Annual work summary of the R&D department

5 annual work summaries of the R&D Department

Time is an arrow. It comes and goes in a hurry. A period of work has come to an end. Looking back on this period, our work ability and experience have improved. Let us summarize the growth we have made and record it in the work summary. Below is the annual work summary of the R&D department that I compiled for you. I hope you like it!

Annual Work Summary of the R&D Department (Selected Part 1)

20__ is about to pass, and we will usher in a new and challenging 20__. As a technology research and development department, we have gained a lot in the past year, but there are also shortcomings. Looking back at the past year, there are unforgettable joys and memories that are unbearable to look back on. Looking back on the past and looking forward to the future makes people alert, wise and inspiring. As the saying goes, "Aim high and write sincerely." Below, I will report to the leaders on the main work in 20__:

1. Efforts to coordinate various departments and arrange production according to the sales plan

According to the company's sales plan, all factors such as raw materials, production equipment, and personnel arrangements are taken into consideration to determine the order in which products are produced. Formulate the production process parameters of products and arrange production in various departments. Coordinate the production workshop, front end, composite workshop and inspection workshop.

2. Be truthful and pragmatic in work, pioneering and innovative

In the innovation of new products in 20__, we have made new breakthroughs. After a long period of research and practice, we have successfully produced quartz sand floors with beautiful appearance and wear-resistant materials and flocked floors with antibacterial and waterproof properties. In the past, we had to purchase embossed surface layers, but we have purchased them independently. Research and development can be produced by oneself; in 20__, several patents were applied for after continuous summarization. In the process of continuous experimentation and practice, we boldly use new materials to reduce costs and improve product quality, in order to bring greater benefits to the company. In 20__, quartz sand flooring was still in the initial trial production state. This year, it produced 3,550 meters, about 7,100 square meters, and the research and development cost was about 500,000. The production of flocked flooring this year is 1,600 meters, about 2,400 square meters, and the research and development cost is about 100,000. The production area of ??the pool pattern series products is 2800 meters, about 5040 square meters, and the research and development cost is about 200,000. New commercial flooring products include Natural Series, Dushang Series, Carle Series, Hill Series, Furui Series, Ruinuo Series, etc.

3. Continuous learning and careful summary

Whether it is the improvement of old products or the development of new products, I need to continue to learn new knowledge and improve my theoretical level. For the research and development of new products, it is necessary to consider various factors before the production of the new product, and then preliminary determine its process parameters through experiments, and then verify the correctness of the process parameters through actual production, and then conduct experiments, summary, thinking and repeated practice , and finally get our various process parameters to ensure the production of qualified products.

4. Directions for future efforts

1. Study hard, be brave in practice, integrate theory with practice, improve overall quality and business capabilities, and make your own contribution to your job.

2. Strengthen the awareness of innovation, strengthen cooperation between various departments, continue to explore and innovate boldly.

I have the confidence to work with various departments to study hard and continuously develop new products. Through everyone's efforts, our company will be at the forefront of the industry. Let us work together for the future of the company and create a better tomorrow. If there are any deficiencies in the above report, leaders and comrades are kindly requested to criticize and correct them. Annual Work Summary of the R&D Department (Selected Part 2)

This is a crucial year for our company to fully enter the market. During this year, our R&D Department actively cooperates with the work of various departments and strengthens research and development. Research and development of new projects to ensure the rapid and steady development of the company. The work of the R&D department is summarized as follows:

1. Product R&D

From the second half of the year to the end of this year, the research and development of oxygen-free copper tubes is the focus of our R&D department. At the beginning of this year, we conducted research and customization of the equipment required for copper tube research and development, went out to inspect and negotiate with suppliers, and customized two ten-ton pipe drawing machines, one header machine, one grinding machine, one cleaning equipment, and one pure water equipment each. We also identified experts for the production of oxygen-free copper tubes and developed new processes to ensure stable product quality and the development of new products.

In the second half of the year, we ordered corresponding supporting facilities, formulated feasible production processes, communicated with customers in a timely manner, integrated resource information, made new product samples, and self-tested the roundness, curvature, outer diameter, inner diameter, wall thickness, etc. of the products. Length, appearance, etc., and send the product to the relevant material testing center for composition analysis, and send samples to customers together with the material testing report and product data, provide timely feedback, correct existing problems, and re-produce samples.

