controlled explosion method to demolish large buildings (structures), there must be approved controlled blasting design documents;
4) When removing silt, accumulated water should be removed first, and corresponding safety measures should be formulated. Desilting can be done only after taking measures.
2. Earthworks
1) Manual excavation of earthworks must comply with the following regulations: Operators excavating earthworks must maintain a sufficient safe distance: the lateral spacing should not be less than 5m, The longitudinal spacing should not be less than 3m; earthwork excavation must be carried out sequentially from top to bottom, and the method of hollowing out the feet is strictly prohibited;
2) Near buildings, equipment foundations, electric poles and other When excavating soil near scaffolding, safety protection measures must be taken;
3) Construction on high and steep slopes must comply with the following regulations: operators must wear safety belts; if groundwater surges are encountered during slope excavation, Out,
The person who makes the disclosure and the person who makes the disclosure
1. This header is filled in by the person making the disclosure. The person making the disclosure and the person accepting the disclosure will each keep one copy, and the security officer will keep one copy; < /p>
2. When making a safety disclosure for a branch or sub-item construction operation, the "Division or sub-project name" column should be filled in;
3. The disclosure summary should be based on the content of the disclosure. Write down the important content.
Safety technical disclosure
Table C2-1 No.
Project name disclosure date year month day
Construction unit sub-project name subgrade Engineering operations
Summary of briefing
Drainage should be carried out first, then excavation; excavation work should be staggered with the loading operation surface, and double operations of up and down are strictly prohibited; there may be rolling stones under the spoil Warning signs should be set up on roads within dangerous areas, and it is strictly prohibited to pass downhill during operations; operators on slopes must remove loose soil and stones in a timely manner, and it is strictly prohibited to work, rest, or store equipment under dangerous rocks; p>
4) The excavation of the retaining wall foundation trench should also be carried out from both sides of the landslide body to the middle section, and the support should be strengthened, and the back of the wall should be laid and backfilled in time. During the construction, special personnel should be assigned to observe and monitor the displacement at any time. , strictly prevent collapse;
5) When passing cars, light vehicles should give way to heavy vehicles. When passing through narrow roads, intersections, busy traffic areas and turning, you should pay attention to pedestrians and vehicles. When operating heavy vehicles, the distance between the front and rear vehicles must be greater than 10m; when going downhill, the distance should not be less than 15mm, and it is strictly prohibited to carry people on board.
The driveway should be maintained by dedicated personnel, and protective barriers and indicator lights should be installed on the cliffs;
6) Before large and heavy machinery enters the site, it should be checked whether the clear width and bearing capacity of the roads and bridges passing through are It is sufficient, otherwise it should be widened and reinforced first;
7) Temporary hangars or parking spaces should be provided for incoming machinery. When the machinery is started in the shed, ventilation must be maintained. Fireworks are strictly prohibited in the shed, and machine operators must master the use of fire extinguishing equipment;
8) When digging soil near electric poles, an earth platform should be left for the cable ridges and pole shafts that cannot be removed . The radius of the soil platform: the electric pole is 1~1.5m, the guy wire is 1.5~2.5m, and the slope of the soil platform is determined depending on the soil quality. Enclosure warning fences should be erected around the soil platform;
9) When machinery is operating in dangerous areas, obvious safety warning signs must be set up, and a dedicated person should be stationed in a place where the operator can see clearly to direct and drive the machine. Personnel must and can only accept prescribed signals from the commanding officer, but any immediate stop signal issued by anyone should be implemented. ;
10) When the machine is operating on the edge of a slope or trench, it should keep a necessary safe distance from the edge, keep the tires (tracks) pressed on the solid ground, and observe the condition of the slope at any time. When problems are discovered, measures should be taken immediately to ensure safety;
11) Auxiliary work such as bottom cleaning, leveling, and slope repair that cooperate with mechanical operations should be carried out alternately with mechanical operations. Personnel on and off the plane must work closely together and work together. When auxiliary work must be carried out within the scope of mechanical operation at the same time, auxiliary personnel should stop the operation of the machine before entering;
12) Excavator operation: After the engine is started, the bucket, arm, and track It is strictly prohibited to stand on the machine shed; the working position must be flat and stable.
