How many days does it take for Changchun to handle the pre-examination of land for construction projects that meet the planning?

First, in Changchun City, you need to bring the following materials to apply for the "Pre-examination of Land Use for Construction Projects in Accordance with Planning":

1. Generally, it is required to provide: the general land use planning map indicating the land use scope of the project and the current land use map (paper and electronic version: 4 originals; 0 copies; The coordinates provided by the applicant are generated in the land planning database. )

2. General requirements: industrial and commercial business license (paper and electronic version: 0 originals; 1 serving; Check the originals and copy them on A4 paper. )

3. General requirements: application report for pre-examination of land for construction projects (paper and electronic version: 4 originals; 0 copies; Applicants should prepare and provide as required. )

4. General requirements: application form for pre-examination of land for construction projects (electronic version: 4 originals; 0 copies; Completed by the applicant and the administrative organ * * *. )

5. General requirements: land-saving evaluation report and evaluation opinions (for construction projects that have not yet promulgated land use standards and construction standards at the national and local levels, and construction projects that really need to break through the scale and functional zoning determined by land use standards) (paper and electronic versions: 4 originals; 0 copies; The applicant provides it as required. )

6. Generally, it is required to provide: site survey report (for large-scale construction projects that really need to occupy basic farmland or other cultivated land (linear projects occupy cultivated land 100 hectares or more, block projects occupy cultivated land over 70 hectares or occupy more than 50% of the total land area, except reservoir projects)) (electronic version: 1 original); 3 copies; The applicant provides it as required. )

7. General requirements: project feasibility study report (paper and electronic version: 4 originals; 0 copies; Provided by the applicant. )

8. General requirements: project basis: for the construction project that has approved the project proposal, provide the project proposal approval document, and the documents directly approved by the feasibility study report or required by the construction project shall be incorporated into the relevant planning or industrial policy (paper and electronic version: 1 original; 3 copies; Provided by the applicant. )

9. Generally, it is required to provide: the coordinate table of land boundary points for the project (1980 National Geodetic Coordinate System) (paper and electronic version: 4 originals; 0 copies; Provided by the applicant. )

Two. Allegations on this matter:

be free of charge

Third, the processing time limit

13 working days

Four. Processing address

Note: If the government service center or public service center in the administrative area where your household registration is located is not in the listed outlets, please call the government service center or public service center where your household registration is located first.

Network Name: Shuangyang District Government Affairs Service Center Network Address: South of Dinglu Square, Shuangyang District, Changchun City Tel: 043 1-84285756 Office hours: 8: 30 in winter-16: 00 in summer-16: 30 (except legal holidays).

Network Name: Jiutai District Government Affairs Service Center Network Address: Minsheng Building at the intersection of Changdao Road and Fulin Street in Jiutai, Changchun, Jilin Province Network Tel: 043 1-8 1367322 Office hours: 8: 30 in winter-16: 00 in summer-8: 30-/kloc-0.

Network Name: Yushu Municipal Affairs Service Center Network Address: Yushu Municipal Affairs Service Center (southeast of Yushu Municipal Government) Network Tel: 043 1-838354 1 Office hours: 8: 30-16: 00: 8: 30-16 in winter.

Name of outlet: 3rd floor, Government Affairs Service Center, Nong 'an County, Changchun City, Jilin Province Address: Debiao Street 16 16 East of Long Fu Square, Nong 'an County, Changchun City, Jilin Province Tel: 043 1-8327900 1 Office hours: 8: 30-/kloc-0 in winter.

Name of outlet: dehui city Municipal Affairs Service Center outlet address: west of the intersection of Dexing Road and Huixin Road in dehui city 100m Tel: 043 1-870008 15 Office hours: 8: 30 in winter-0/6: 00 in summer-8: 30-/KLOC-0.

Name of outlet: Changchun Municipal Affairs Service Center outlet Address: No.3177, Puyang Street, Changchun City Tel: 043 1-887790 17 Office hours: 8: 30 in winter-0/6: 00 in summer-8: 30-/KLOC-0.