2. Technical support, quality improvement, and reliability improvement

While doing a good job in the research and development of new products, the R&D department insists on doing a good job in the production of the manufacturing department, the inspection of the quality department, and the sales. In the technical support work of the service, we have continuously improved and enriched the information and content of technical support. We have done a certain amount of work from the preparation of instructions to the modification of work instructions and technical training of employees. Increase the popularization of basic knowledge to new employees and strengthen training for employees in special positions (such as smelting furnaces). Assist the manufacturing department to solve problems that arise during the production process of existing equipment and products, such as cleaning of solder, ring sheets and solder strips; improve the melting method to solve the problem of excessive gas content inside the solder product; lower the temperature of the water tank and heat Increase the flow rate of drawing liquid to solve the oxidation problem of solder, etc. Cooperating with the workshop, we successfully completed the relocation of the company's equipment to ensure normal production and stable quality of products. In order to meet the needs of production, assist the workshop to complete the installation and debugging of new equipment and expand production volume.

3. ISO9001 quality management system

Starting from July this year, the company has been running the ISO9001 quality management system to meet the needs of the company's development. During the operation process, our R&D department has formulated a series of system documents, such as "Product Design Procedure", "Technology Update Control Procedure", "New Product Trial Production Management Procedure", "Technical Document Management System", "New Product Standard", etc., which clearly The responsibilities of each position in the R&D department have been clarified and communication between various departments has been strengthened. During the product design and development process, the steps of planning, input, output, review, verification, and confirmation have been improved to ensure the rigor and effectiveness of the product development process. Standardize the department's work according to the system requirements and terms, study the terms carefully, and participate in the internal auditor's examination and achieve good results.

4. Shortcomings

1. Although the relationship with other departments is being strengthened, communication is still lacking. In the work, it is necessary to strengthen communication and cooperation with various departments to ensure the practicality and stability of the product.

2. Lack of R&D personnel. On the one hand, we need to recruit new technical talents, and on the other hand, we need to strengthen direct information and technology communication with customers.

3. While developing new products, strictly control the quality of old products and stabilize the market for existing products. Do not blindly pursue new products and lose the market advantage of old products.

5. Next work plan

1. Conduct market research and position the development direction of the product. Further strengthen the understanding of customer products, actively conduct market research, strengthen cooperation and communication with customers, develop products with reliable usability and high cost performance, and accelerate the company's development.

2. Conscientiously implement the company's quality policy objectives, implement departmental target responsibilities, improve work quality, provide on-site technical support, proactively research existing products, ensure production guidance, and reduce the chance of errors.

3. Based on the new products developed, improve technical documents, prepare relevant process documents and technical documents, improve and improve equipment, and continuously improve production capacity. Annual work summary of the R&D Department (Selected Part 3)

Time flies, and the busy and fruitful 20__ year has passed. On the occasion of bidding farewell to the old and welcoming the new, all of our company gathered together to celebrate It is easy to review the work of the technical department in 20__ at this moment in order to make up for the shortcomings, update concepts, achieve better results in 20__, open up a new situation for the work of the technical department, and lay a solid foundation. In 20__, under the correct and scientific leadership of the company leaders, and with the guidance and assistance of the personnel department, our department adhered to the spirit of excellence, pioneering and advancing with the times, based on the scientific outlook of seeking truth from facts, and persisted in cautious and careful work. Attitude governs all work. In accordance with the requirements of the scientific concept of talents, we have done a good job in building a team of professional and technical talents and achieved certain results.

At the same time, there are also certain deficiencies in the work. We will now summarize the work in 20__ in the following four points:

1. A strong professional and technical team is being built

Due to Company personnel are immature in following procedural guidelines, and all departments are deficient in handling incidents according to procedures, and the technical department is no exception. However, with the strong support of the company's leaders and the vigorous assistance of the company's human resources department, a large number of technical talents have been recruited for the company. According to the needs of the company and in line with the principle of merit-based recruitment, in the continuous efforts, the technology department is gradually leaving And consolidate a strong professional and technical team. However, due to the newcomers' unfamiliarity with the company's products and weak basic professional knowledge, next year's training tasks will still be relatively heavy. However, I believe that with the support of the company's leaders, our department will overcome difficulties and eliminate problems, so that all personnel in the department will achieve rapid improvement in professional skills in the new year.

2. Completed various tasks assigned by the company

Due to various reasons, this year’s work was difficult with heavy tasks and tight time. However, through the correct guidance of the company's leaders and the united efforts, sincere cooperation and unremitting efforts of all personnel in the entire department, it is basically guaranteed that all tasks are completed within the company's specified time, with high standards and strict requirements. This is inseparable from the correct guidance and strong support of the company's leaders and the unremitting efforts of all employees in the department. However, sometimes due to rushing to schedule, there are certain flaws in the drawings such as missing or incorrect dimensions. This is a problem that should be vigorously solved next year, and we strive to avoid and reduce the mistakes that should not be made in the drawings in the new year. 325 specifications drawings.