The reviewer will make the disclosure and the person to whom the disclosure will be made
1. This form should be filled in by the person who makes the disclosure, and the person who makes the disclosure will be the same as the person who accepts the disclosure. Each person should keep one copy, and the safety officer should keep one copy;
2. When making a safety report for a branch or sub-item construction operation, the "Division or sub-project name" column should be filled in;
< p>3. The summary of the disclosure should include the important contents of the disclosure based on the content of the disclosure.Safety technical disclosure
Table C2-1 No.
Project name disclosure date year month day
Construction unit sub-project name subgrade Engineering operations
Disclosure summary
The direction of the vehicle body should be consistent with the extension direction of the excavation working surface. During operation, the shovel should not be advanced too deep and the bucket should not be lifted too hard; it is strictly prohibited for the bucket to move from the soil Over the top of the cab of the car. When unloading soil to an earth-moving vehicle, the height of the bucket should be lowered to prevent unbalanced loading or damage to the carriage. It is strictly prohibited to stand within the operating range of the bucket;
13) Bulldozer operation: When the bulldozer goes up and down the slope, the slope shall not be greater than 300. When operating on a cross slope, the cross slope shall not be greater than 100. When going downhill, the slope shall not be greater than 100. It is advisable to back down and slide in neutral. If necessary, the blade can be lowered for auxiliary braking. When working on steep slopes and high sills, there must be a dedicated person to direct the operation, and the blade is strictly prohibited from exceeding the edge of the slope. After sending soil, you should first shift to reverse gear and then lift the blade to reverse; when multiple machines are operating on the same working surface, the distance between the front and rear machines should not be less than 8m, and the distance between the left and right should be greater than 1.5m. When two or more bulldozers are bulldozing side by side, a distance of 20~30cm should be maintained between the blades of the two bulldozers. Bulldozers must move in a straight line at the same speed; when retreating, they should be in sequence to prevent collisions;
14) Grader operations: The rotation of the scraper, the adjustment of the shoveling angle, and the tilting of the machine must all be done. Performed during downtime. The difference in lift and drop of the scraper during operation must not be too large. When encountering hard soil that requires rake to loosen, the teeth should be lowered slowly. It is not advisable to use a tooth rake to loosen old hard pavement. When parking on a slope, the front of the vehicle should be directed downhill and the blade or ripper should be pressed into the soil;
15) Loader operation: The bucket should be raised to about 0.5m above the ground before starting. . Low speed should be used when working. When driving in high gear, the bucket must not be raised, lowered or turned over. It is strictly prohibited to carry people in the bucket. When the bucket is transported with a full load, the bucket should be kept at a low position, the driving road should be flat, and operations should not be performed on a site with an inclination exceeding the specified level. When unloading soil onto the transport vehicle, the soil should be unloaded slowly, the bucket should be at a suitable height, and the forward turning and return should not collide with the carriage;
16) Road roller operation: There must be no obstacles and obstacles in front of, behind, and on the left and right of the road roller. It can only be started when personnel are required.
When the roller is operating close to the edge of the road curb, a necessary safety distance should be left according to the height of the road curb; when two or more rollers operate at the same time, the front-to-back distance should not be less than 3 meters, and when driving in columns on a slope, the distance should not be less than 20 meters. ; The vibratory roller rolls the soft roadbed, first rolling it 1 to 2 times without vibration, and then vibrating it again.
3. Protection project
1) Protection project masonry: For slope protection operations, solid scaffolding must be erected; masonry work must be built from bottom to top, and the stones must be broken
Reviewer, person making the disclosure, person to whom the disclosure is made
1. This header is filled in by the person making the disclosure, the person making the disclosure and the person accepting the disclosure each keep one copy, and the safety officer has one copy;
2. When making a safety disclosure for a branch or sub-item construction operation, the "Division or sub-project name" column should be filled in;
3. The summary of the disclosure should include the important contents of the disclosure based on the content of the disclosure. Write it.
Safety technical disclosure record
Table C2-1 number
Project name disclosure date year month day
Construction unit sub-project name Subgrade engineering work
Disclosure summary
Disclosure content:
Crushing or modification shall not be carried out on scaffolding. When the protective wall is being built, it is strictly forbidden to stand under the wall and carry stones to the shelves. The springboard should be solid and equipped with anti-slip strips. When working on the rack, no one is allowed to operate or stay under the rack. When masonry is being carried out on the top, it is strictly prohibited to do jointing work on the bottom;
2) Mortar mixer operation: The mixer should be placed securely and fixed. Before starting, the transmission and various devices must be confirmed to be firm and reliable, and the operation is flexible. Hands are strictly prohibited during operation. Insert a stick or wooden stick into the tube to clean the mortar from the tube. If a malfunction occurs during operation, the power supply should be cut off immediately and the mortar in the cylinder should be poured out. Only after the malfunction is eliminated and the test operation station is normal, can the mixing operation be resumed.
3) Mortar jet machine operation: The inside of the jet machine should be kept clean. The personnel of the transfer pump and the jet machine should be in close contact and coordinate with each other. No one should stand within 5m in front of the nozzle. When work is stopped, the nozzle must not face the direction of people;
4) The excavation foundation of the retaining wall should be graded according to the soil quality, humidity and depth of excavation, and the slope must meet safety requirements. If grading is not possible, continuous wall support should be installed to ensure safety and reliability;
5) During manual foundation excavation, the earth thrown up from the foundation pit should be transported while digging. When the soil platform is thrown and unearthed in layers, the width of the steps shall not be less than 0.7m and the height shall not be greater than 1.5m. The earth temporarily piled at the upper edge of the foundation pit should be at least 0.8m away from the edge of the pit, and the stacking height should not exceed 1.5m;
The person who is reviewing the report and the person who is being reported
1. The header of this table It shall be filled in by the person making the disclosure, and the person making the disclosure and the person accepting the disclosure shall each keep one copy, and the safety officer shall keep one copy;
2. When making a safety disclosure for a branch or sub-item construction operation, the “division, sub-item” should be filled in "Project Name" column;
3. The summary of the disclosure should include the important contents of the disclosure based on the content of the disclosure.
Safety technical disclosure
Table C2-1 No.
Project name disclosure date year month day
Construction unit sub-project name pavement Engineering operations
Disclosure summary
Disclosure content:
1. Base construction
1) Lime must not be dissolved while soaking in water. When feeding and stirring, personnel should stay away to prevent burns;
2) When loading, unloading, spreading and turning powdery materials, operators should stand on the windward side and mix and turn gently to reduce dust. Bulk powdery materials should be transported in powder transport trucks. Otherwise, the carriages should be covered with tarpaulins, and loading and unloading should be avoided in windy weather;
3) Sprinkler truck operations: Sprinkler trucks are used on uphill, downhill and curved roads. When the road is in operation, high-speed driving is not allowed, emergency braking is avoided, and no one is allowed to stand outside the cab of the sprinkler truck;
4) Lime fly ash gravel construction: Construction should be carried out in strict accordance with the construction specifications and operating procedures of various machines. Put up warning signs at the work site to prohibit illegal operations and prohibit non-construction personnel from entering the construction site. Construction machines, vehicles and personnel should keep a sufficient safe distance from electrical lines. If this cannot be ensured, reliable safety protection measures should be taken. The unloading truck must be directed by a dedicated person. When unloading, no one is allowed to stand near the unloading truck.