3. Product aspect

The product transformation has been completed quickly and safely. Next year, CBB65 capacitor will be the first sign of our company. For this sign, we have been negligent in our duties. There are also some areas of confusion,

4. Innovated the process

After the new concept was established, high-precision equipment was purchased, creating conditions for the reform of the process. Due to the backwardness of the original equipment, the original production process can no longer meet the current production reality. With the strong cooperation of various departments of the company, our department has boldly reformed the original process. This innovation has reduced unnecessary The production process improves production efficiency and saves costs for the company. At present, the original welding production process has completed process innovation.

However, the welding cap process still needs to be innovated, which will also be a focus of next year's work.

Looking back on the past, the achievements are gratifying, but the achievements belong to the past and the tasks in the future will be more arduous. While looking at the results, our department also has some problems that need to be solved. For example: it will take a long process to improve the professional knowledge of new employees, the task of innovating the original old processes is still relatively heavy (such as the filling workshop), and the innovation of production technology Issues such as slower development and less research and development of new technologies will be the focus of next year’s work. I believe that in the new year, the technical department will achieve greater results, and I also wish the company to achieve more brilliant achievements!

The technical department will achieve greater results, and I also wish the company to achieve more brilliant achievements! Annual work summary of the R&D Department (Selected Chapter 4)

Time flies, the sun and the moon fly by, and 20__ has passed by in a hurry. In the past year, under the careful cultivation and guidance of the leaders of the unit, through my continuous efforts, I have made great progress and huge gains in terms of ideology, technology and daily work, but there are also many shortcomings. . Looking back on the past year, I now summarize my work as follows:

1. Ideology

Through careful training and patient guidance from leaders at all levels, I have more comprehensively mastered professional knowledge. Enhanced safety awareness and strengthened the cultivation of own abilities; supported the company's various policies and policies, consciously abided by various rules and regulations, concentrated on learning technology, and worked hard to better do their jobs.

2. Work

During the three-month internship period and the one-year trainee life, I participated in the "Shandong Aluminum Project" and "Hengshui City Waste Incineration Flue Gas Purification Treatment" project". In my daily work, I adhere to the principle of "Don't wait for tomorrow for what you do today, and don't wait for others for what you do." I actively complete my duties such as technical briefings and on-site coordination. At the same time, I often participate in the construction process, learn and solve problems in practice, and achieve a true combination of theory and practice.

During the construction process of Hengshui City's garbage incineration flue gas purification treatment project, thanks to the detailed layout and careful guidance of Manager Gao and Manager Zhang, as well as the personal supervision of Manager Wang, the project has basically been completed. With the launch and completion of the project, I gained a lot of valuable experience here and improved my ability to handle problems on site and operate the project. In addition, based on the work experience of my predecessors, I applied the method of combining engineering-related drawing software with theoretical data in the calculation of engineering quantities and the review of drawings, which not only improved the accuracy of the data, but also improved the efficiency of data verification.

3. Existing shortcomings

Over the past year, with the care and support of leaders and comrades, the work has also achieved certain results, but there is still a long way to go before the requirements of leaders and comrades. Quite a gap.

1. Due to the requirements of on-site work, daily working hours are not arranged, resulting in frequent "night trains".

2. Further improvement is needed in comprehensive consideration of issues.

3. Insufficient communication with leaders at work. Sometimes I just immerse myself in pulling the cart.

4. Future work ideas

1. Coordinate and arrange work, understand the priorities of work, and keep good work records.

2. Learn to use your brain at work, think proactively, fully consider problems, and constantly explore working methods and ideas.

3. Actively communicate with leaders, and report any work or ideological problems in a timely manner. I also hope that leaders can criticize and correct shortcomings in my work in a timely manner so that my work can be more perfect.