When manually removing the mixture stuck to the rolling wheels of the roller, you must work behind the roller, and it is strictly prohibited to work backwards in front of the roller. Adequate lighting equipment must be provided for nighttime construction. When constructing on roads open to traffic, the construction area must be fenced and safety warning signs must be set up. Construction workers must wear clothing with eye-catching reflective signs to ensure construction safety;
5) Road curb installation , Pavement of sidewalk bricks and construction of rainwater outlets: Personnel loading and unloading curbs and square bricks on the sidewalk should wear gloves and flat shoes, and must be handled with care. Throwing and collisions are strictly prohibited to prevent accidents such as squeezing hands and smashing feet. When using a motorized dump truck to transport materials, the driver must hold a certificate and must not drive with people in violation of regulations. When working on a passing road section, workers must wear reflective vests and safety helmets, set safety warning signs around the working section, and enclose the working area to ensure safety;
6) Road base The rainwater inlets and wellheads above must be covered in time. In areas open to traffic, corresponding strong rainwater grates and manhole covers should be installed at rainwater inlets and wellheads to prevent vehicle collisions and rolling loosening;
2. Asphalt concrete pavement construction
1 ) Asphalt operators should undergo physical examination. Anyone suffering from conjunctivitis, skin diseases or allergic reactions to asphalt should not engage in asphalt operations. Personnel engaged in asphalt operations must apply protective ointment on exposed parts of the skin. There should be medical personnel on the construction site;
2) Asphalt operators' work clothes and protective equipment should be stored in a centralized manner, and it is strictly prohibited to wear them home or enter dormitories;
3) Asphalt mixing The following regulations should be followed when paving with asphalt concrete paver
(1) Before paving asphalt concrete, the weather forecast should be listened to and construction should be avoided on rainy days. If it rains, the asphalt concrete that has been paved should be rolled and sealed in time before the rain, and the asphalt concrete that will be rolled and soaked by rain must be eradicated after the rain. Due to poor visual conditions on rainy days, construction workers must keep a certain safe distance from construction machinery;
The reviewer will submit the report and the person to whom the report will be submitted
1. This header should be filled in by the person who submits the report. The person making the disclosure and the person accepting the disclosure will each keep one copy, and the safety officer will keep one copy;
2. When making a safety disclosure for a division or sub-item construction operation, the "Name of the Division or Sub-item Project" column should be filled in;
3. The summary of the disclosure should include the important contents of the disclosure based on the content of the disclosure.
Safety technical disclosure
Table C2-1 No.
Project name disclosure date year month day
Construction unit sub-project name pavement Engineering operations
Disclosure summary
(2) Traffic safety work must be done at the construction site, the construction section should be closed, and non-construction vehicles are strictly prohibited from entering. Warning signs should be set up at intersections with heavy traffic and designated personnel should be assigned to direct them. For nighttime construction, warning signs or reflective signs should be set up near intersections and benchmark piles. The lights must be bright and there should be no dark corners, and lighting must be managed by dedicated personnel;
(3) Unloading trucks and traffic diversion There must be a dedicated person responsible for command and management, and a dedicated person responsible for directing the paver paving operation;
(4) Construction at intersections must have a dedicated person responsible for command and management. Temporary traffic closures require dedicated personnel to direct public vehicles. After the paving is completed, sprinkle water in time to cool down, and traffic can be resumed only after the road temperature cools down;
(5) All operators on site must wear qualified protective equipment as required;
(6 ) The driving platform and work site should have a wide field of vision, and all obstacles that may hinder work should be removed. Unrelated personnel are not allowed to stay on the bridge during operation. The driver is not allowed to leave his post without authorization;
(7) When the material truck unloads materials to the paver, a dedicated person must be assigned to direct them to ensure that the vehicles move in a coordinated and synchronous manner to prevent collisions;
(8) The driving speed of construction vehicles shall be controlled within 20Km/h after entering the site. Speed ??limit construction signs shall be set up 100m before and after the paver work, and the speed limit shall be 5Km/h to avoid traffic accidents caused by high-speed vehicles;
(9) Shifting must be performed when the paver is completely stopped. Forcibly shifting gears, shifting gears on slopes or sliding in neutral is strictly prohibited;
(10) When preheating the screed, it should be Control heat to prevent deformation due to local overheating. During the heating process, there must be a special person to supervise;
(11) Drive smoothly and do not make emergency turns.
When working on curves, the distance between the end of the screed device and the curb should not be less than 10cm to avoid collision;
(12) When cleaning the paver with diesel, do not approach an open flame.
4) Roller rolling operation
The scrapers of the front and rear wheels of the road roller should be kept flat and well. Personnel who oil or water the rollers should work closely with the driver and must follow behind the rollers and pay attention to the steering of the rollers.
Reviewer, person making the disclosure, person to whom the disclosure is made
1. This header is filled in by the person making the disclosure, the person making the disclosure and the person accepting the disclosure each keep one copy, and the safety officer has one copy;
2. When making a safety disclosure for a branch or sub-item construction operation, the "Division or sub-project name" column should be filled in;
3. The summary of the disclosure should include the important contents of the disclosure based on the content of the disclosure. Write it.
Safety technical disclosure
Table C2-1 No.
Project name disclosure date year month day
Construction unit sub-project name old Pavement removal operations
Summary of disclosure
Disclosure content:
1. The removal of old road surfaces should be carried out in sections, and the construction sections should be enclosed and set up Warning and guidance signs to avoid impeding traffic;
2. When using pickaxes to excavate old roads, they should move side by side. The distance to the left and right should be no less than 2m, and the distance to the front and back should be no less than 3m. Pickaxes must not be used face to face;< /p>
3. When the sledgehammer is smashing the old road surface, no one is allowed to stand or pass around it. When hammering a steel drill, the hammer handler should stand on the side of the drill supporter. The hammer handler should not wear gloves, and the end of the hammer handle should have anti-slip measures;
4. Use pneumatic tools to remove old pavement. , the following regulations should be complied with
(1) The pipe joints of each part must be tightened and air-tight. The rubber pipe must not be twisted or knotted, and the air duct must not be bent to cut off the air, nor can the air duct be placed under the crotch;
(2) When the air duct passes through the aisle, trenches must be dug to The air duct is buried downward, and the upper side is provided with hard protection to prevent it from being crushed by heavy vehicles;
(3) After the air duct is connected to the air bag, try air supply and check whether there is any debris blocking the air duct. When supplying air, the valve should be opened slowly and not opened suddenly;
(4) The pneumatic pick operator should work closely with the air compressor driver to supply or hold the air in time;
(5) ) After the drill bit is inserted into the pneumatic tool, no empty drilling is allowed.
5. When using machinery to break old pavement, a dedicated person must be assigned to provide unified command. No one is allowed within the operating range. The blade should not cut too deep into the ground, and the speed of pushing the blade should be slow.
Reviewer, person making the disclosure, person to whom the disclosure is made
1. This header is filled in by the person making the disclosure, the person making the disclosure and the person accepting the disclosure each keep one copy, and the safety officer has one copy;
2. When making a safety disclosure for a branch or sub-item construction operation, the "Division or sub-project name" column should be filled in;
3. The summary of the disclosure should include the important contents of the disclosure based on the content of the disclosure. Write it.
Safety technical disclosure
Table C2-1 No.
Project name disclosure date year month day
Construction unit sub-project name Bulldozer , loader operation
Disclosure summary
Disclosure content:
1. Common sense of safe operation of bulldozers and loaders
1. Operators You must hold a certificate to work, and non-professional drivers are strictly prohibited from operating. You are not allowed to leave your post without authorization during work, and you are not allowed to operate machinery that does not comply with the operating certificate. It is strictly prohibited to hand over mechanical equipment to persons without operating certificates for this type of machine. It is strictly prohibited to operate after drinking;
2. Before each operation, check whether the lubricating oil, fuel and water are sufficient, whether the various instruments are normal, whether the transmission system and working equipment are in good condition, and whether the hydraulic pressure There must be no leakage in the system and each pipeline, and it can only be started after confirming that it is normal;
3. The operator must strictly implement the pre-work inspection system and pay attention to observation and work during work in accordance with the instructions of the machine.
The final inspection and maintenance system;
4. The cab or operating room should be kept clean and tidy, and it is strictly prohibited to store flammable and explosive items. Wearing slippers, smoking and working under the influence of alcohol are strictly prohibited.