20__ is a brand new year and a year of self-challenge. I will work hard to correct the deficiencies in my work in the past year, forge ahead, work hard, keep pace with the times, and strive for greater success. progress and achievements. Do a good job in the new year, build on existing work, and contribute to the development of the company. Annual work summary of the R&D Department (Selected Chapter 5)

I joined __ company on March 2, 20__, and have been working as a project assistant for R&D No. 1 since October of the same year. During the past two years of work, I have worked diligently, kept making progress, studied hard, and learned experience. I have coordinated customer relationships, internal communication, project plan planning and production, technical document writing and archiving, event organization and planning, and project promotion and operation, etc. My working ability in all aspects has also been greatly improved and made significant progress, and I have also achieved some results. Here is an introduction to the main content of my current work:

1. Responsible for the launch and follow-up of projects , management, communicating with customers, and coordinating cooperative relationships

At present, the main projects that I have participated in coordination and project management include: __The company's business emergency system, enterprise information communication, and mobile home-school communication management platform, _ _Municipal State Taxation Bureau website, Forestry Bureau touch screen website, __VAT anti-counterfeiting tax control server management system, etc. Mainly responsible for project demand analysis, coordinating the cooperative relationship between the mobile company and the R&D team, following up on project progress, drafting and archiving requirements documents, technical documents, contract plans, etc., and assisting in project acceptance.

Among them, the business emergency system has successfully passed the final inspection in November this year after more than a year of program development, demand changes, function overlay, upgrade and maintenance, and received the final inspection from the mobile company. The qualified report has been affirmed and unanimously praised by users of the mobile company's marketing department, business department, business technology support room, network maintenance room and other departments; Qixintong also passed the preliminary inspection in July this year and is now entering the hardware upgrade stage and is about to enter After the final inspection, users of the mobile company responded well; the national tax website also successfully passed the inspection in September this year; in addition, the mobile home-school management platform has also been put into use in various cities, and its functions are gradually being improved.

2. Responsible for the writing and planning of project bidding plans, planning plans, demand analysis and other documents

Bidding projects that have participated in include __ company's comprehensive application management platform, mobile easy payment system and the distance education management system of the ___ teacher training school in *** City, etc., assisting in the completion of bid documents including the comprehensive application management platform commercial bid, __ mobile home-school connection bid plan, continuing education platform bid plan, etc., for the project The plans planned in the early stage include the overall design plan of the "broadband home-school connection" project, __ mobile home-school connection white paper, comprehensive information management platform white paper, health care system demand analysis, bureau website plan, social security SMS system construction plan, __ city tourism Bureau-enterprise information communication system solutions, etc. The projects participating in the functional framework planning include __ city’s comprehensive information management platform for primary and secondary schools, mobile home-school communication management platform, broadband home-school communication management platform, etc.; among them, in the bidding for the comprehensive application management platform , we were successfully selected as a finalist partner in 20__; ranked second in the bid evaluation of Yipay.

3. Project promotion and website operation

Starting from October, I began to carry out a series of work on the Telecom Broadband Home-School Connect project, including early website functions and email content. Planning, contract revision, project follow-up and early promotion work to 3 pilot schools.

Since its trial operation on December 21, the Telecom Broadband Home-School Green Mailbox System currently has 2,580 mailbox users. I am responsible for arranging training for 3 pilot schools, hoping that through training, teachers will Pay attention to the mailbox and mobilize them to use the educational mailbox. Currently, there are more than 700 activated users, and teachers and students have responded well.

4. Project contract writing, approval process follow-up and archiving

Responsible for the drafting, revision and follow-up of each project contract, high-tech enterprise application, software copyright registration application, etc. Writing relevant information for administrative applications and filing contracts.

5. Coordinate and manage departmental administrative affairs, and formulate objective, reasonable and effective incentive policies

Formulate relevant policies to assist the department in coordinating the relationship between internal colleagues, and formulate "employee image etiquette" Guidelines" to formulate effective incentive policies objectively and rationally.

6. Organize and plan department activities

Successfully planned several activities. New Year's Day dinner, Dragon Boat Festival Happy Valley tours, weekly table tennis and badminton department sports, etc., successfully mobilized the enthusiasm of department colleagues and improved department morale.

7. Future assumptions and determinations

In the past, I have had another fulfilling year in __ company, completing my job with due diligence and doing my best to do my job. arrive. Although there are occasional imperfections in my work, I have gained more work experience through the lessons of failure.

Looking forward to 20__, I will take how to independently manage and control the project circulation process as a personal development goal, strive to promote the progress of each project, coordinate and cooperate with the implementation, promotion, operation and other work of each project, while maintaining the past On the basis of work quality, seek higher-level breakthroughs. I have been working hard in this direction, hoping to make my work more perfect and continuously improve my self-worth.

Here, I sincerely thank my superiors for giving me the opportunity to learn and exercise, as well as their trust and support in my work! I will continue to work hard and strive for greater improvement in future work.