It is strictly prohibited to operate machinery with malfunction or overload;
5. When parking mechanical equipment at the construction site, you should choose a safe parking location and lock the cab (operating room) door , pull on the parking brake
. When parking on a slope, use triangular logs or rocks to prop up the wheels. Special personnel should be supervised at night;
6. For water-cooled machinery, when the temperature is below 0°C, the water should be drained in time after work, or other anti-freezing measures should be taken to prevent freezing
The machine body will crack;
7. During construction, underground obstacles on site must be marked first, and a dedicated person shall be assigned to direct the construction of the machinery to ensure the safety of underground obstacles and mechanical equipment;
8. Before the operation, the operation driver and construction team leader must fully study and understand the content explained by the technical leader. If they do not understand or are unclear, they should ask in time. Among them, the operation driver and construction team leader must clearly remember the types and locations of obstacles underground, on the ground and in the air at the workplace (including: height of filled and excavated soil, slope gradient, underground cables, height of surrounding wires, various pipes, pits and various obstacles, etc.), construction in this location must obey the instructions of the construction team leader, and work without instructions is strictly prohibited;
9. During the operation, non-construction personnel are strictly prohibited from entering the construction area, and construction personnel are strictly prohibited from entering the construction site. Chasing and fighting;
10. When man and machine cooperate in construction, personnel are not allowed to stand on the working surface in front of the machinery. They must stand outside the mechanical working surface. The rollers need to be cleaned manually when rolling. When there is soil on the road, workers should clean it behind the roller. It is strictly forbidden to clean in the forward direction of the roller to prevent personal injury and death accidents caused by tripping when backing up;
The person who makes the report and the person who makes the report
< p>1. This form should be filled in by the person making the disclosure, and the person making the disclosure and the person accepting the disclosure should each keep one copy, and the safety officer should keep one copy;2. When making a safety disclosure for a branch or sub-item construction operation, it should be Fill in the "Division and sub-project name" column;
3. The summary of the disclosure should include the important contents of the disclosure based on the content of the disclosure.
Safety technical disclosure
Table C2-1 No.
Project name disclosure date year month day
Construction unit sub-project name Bulldozer , Loader operation
Disclosure summary
Disclosure content:
2. Safety precautions when bulldozer operation
1. Do not pile soil If buried pressure structures and facilities, such as water supply gate wells, fire hydrants, roadside ditches, rainwater sewage wells, and control piles set by surveyors, must be bulldozed, they should consult with the relevant personnel and take certain protective measures before construction. ;
2. The pile of soil should not be placed close to transformers, houses and ancient buildings, etc., so as to avoid the collapse of transformers and buildings caused by uneven force and affecting safety;
3. While walking and working Especially when raising and lowering the tool holder, you should rise and fall slowly to prevent the tool holder from injuring people;
4. When the bulldozer goes up or down the slope, the slope must not be greater than 300. When working on a cross slope, the cross slope shall not be greater than 100. When going downhill, it is advisable to back down, and sliding in neutral is strictly prohibited. If necessary, the blade can be put down for auxiliary braking;
5. When working on steep slopes and high ridges, a dedicated person must be assigned to direct the operation, and the blade is strictly prohibited. Beyond the edge of the slope. When the soil feeding is terminated, you should first shift to reverse gear and then lift the blade to reverse;
6. When operating in trenches on vertical slopes, the depth of the trench should not exceed 2m for large bulldozers and for small bulldozers. Bulldozers must not exceed 1.5m. The bulldozer blade must not push stones or large soil blocks on the slope wall that are higher than the fuselage;
7. Pile soil on one or both sides of the ditch, 1 meter away from the edge of the ditch (in soft soil areas) The pile of soil should not be less than 1.5 meters away from the edge of the ditch), and its height should not exceed 1.5 meters. The top of the pile of soil should be sloped outward, and an on-site access road should also be considered to facilitate construction and safety.
The amount of soil piled on each side can be determined according to the site conditions, but construction safety must be ensured;
8. When removing and removing the bulldozer blade, the convenience of mounting it next time must be considered. . When removing the blade, the auxiliary personnel should work closely with the driver.
Wear canvas gloves when pulling through the wire rope. It is strictly forbidden to peek close to the rope hole;
9. Multiple machines on the same working surface During operation, the distance between the front and rear machines should not be less than 8m, and the distance between the left and right machines should be greater than 1.5m.
When two or more bulldozers are bulldozing side by side, a distance of 20~30cm should be maintained between the blades of the two bulldozers. Bulldozers must travel in a straight line at the same speed; when retreating, they should be in sequence to prevent collisions;
10. It is prohibited to use bulldozers to cut down large trees, demolish old buildings or remove broken walls;< /p>
11. When the bulldozer is towing other equipment, a dedicated person must be responsible for the command. The connection of the steel wire must be firm and reliable. Construction workers should keep a safe distance when pulling on slopes and long distances.
Reviewer, person making the disclosure, person to whom the disclosure is made
1. This header is filled in by the person making the disclosure, the person making the disclosure and the person accepting the disclosure each keep one copy, and the security officer has one copy;
2. When making a safety disclosure for a branch or sub-item construction operation, the "Division or sub-project name" column should be filled in;
3. The summary of the disclosure should include the important contents of the disclosure based on the content of the disclosure. Write it.
Safety technical disclosure
Table C2-1 No.
Project name disclosure date year month day
Construction unit sub-project name Bulldozer , Loader operation
Disclosure summary
3. Safety precautions when loader operation
1. Before starting, you should observe whether there are obstacles and pedestrians in front and behind the machine. , lift the bucket about 500 mm above the ground and sound the horn before starting. During driving, high speed gear should be selected depending on the road conditions. Lifting, lowering and flipping the bucket during driving is strictly prohibited;
2. Low speed gear should be selected during operation. When walking, try to avoid lifting the bucket too high. Different shoveling methods should be used according to different soil qualities, and the shovel should be inserted from the front as much as possible to prevent the bucket from being stressed on one side. When operating on a loose and uneven site, the lifting rod can be placed in a floating position to allow the bucket to operate on a flat surface;
3. The driving road should be flat, and it is not allowed to operate on a site with an inclination exceeding the specified limit. The transportation distance It should not be too large. When the bucket is transported with a full load, the bucket should be kept in a low position;
4. When operating on loose and uneven sites, the bucket arm can be placed in a floating position to advance the bucket smoothly. If the propulsion resistance is too great, the shovel arm can be slightly raised. When loading, the bucket should be inserted from the front at low speed to prevent the bucket from being stressed on one side;
5. When unloading soil onto the transport vehicle, the shovel should be moved slowly. The bucket should be at a suitable height, and the forward and return positions must not collide with the car;
6. Always pay attention to the sound of the machine parts, and stop the car immediately if any abnormal response is found to eliminate the fault. When the engine cannot run and traction is required, each steering cylinder should be kept free to move;
7. When shoveling soil (materials), it is not allowed to increase the accelerator and plunge the bucket into the soil (materials) at high speed. Load materials in a pile, use low-speed insertion to place the bottom of the bucket parallel to the ground, then lower the shovel arm, gradually increase the engine speed along the ground to dig forward, and at the same time reel in soil (material) to reduce the resistance encountered by the bucket; p>
8. When unloading, apply the clutch pedal to brake so that the bucket flips forward without touching the carriage. Unloading should be slow to reduce the impact on the carriage. After the shovel arm moves up or down to the maximum limit, the joystick should be quickly returned to the neutral position to avoid making noise and causing malfunctions of various parts under the action of the safety valve;
9. When walking and turning, you should try your best to When turning slowly, use the brake pedal to slow down, and rolling downhill is strictly prohibited. Always pay attention to the working conditions of various instruments and indicating signals, and listen to the working sounds of the engine and other parts. If any abnormality is found, stop the vehicle immediately for inspection. After the fault is eliminated, before you can continue working;
10. After stopping, the loader should be parked on a hard surface. If it is parked on a slope, the front and rear tires should be wedged with triangular wood. After the operation has stopped, the bucket should be placed on the ground, the slide valve handle should be placed in the neutral position, and the hand brake should be pulled.
Reviewer, person making the disclosure, person to whom the disclosure is made
1. This header is filled in by the person making the disclosure, the person making the disclosure and the person accepting the disclosure each keep one copy, and the safety officer has one copy;
2. When making a safety disclosure for a branch or sub-item construction operation, the "Division or sub-project name" column should be filled in;
3. The summary of the disclosure should include the important contents of the disclosure based on the content of the disclosure. Write it.